Phase I: Installation of approximately 12,200 linear feet of 16-inch Polyethylene liner inside of an existing 16-inch steel waterline and other related required for complete installation. Phase II: Installation of approximately 1,625 linear feet of 16-inch fusible PVC installed by horizontal directional drill (HDD) on both sides of Archer Creek Bridge

With GovernmentContracts, you can:
...Method: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Grand Strand Water... & ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/29/2026
...: manager@e2ofsc.com Telephone: 843-374-8030 Description: Construction of a 100,000-gallon steel... Construction Cost Range: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/25/2026
...: Columbia Project Delivery Method: Design-Bid-Build Construction Cost Range: n/a Prime Contractor..." guidelines ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/16/2026