Bid No. 25-26-16I Don Lugo High School MPR Refresh

Location: California
Posted: Mar 25, 2026
Due: Apr 1, 2026
Agency: Chino Valley Unified School District
Type of Government: State & Local
Category:
  • 89 - Subsistence (Food)
  • 99 - Miscellaneous
Publication URL: To access bid details, please log in.
  • Bid No. 25-26-16I Don Lugo High School MPR Refresh

    Notice Inviting Informal Bids

    Scope of Work

    Bid Documents

    Planholders List

  • Attachment Preview

    Chino Valley Unified School District
    Scope of Work for
    Don Lugo HS MPR Refresh
    Estimated Construction Costs: $125,000.00
    Allowance: $12,500.00
    Contractor Duration: 45 Days
    CSLB: Class A or Class B
    The successful contractor shall supply all labor, materials, services, insurance, and equipment necessary
    to complete the work. The Contractor shall thoroughly investigate the premises for a complete
    understanding of the scope of work required for this bid. All materials identified herein are to be
    used by the contractor.
    Demolition:
    * Demolish and dispose of existing flooring materials - carpet and walk off tile.
    Demolish carpet at base of AV room.
    o
    Demolish all baseboards.
    o
    Demolish carpet on stairs.
    o
    * Demolish owner identified surface mounted raceway, conduits, and outlets.
    * Demolish existing ceiling tiles, leaving ceiling tile grid system in place.
    Safe off all ceiling devices and salvage for reinstallation.
    o
    * Demolish and dispose of owner identified ceiling light diffusers.
    * Demolish existing water fountains and water fountain area tiles.
    Safe off water prior to demo, and prep for reconnection.
    o
    * Remove and replace all 1-gang outlets and related covers.
    Style and color to be approved by owner.
    o
    * Remove and replace all other junction boxes, phones, and/or data drop cover plates.
    Style and color to be approved by owner.
    o
    * Remove & replace emergency exit sign at south facing doors.
    Materials - Compass LED Lighted Exit Sign, White, Mfr. Model #CCRGRC.
    o
    Refurbishment
    * Prepare and paint existing ceiling tile grid.
    Preparation of areas for painting includes removal of staples, tape, and other debris so as
    o
    to make a clean, flat paintable surface.
    Paint color for ceiling gride - Vista Beryl Pearl VP 0509 Eggshell
    o
    * Prepare and paint railing, ceiling trim window trim, and mechanical ducting.
    Paint color for trim and ducting - DunnEdwards Chocolate Chunk DE6070 Semi
    o
    * Prepare and paint doors and doorframes, interior and exterior, of all doors.
    Paint dolor for doors and frames - Dunn Edwards Chocolate Chunk DE6070 Semi
    o

    Chino Valley Unified School District
    Scope of Work for
    Don Lugo HS MPR Refresh
    * Prepare and paint exterior of sound booth, MPR windowsills, and side stage CMU walls.
    Paint color for sound booth, sills, and walls - Vista Beryl Pearl VP 0509 Eggshell
    o
    * Prepare and paint existing glue-up ceiling tiles
    Paint color for 12" x 12" ceiling tile - Vista Beryl Pearl VP 0509 Eggshell
    o
    * Replace owner identified ceiling light diffusers.
    Identified - two 2'x4' and two 2'x2' diffusers
    o
    Use Duralens Lighting Panels to match onsite diffusers.
    * Install new 24" x 48" ceiling tiles - Include preparation of ceiling tiles for reinstallation of existing
    devices.
    Materials - Armstrong Dune 2nd Look White
    o
    * Prepare floor for new flooring - square carpet tiles.
    Prepare with Ardex or equivalent floor leveler as necessary.
    o
    * Install new 24" x 24" carpet tiles - Mohawk Flooring.
    Materials - Mohawk, Taking Steps, 858 LI, GT465
    o
    Install warning stripes across all stage steps.
    o
    * Install new baseboards around entire room.
    Materials - Johnsonite, Fudge, 167
    o
    * Install new 24" x 24" carpet tiles - Mohawk Flooring.
    Materials - Mohawk, Taking Steps, 858 LI, GT465
    o
    * Install 24" x 24" walk-off carpet tiles at all doors, and at both drinking fountains
    Materials - Mohawk, First Step II, GT315
    o
    * Prepare walls for installation of new tile at both drinking fountain locations.
    Materials - Dal Tile - Fabrique Creme Linen, P686.
    o
    * Prepare walls for installation of new drinking fountains. All connections, as well as water
    restoration, to be performed by the contractor.
    Materials - Murdock, M-OBR4-GRD, Outdoor Bottle Filler with Bi-Level Drinking Fountain.
    o

    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    Monrovia Library Story Room Expansion Department: Public Works RFP Number: A-1002 Start Date:

    City of Monrovia

    Bid Due: 8/19/2026

    RFB 25-26-30 Annual Contract for Custom Branding Services for Recreation Division Apparel and

    City of Visalia

    Bid Due: 9/03/2026

    0820 - 0820 ON-CALL ELEC. SERVS. FOR EV/PV INSTALLS, AND INSIDE WIREMAN WORK

    City of Los Angeles

    Bid Due: 8/11/2026

    RFx Name: BPM013316 RFx Begin Date (UTC+0): RFQ - AS-NEEDED MEDICAL WASTE REMOVAL

    County of San Diego

    Bid Due: 8/07/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.