MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE

Location: Washington
Posted: Oct 1, 2025
Due: Oct 22, 2025
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: W9127N25BA007
Publication URL: To access bid details, please log in.
Follow
MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE
Active
Contract Opportunity
Notice ID
W9127N25BA007
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
US ARMY CORPS OF ENGINEERS
Sub Command
ENGINEER DIVISION NORTHWESTERN
Office
W071 ENDIST PORTLAND
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Oct 01, 2025 09:56 am PDT
  • Original Published Date: Jul 23, 2025 01:37 pm PDT
  • Updated Date Offers Due: Oct 22, 2025 11:00 am PDT
  • Original Date Offers Due: Sep 22, 2025 11:00 am PDT
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Nov 06, 2025
  • Original Inactive Date: Oct 07, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Y1QA - CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
  • NAICS Code:
    • 237990 - Other Heavy and Civil Engineering Construction
  • Place of Performance:
    Toutle , WA 98649
    USA
Description

***16-SEP-25*** THE PURPOSE OF THIS AMENDMENT IS TO UPDATE THE CONSTRUCTION WAGE DETERMINATION WA20250123 DATED 09/12/2025. SEE SUMMARY OF CHANGES. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.



***09-SEP-25*** THE PURPOSE OF THIS AMENDMENT IS TO PROVIDE UPDATED AND CORRECT CUT/FILL REPORT SPREADSHEET CALCULATIONS TITLED "MSH SRS SECONDARY SPILLWAY RAISE - REVISED CUT FILL REPORT AMENDMENT 0004" TO REPLACE THE FORMER A9 VOLUME CALCULATIONS.



***03-SEP-25*** Solicitation Amendment 0003: THE PURPOSE OF THIS AMENDMENT IS TO EXTEND THE BID SUBMISSION DUE DATE TO 11:00 A.M PST ON 22-OCT-2025.



***28-AUG-25*** Solicitation Amendment 0002: THE PURPOSE OF THIS AMENDMENT IS TO ADD THE FOLLOWING FOR INFORMATION ONLY (FIO) HISTORICAL DOCUMENTS WITH PICTURES AND DRAWINGS.

- FOUNDATION PREP AND TREATMENT 1991 FND REPORT

- SRS RAISE FOUNDATION CONDITION_15OCT2012



The purpose of this amendment is to add the following for information only (fio) historical documents with pictures and drawings.



- Foundation Prep and Treatment 1991 fnd Report

- SRS Raise Foundation Condition_15OCT2012



***25-AUG-25*** Amendment 0001 has an updated Wage Determination. Also FIO from 1991 and 2012 respectively.



***01-AUG-25*** Added Plans: Vol II are the For Information Only (FIO) sheets showing previous work done for the SRS, including investigation, RCC and valvehouse (to decommission). The Vol II sheets only have previous work or existing conditions.



***28-JUL-25*** Plans have been uploaded. We have Modeling files for this solicitation that cannot be uploaded, please email me Andrew.J.Sprys@usace.army.mil and I can send these through DoD Safe.



***24-JUL-25*** Having difficulty trying to upload the plans/drawings but we're working on it and they will be available as soon as we are able.



Description of Requirement: The project purpose is to The U.S. Army Corps of Engineers, Portland District, has a requirement to construct an increased level of sediment retention structure providing additional storage and allowing existing river flows. The work includes mobilization/demobilization, river diversion, rock excavation, rock foundation preparation including placement of dental concrete, placement of roller-compacted concrete, outlet works sealing, and incidental related work. This effort is to include all associated works required and described within this Contract package



Project Background. The Sediment Retention Structure was constructed in the Late 80's to store the sediment coming off the avalanche area so that the sediment does not flow down to the low Cowlitz River. The main objective for the project is to keep the level of Protection on the levee systems from Castle Rock to Lexington. There has already been one crest raise in 2012 and this will be the second of three planned crest raises.



The project purpose is to construct an increased level of sediment retention structure providing additional storage and allowing existing river flows. The work includes mobilization/demobilization, river diversion, rock excavation, rock foundation preparation including placement of dental concrete, placement of roller-compacted concrete, outlet works sealing, and incidental related work. This effort is to include all associated works required and described within this Contract package.



The work will be located at the Sediment Retention Structure on the North Fork Toutle River in Cowlitz County, Washington, off of Highway 504. Contractor access to the work site will be from gravel access roads on the dam site, the gravel roadway on top of the embankment dam, the top of the concrete outlet works structure, and a paved roadway on the spillway approach pier west of the existing spillway crest.



Purpose: The project purpose is to construct an increased level of sediment retention structure providing additional storage and allowing existing river flows. The work includes mobilization/demobilization, river diversion, rock excavation, rock foundation preparation including placement of dental concrete, placement of roller-compacted concrete, outlet works sealing, and incidental related work. This effort is to include all associated works required and described within this Contract package.



The work will be located at the Sediment Retention Structure on the North Fork Toutle River in Cowlitz County, Washington, off of Highway 504. Contractor access to the work site will be from gravel access roads on the dam site, the gravel roadway on top of the embankment dam, the top of the concrete outlet works structure, and a paved roadway on the spillway approach pier west of the existing spillway crest


Attachments/Links
Contact Information View Changes
Contracting Office Address
  • KO CONTRACTING DIVISION 333 SW FIRST AVE
  • PORTLAND , OR 97204-3495
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

Jun 4, 2025[Sources Sought (Original)] Mt. St. Helens Sediment Retention Structure 2nd Crest Raise
Jun 30, 2025[Presolicitation (Updated)] Mt. St. Helens Sediment Retention Structure Crest Raise
Jul 23, 2025[Solicitation (Original)] MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE
Jul 24, 2025[Solicitation (Updated)] MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE
Jul 25, 2025[Solicitation (Updated)] MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE
Jul 28, 2025[Solicitation (Updated)] MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE
Aug 1, 2025[Solicitation (Updated)] MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE
Aug 14, 2025[Solicitation (Updated)] MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE
Aug 25, 2025[Solicitation (Updated)] MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE
Aug 28, 2025[Solicitation (Updated)] MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE
Sep 3, 2025[Solicitation (Updated)] MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE
Sep 8, 2025[Solicitation (Updated)] MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE
Sep 9, 2025[Solicitation (Updated)] MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE
Sep 16, 2025[Solicitation (Updated)] MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE
Sep 30, 2025[Solicitation (Updated)] MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE
Oct 15, 2025[Solicitation (Updated)] MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE
Oct 22, 2025[Solicitation (Updated)] MOUNT SAINT HELENS SEDIMENT RETENTION STRUCTURE CREST RAISE
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...,Concrete Resurfacing Services,Concrete/Formed/Flatwork/Foundation,Crack Sealing Repair..., Crack Sealing Repair and/or Maintenance, Culinary Water Improvements, ...

City of Wenatchee

Bid Due: 6/16/2026

...linear feet of storm sewer, 67 wheelchair ramps, 2400 linear feet of concrete ...

City of Spokane

Bid Due: 6/08/2026

...linear feet of storm sewer, 67 wheelchair ramps, 2400 linear feet of concrete ...

City of Spokane

Bid Due: 6/08/2026

...linear feet of storm sewer, 67 wheelchair ramps, 2400 linear feet of concrete ...

City of Spokane

Bid Due: 6/08/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.