| Location: | North Carolina |
|---|---|
| Posted: | Feb 3, 2026 |
| Due: | Mar 9, 2026 |
| Agency: | City of Charlotte |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY26-RFQ-14 |
| Publication URL: | To access bid details, please log in. |
Project Description: Charlotte Water (CLTWater) is soliciting Statements of Qualifications (SOQ) from qualified engineering companies (Company or Proposer) to provide professional engineering services, design, and construction phase services for the Sugar Creek East Equalization Basin, Pumping Station, and Forcemain Improvements Project (Project).
The East Flow EQ Basin and Grit Facility, constructed in 1997, is located south of the treatment facility along Little Sugar Creek. During high flow events, wastewater flows south by gravity to the Excess Flow Control Chamber via a 54” line. In the Excess Flow Control Chamber, there is a gate that can direct flow to either the McAlpine Creek WWMF or to the Flow EQ Fill Pump Station. With the gate to McAlpine Creek WWMF line closed, wastewater enters the Flow EQ Fill Pump Station and is pumped to the East Fow EQ Basin for storage. Once the storm surge is complete and staff want to empty the East Flow EQ Basin, wastewater can then drain via gravity or Return Flow pumps to the Excess Flow Control Chamber, where it then flows by gravity to McAlpine Creek WWMF.

With GovernmentContracts, you can:
...caulking inside the confined spaces of the clear well, and cleaning and inspection ...
Cape Fear Public Utility Authority
Bid Due: 6/09/2026
...Construction Documents Wilkes Community College Building 7 - Storm Drain Repair N O ...
State Government of North Carolina
Bid Due: 6/30/2026
...the confined spaces of the clear well, and cleaning and inspection of drain ...
State Government of North Carolina
Bid Due: 6/09/2026
...and boilers, as well as digester building improvements (e.g. trench drains, doors, guardrails, ...
City of Charlotte
Bid Due: 6/08/2026