RFP for Professional Services - Eastside Parallel Trail Segment 2

Location: California
Posted: Dec 15, 2025
Due: Jan 23, 2026
Agency: Half Moon Bay city
Type of Government: State & Local
Category:
  • 99 - Miscellaneous
Solicitation No: 2025-03
Publication URL: To access bid details, please log in.
Bid Number: 2025-03
Bid Title: RFP for Professional Services - Eastside Parallel Trail Segment 2
Category: Public Works Bids
Status: Open
Description:

Greetings!

The City of Half Moon Bay is searching for Design Professionals with Caltrans experience to help us complete the Design and Permitting of our Eastside Parallel Trail, Segment 2 project.

About the Project

The Segment 2 project will complete a critical gap in the Eastside Parallel Trail through Half Moon Bay and provide connectivity along California Highway 1 between the existing Naomi Patridge Trail at Ruisseau Francais Avenue and the future Highway 1 North Trail at Spindrift Way.

Proposed Improvements include:

  • New 12 ft class 1, bicycle/pedestrian trail between Russeau Francais Ave and Spindrift Way.
  • New bicycle/pedestrian bridge over Frenchmans Creek, spanning approximately 200 linear feet.
  • Intersection Improvements at Russeau Francais Avenue to enhance existing crosswalks, add an additional third crossing, and improve grading and drainage.
  • Repair/replace an existing failed wood lagging retaining wall along the south side of the intersection.
  • Bicycle/pedestrian crossing treatments (striping and signage) at Russeau Francais Avenue, Frenchmans Creek Road, and Spindrift Way

Please review the attached RFP, included instructions, and critical dates.

  • Questions regarding the RFP and project materials will be accepted through 4:00pm on Friday, January 9 th , 2026.
  • Proposals are due in electronic (PDF) format by 4:00pm on Friday, January 23 rd , 2026, per the instructions included.

You can find  other information about the project at the City of Half Moon Bay webpage at:

https://www.halfmoonbay.gov/956/Eastside-Parallel-Trail-North---Segment-


Publication Date/Time:
12/15/2025 11:30 AM
Closing Date/Time:
1/23/2026 4:00 PM
Contact Person:
Dale Leda, Interim City Engineer
dleda@halfmoonbay.gov
650-435-8260
Qualifications:
Refer to RFP for all qualifications and conditions.
Related Documents:

