| Location: | Missouri |
|---|---|
| Posted: | Aug 12, 2025 |
| Due: | Aug 28, 2025 |
| Agency: | Drexel Technologies |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Date | 8/28/25 11:00am |
Cooper County, MO
Date Issued: 8/12/2025
Sealed bids for the Cooper County Phase 1 Asphalt Overlay on Highway 50, will be received at: Cooper County Commission's Office, 527 High Street, Booneville, MO 65233, until the above time, at the office of the Cooper County Commission, and at that time will be publicly opened and read. All bids shall be submitted in the form of hard copies.
The proposed work includes:
Phase 1 roadway improvements of 2.96 miles of Old Highway 50 in southwest Cooper County except Bridge No. 344030 and approaches. The roadway is approximately 18'-4" wide with 3" tall x 10" wide flared curbs. Improvements to the existing concrete roadway include crack sealing shrinking cracks, coldmilling being/end tapers, coldmilling areas of existing asphalt, coldmilling wedges at each deteriorated concrete joints, patch joint wedges with surface leveling mix.
Submit all questions about meaning or intent of the Bidding Documents to Dustin Berry of Midwest Engineering Group, LLC by phone 660-676-8202 or email dberry@midwest-engineers.com .

With GovernmentContracts, you can:
..., MO 65301. All bids shall be submitted in the form of hard ...
Missouri Department of Transportation(MDOT)
Bid Due: 6/16/2026
...Concrete I-Girder bridge, slope protection, asphalt surface roadway, guard rail, and incidental work. ...
Missouri Department of Transportation(MDOT)
Bid Due: 7/06/2026
...(57,532 square feet). Structure will feature a new reinforced concrete foundation by replacing ...
DEPT OF DEFENSE
Bid Due: 6/15/2026
...quantities of work: Concrete (Grade 4)(AE)(SW).................................... 35.6 Cu. Yds... deposit in the form ...
Drexel Technologies
Bid Due: 6/15/2026