| Location: | Washington |
|---|---|
| Posted: | Nov 19, 2025 |
| Due: | Nov 24, 2025 |
| Agency: | City of Spokane |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Date | 11/24/25 1:00pm |
Spokane, WA
This project consists of the construction of approximately 10,000 linear feet of HMA shared use path (12,000 square yards of 3-inch thick HMA and 4-inch thick CSTC), 2700 cubic yards of excavation and embankment, 200 linear feet of storm sewer, 4 drainage structures, 1 20-ft long contractor designed buried structure, 350 linear feet of absorption trench, 400 linear feet of gravity block wall (2.5-4.0 feet tall), 1 pedestrian hybrid beacon system, 100 linear feet of sidewalk, 400 linear feet of cement concrete curb, sundry utility adjustments, and other related miscellaneous items.

With GovernmentContracts, you can:
...Bid Number: CON-2025-50 Bid Title: Construction 24HR Restroom Category: Public Works Status: Open... ...
City of Port Angeles
Bid Due: 6/25/2026
...Abstract: A&E Solicitation KC001640 Title Work Order Construction Management Services... jhaegele@kingcounty.gov Synopsis The ...
King County
Bid Due: 6/23/2026
...Abstract: A&E Solicitation KC001640,2 Title Work Order Construction Management Services... jhaegele@kingcounty.gov Synopsis The ...
King County
Bid Due: 6/23/2026
...Abstract: A&E Solicitation KC001640,1 Title Work Order Construction Management Services... jhaegele@kingcounty.gov Synopsis The ...
King County
Bid Due: 6/23/2026