Attachment Preview

Request for Proposals (RFP)
Professional Services for
Eastside Parallel Trail, Segment 2
City of Half Moon Bay
Issue Date: December 15, 2025
Due Date: January 23, 2026 at 4:00 PM PST
City of Half Moon Bay
501 Main Street
Half Moon Bay, CA 94403
www.halfmoonbay.gov
Dale Leda
Interim City Engineer
dleda@halfmoonbay.gov
650-435-8260
City of Half Moon Bay
Eastside Parallel Trail, Segment 2
RFP: Professional Services for Eastside Parallel Trail
THIS PAGE INTENTIONALLY LEFT BLANK
Page 2
City of Half Moon Bay
Eastside Parallel Trail, Segment 2
RFP: Professional Services for Eastside Parallel Trail
Table of Contents
1 RFP OVERVIEW .............................................................................................................................................. 5
1.1 PURPOSE OF RFP..............................................................................................................................................5
1.2 PROJECT DESCRIPTION .......................................................................................................................................5
1.3 RFP TIMELINE ..................................................................................................................................................6
1.4 RFP QUESTIONS ...............................................................................................................................................6
1.5 RFP AMENDMENT AND CANCELLATION.................................................................................................................6
1.6 SOQ SUBMITTAL ..............................................................................................................................................6
1.7 FEE SUMMARY SUBMITTAL .................................................................................................................................7
2 CITY OVERVIEW ............................................................................................................................................. 8
3 SCOPE OF SERVICES ....................................................................................................................................... 8
4 MINIMUM QUALIFICATIONS ....................................................................................................................... 12
5 GENERAL PROVISIONS ................................................................................................................................. 12
6 SOQ FORMAT AND SUBMISSION REQUIREMENTS....................................................................................... 13
6.1 SOQ FORMAT ................................................................................................................................................13
6.2 COVER LETTER................................................................................................................................................13
6.3 COMPANY PROFILE..........................................................................................................................................13
6.4 PROJECT UNDERSTANDING & APPROACH ............................................................................................................14
6.5 STAFF QUALIFICATIONS AND EXPERIENCE.............................................................................................................14
6.6 RELEVANT PROJECTS........................................................................................................................................14
6.7 REFERENCES...................................................................................................................................................14
6.8 FEE SUMMARY ...............................................................................................................................................14
7 FIRM SELECTION .......................................................................................................................................... 15
7.1 SOQ EVALUATION & INTERVIEWS......................................................................................................................15
7.2 AWARD OF CONTRACT .....................................................................................................................................15
7.3 BUSINESS LICENSE ...........................................................................................................................................16
7.4 DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) CERTIFICATION ...............................................................................16
7.5 LEGAL DISCLOSURES ........................................................................................................................................16
7.6 BACKGROUND CHECKS .....................................................................................................................................16
7.7 DISADVANTAGED BUSINESS ENTERPRISE (DBE) REQUIREMENTS ..............................................................................16
7.8 SUPPLEMENTAL REQUIREMENTS FOR FEDERAL FUNDED PROJECT .............................................................................17
8 PROTEST TO SPECIFICATIONS OR REQUIREMENTS ...................................................................................... 17
9 RFP TERMS AND CONDITIONS ..................................................................................................................... 17
9.1 REVIEW OF RFP..............................................................................................................................................17
9.2 UNDUE INFLUENCE..........................................................................................................................................17
9.3 NONDISCRIMINATION ......................................................................................................................................17
9.4 SOQ PREPARATION COSTS ...............................................................................................................................18
9.5 SOQ WITHDRAWALS.......................................................................................................................................18
9.6 SOQ ERRORS .................................................................................................................................................18
9.7 INCORRECT SOQ INFORMATION ........................................................................................................................18
9.8 PROHIBITION OF PROPOSER TERMS AND CONDITIONS ............................................................................................18
9.9 RIGHT TO REFUSE PERSONNEL ...........................................................................................................................18
9.10 PROPOSAL OF ADDITIONAL SERVICES ..................................................................................................................18
9.11 LICENSURE .....................................................................................................................................................19
Page 3
City of Half Moon Bay
Eastside Parallel Trail, Segment 2
RFP: Professional Services for Eastside Parallel Trail
9.12 CONFLICT OF INTEREST AND SOQ RESTRICTIONS ...................................................................................................19
9.13 CONTRACT NEGOTIATIONS................................................................................................................................19
9.14 RIGHT OF REJECTIONS ......................................................................................................................................19
9.15 DISCLOSURE OF SOQ CONTENTS........................................................................................................................19
9.16 PROPRIETARY INFORMATION .............................................................................................................................20
9.17 SEVERABILITY .................................................................................................................................................20
9.18 SOQ AMENDMENT .........................................................................................................................................20
9.19 SOQ ABANDONMENT......................................................................................................................................20
9.20 RIGHTS OF THE CITY.........................................................................................................................................20
10 ATTACHMENTS........................................................................................................................................ 21
Page 4
City of Half Moon Bay
Eastside Parallel Trail, Segment 2
RFP: Professional Services for Eastside Parallel Trail
1 RFP Overview
1.1 Purpose of RFP
This Request for Proposals (RFP”) is issued by the City of Half Moon Bay (“City”). The City seeks
Statements of Qualifications (SOQ) from entities ("Proposer(s)") with demonstrated
experience and qualifications in providing Preliminary Engineer, Design, and Environmental
support for specific construction projects occurring within California Department of
Transportation (Caltrans) right-of-ways such as those required in this RFP. The City desires to
enter into an agreement for one (1) year with the option for two (2) one-year renewals upon
satisfactory performance.
1.2 Project Description
The Eastside Parallel Trail Segment 2 project proposes improvements to extend a 12 ft multi-
modal trail on the east side of California State Highway 1 (Highway 1) in the City of Half Moon
Bay between the intersections at Ruisseau Francais Avenue and Spindrift Way. The proposed
project will connect to the existing Naomi Patridge Trail to the north and the future Hwy 1
North Safety & Operations trail to the south, a total distance approximately 2,100 linear feet.
The project will also include a new approximately 200 ft bridge spanning over Frenchmans
Creek to complete the new trail. Improvements will include crossing treatments at three
vehicle intersections at Russeau Francais Avenue, Frenchmans Creek Road, and Spindrift
Way.
At the Ruisseau Francais intersection, additional improvements are desired to enhance the
existing crosswalks, add a southern crossing location and improve connectivity to the existing
trail on the west side of the highway. Anticipated improvements also include new curb gutter
and sidewalk, curb ramps, drainage improvements, signage, and any required signal
reconfiguration. Along the west side of the intersection, a new retaining wall is also
necessary to repair an existing failed wood retaining wall supporting the existing trail
segment. Refer to Attachment 1 below for an illustrative concept plan for the proposed
project. The project will be designed and constructed in one phase.
The scope of professional services requested, as further detailed below, includes the
complete planning, environmental study and design work needed to permit and construct
the project (excluding construction engineering, related inspections and material testing),
which is anticipated to follow the Caltrans DEER project delivery/permit process.
The project team will be required to prepare supporting documents needed for
oversight/approval via the Office of Special Funded Projects (OSFP), including Advance
Planning Study (APS) package and Structure Type Selection Report for the bridge, as well as
all necessary supporting investigation and studies such as Foundation Report and Hydraulics
Report, in accordance with Caltrans requirements.
The scope of work also includes the preparation of all environmental studies and documents
for both CEQA determination and NEPA support, as well as a Coastal Development Permit as
part of the entitlement process with the City of Half Moon Bay.
Page 5
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Project ID: Title: Road Grading - Arroyo Conejo Open Space Addenda: 0 Release ...

City of Thousand Oaks

Bid Due: 6/19/2026

...by means of full depth reclamation via cement treatment (FDR-C) at Tower Road ...

City of American Canyon

Bid Due: 7/09/2026

..., Softball, and Multi-Purpose Fields, Removal of Natural Turf, Grading and Sub-Surface Preparation..., ...

Lynwood Unified School District

Bid Due: 6/10/2026

...Bid Title: Randolph Street and County Line Road Traffic Signal and Intersection Improvements... ...

City of Delano

Bid Due: 7/09/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.