Pactola Loop B Campground Reconstruction Project

Location: South Dakota
Posted: Feb 3, 2026
Due: Mar 10, 2026
Agency: AGRICULTURE, DEPARTMENT OF
Type of Government: Federal
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 1240LT26Q0010
Publication URL: To access bid details, please log in.
Follow
Pactola Loop B Campground Reconstruction Project
Active
Contract Opportunity
Notice ID
1240LT26Q0010
Related Notice
1157967
Department/Ind. Agency
AGRICULTURE, DEPARTMENT OF
Sub-tier
FOREST SERVICE
Office
USDA FOREST SERVICE-SPOC IM
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Solicitation (Original)
  • Original Published Date: Feb 03, 2026 03:11 pm CST
  • Original Date Offers Due: Mar 10, 2026 09:00 am CDT
  • Inactive Policy: Manual
  • Original Inactive Date: Apr 10, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Z1LB - MAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
  • NAICS Code:
    • 237310 - Highway, Street, and Bridge Construction
  • Place of Performance:
    Custer , SD 57730
    USA
Description

PROJECT'S NAME: PACTOLA LOOP B CAMPGROUND RECONSTRUCTION PROJECT



Questions are due by 9:00 a.m. Central Time on February 12, 2026; Quotes are due by 9:00 a.m. Central Time on March 10, 2026. Questions and Quotes shall be emailed by the due dates and time to the Contract Specialist, Janice King, at janice.king@usda.gov AND to the Conracting Officer, Lucas Dahlman at lucas.dahlman@usda.gov.



See Attach 1 - Solicitation Terms and Conditions with its supporting Attachments, Attach 2 -15. Read each document in its entireity. Attachments are located in the Attachments/Links section.



Solicitation Number 1240LT26Q0010 is being issued as a Request for Quotation for The Pactola Campground Loop B Construction Project. The Campground is on a Forest Service loop road adjacent to Pactola Reservoir. The road is approximately 14 ft wide. The road will be modified with curve widening and shaping for drainage and new surfacing. Generally, the road width will be 16’ for one-way traffic and 24’ for two-way traffic. A new 20 parking stall trailhead will be constructed for the Osprey Trail. The existing Osprey Trail trailhead will be repurposed as overflow and boat trailer parking serving Loop B. Furthermore, Loop B currently has 20 spurs that are primitive and poorly defined. The Campground will be improved to have a total of 36 camping spurs as Base Items. There is currently one Host Site, with power, water, and wastewater vault, located near the center of the campground. The Host Site and associated infrastructure will be relocated to the beginning of the Loop, for improved service to campers. The existing Host Site will become a “Volunteer Site” with upgraded water and electric service and continued use of the sewage vault; there is an Option Item to remove and replace the sewage vault with a new concrete vault. Water system work for this project consists of decommissioning the existing pumphouse and replacing it with a new precast concrete treatment building with upgraded plumbing and controls, replacing all the distribution piping and installing new hydrants. Plan sheets showing additional tent sites on the west side of Loop B and a toilet located in the infield of the Osprey Trailhead parking area are for future construction and will not be part of this contract. This is a Congressionally directed Great American Outdoors Act project that will make improvements to the road - to include design, construction and resurfacing. Pactola Campground Loop B will be reconstructed to increase capacity, improve the water system, and improve host sites with repaired sewage vaults. Camp sites will be designed for modern recreational vehicles using modern design and furnished with modern amenities. The Pactola Reservoir Campground is a seasonal campground operated from approximately mid-May to mid-September annually. The Campground has three Loops: A, B, and C. This project is for reconstruction of Loop B. The Project will be referred to as “Pactola Loop B CG” or “Loop B” throughout the Specifications and Contract documents. The water system at Pactola Reservoir Campground consists of a well with a submersible pump, steel below ground water storage tank, and distribution system with 7 points of use. This system is classified as a Transient Non-Community Public water system. The water system is in poor condition. The well needs pump controls, treatment system, and pump house are not functioning properly, are not compliant with codes and require replacement. The distribution system has numerous leaks, is in poor condition and requires replacement. The existing hydrants are not accessible and require upgrades. The stick-built pumphouse building is in poor condition and has inadequate lighting and inadequate ventilation.






Attachments/Links
Contact Information
Contracting Office Address
  • SPOC Intermountain 1400 INDEPENDENCE AVE SW, MS-1138
  • Washington , DC 202500001
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

Feb 12, 2026[Solicitation (Updated)] Pactola Loop B Campground Reconstruction Project
Feb 24, 2026[Solicitation (Updated)] Pactola Loop B Campground Reconstruction Project
Feb 26, 2026[Solicitation (Updated)] Pactola Loop B Campground Reconstruction Project
Mar 3, 2026[Solicitation (Updated)] Pactola Loop B Campground Reconstruction Project
Apr 15, 2026[Award Notice (Original)] Pactola Loop B Campground Reconstruction Project
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow Northern Hills Ranger District Parking Lot Reconstruction, Spearfish, South Dakota Active Contract

AGRICULTURE, DEPARTMENT OF

Bid Due: 6/04/2026

Follow LBNF Under Ground Concrete Work at SURF Active Contract Opportunity Notice ID

ENERGY, DEPARTMENT OF

Bid Due: 6/17/2026

Follow SD FTFW MADI 10(2) & 9000(1) REHAB MADISON WMD HQ ROAD Active

TRANSPORTATION, DEPARTMENT OF

Bid Due: 6/14/2026

Follow Super-Silent 56kW Generator Rental & Installation Active Contract Opportunity Notice ID 140P6026Q0050

INTERIOR, DEPARTMENT OF THE

Bid Due: 6/05/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.