| Location: | South Carolina |
|---|---|
| Posted: | Sep 30, 2025 |
| Due: | Oct 30, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | H59-N302-CB |
| Publication URL: | To access bid details, please log in. |
Construct a 3,500 sq. ft. addition to HGTC's Automotive Technology Building located on our Conway campus. Addition would be a block building with 3 or 4 bays. Facade would be block on 3 sides and brick along the front to match existing building. Mechanical, electrical, and plumbing will be required.

With GovernmentContracts, you can:
...Delivery Method: Design-Bid-Build Construction Cost Range: $1,750,000 to $2,250,000 Agency Project... in a ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026
...:00pm Project Location: 4700 Broad River Road, Columbia SC Project Delivery Method: Design-Bid-Build...-filter, ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/06/2026
...Method: Design-Bid-Build Construction Cost Range: $2,000,000 to $2,500,000 Agency Project Coordinator... suspended ceilings, ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026
...elevation boardwalk and structures; electrical and mechanical improvements; plumbing; playground.../contractors for Construction Manager ...
City of Clemson
Bid Due: 6/30/2026