The Radford Army Ammunition Plant (RFAAP) Modernized Pre-Mix and Nitro Cellulose (NC) Dehydration NG3 Facilities
| Location: |
Virginia |
| Posted: |
Jan 9, 2026 |
| Due: |
Jan 30, 2026 |
| Agency: |
DEPT OF DEFENSE |
| Type of Government: |
Federal |
| Category: |
- C - Architect and Engineering Services - Construction
|
| Solicitation No: |
W911S226RA005 |
| Publication URL: |
To access bid details, please log in. |
The Radford Army Ammunition Plant (RFAAP) Modernized Pre-Mix and Nitro Cellulose (NC) Dehydration NG3 Facilities
Active
Contract Opportunity
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
AMC
Sub Command
ACC
Sub Command 2
MISSION INSTALLATION CONTRACTING COMMAND
Sub Command 3
419TH CSB
Office
W6QM MICC-FT DRUM
Looking for contract opportunity help?
General Information
-
Contract Opportunity Type: Sources Sought (Original)
-
Original Published Date: Jan 09, 2026 06:36 am EST
-
Original Response Date: Jan 30, 2026 03:00 pm EST
-
Inactive Policy: Manual
-
Original Inactive Date:
Jan 09, 2027
-
Initiative:
Classification
Description
The Radford Army Ammunition Plant (RFAAP) NG3 Facility Construction is a multi-phased construction approach geared at addressing the four (4) core processes in NG manufacturing (Nitration, Solventless Slurry/Paste, Multi-base Pre-mix, and NC Dehydration). This project will focus on the Pre-Mix and Nitro Cellulose (NC) Dehydration (Dehy) facilities of the design for the new NG-3 facility. Nitrate Esters (NE), such as Nitroglycerin (NG), are critical additives in the production of double and triple-base propellants. RFAAP currently uses 15,000 lbs. of NG daily (3.5M lbs. annually) to support propellant production, which includes both solventless and solvent propellants. Currently, NG is produced on-site in the NG-2 Area by a single nitrator that is over 30 years old. The facility also has a single Slurry/Paste building and a single Pre-Mix building, both of which are 50 years old. Each of these present a single point failure to production and often cause production interruptions. The objective of this project is to prepare a 30% design for Nitro Cellulose (NC) Dehydration (including NC Shredding), hereinafter referred as NC Dehy, and Pre-Mix facilities at Radford Army Ammunition Plant (RFAAP) using the most modern, safe, environmentally friendly, and automated technologies to the maximum extent feasible.
Attachments/Links
Contact Information
Contracting Office Address
-
MICC FORT DRUM 4205 PO VALLEY RD
-
FORT DRUM , NY 13602-5220
-
USA
Secondary Point of Contact
History
-
Jan 09, 2026 06:36 am ESTSources Sought (Original)
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
Follow NATO Business Opportunity: Custodial Services Active Contract Opportunity Notice ID RFP-ACT-SACT-26-62 Related
COMMERCE, DEPARTMENT OF
Bid Due: 6/25/2026
Improve Center Woods Complex Status: Open DBB 120068 Virginia Polytechnic Institute and State
State Government of Virginia
Bid Due: 6/10/2026
RFP 26-176-4342-1 URBAN FORESTRY MASTER PLAN Status: Open RFP 120041 City of Chesapeake
State Government of Virginia
Bid Due: 6/17/2026
RFP-26-27-3349NS - Dental Insurance Status: Open RFP 119890 Hanover County -Hanover County, Virginia
State Government of Virginia
Bid Due: 6/11/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.