| Location: | New York |
|---|---|
| Posted: | Feb 18, 2025 |
| Due: | Mar 11, 2025 |
| Agency: | The New York State Contract Reporter |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Description: The Project consists of the supplemental handling of materials and disposal of the removed concrete slab, and the stabilization of the seats that have been removed. The removal of the remaining designated seats and to stabilize them and re-installation of all stadium seats with new fasteners. The project includes the removal and disposal and the installation of a new handrail on the east end of the stadium (Third Base Side). The rail is to be replaced in kind and painted red to match the rest of the stadium. Chain link fabric can be used in place of the existing expanded metal panels, please submit specifications for chain link fabric to engineer for approval. Due Date: 03/11/2025 1:30 PMContract Term: Completion date of 5/31/2025 Location: 546 Luce St. Elmira NY 14904 Ad Type: General
|

With GovernmentContracts, you can:
...16 Title: LRRT - Fastener & Pad Replacement Phase 14 CR#: 2139601 Agency: ...
The New York State Contract Reporter
Bid Due: 11/05/2026
...31LU2529 - Fastener & Pad Replacement Phase 14 | Document Holder Registration Add ...
Niagara Frontier Transit Authority (NFTA)
Bid Due: 11/05/2026
...Code: 339993 - Fastener, Button, Needle, and Pin Manufacturing Place of Performance: 913 ...
DEPT OF DEFENSE
Bid Due: 11/09/2026