| Location: | Georgia |
|---|---|
| Posted: | Mar 13, 2025 |
| Due: | Apr 10, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-66249-NONST-2025-000000042 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66249-NONST-2025-000000042 | Knights Creek Trunkline Rehabilitation Phase 2 | Valdosta, City Of |
Mar 13, 2025 @ 10:01 AM
|
Apr 10, 2025 @ 10:00 AM
|
Start Date: Mar 13, 2025 @ 10:01 AM ET
End Date:
Apr 10, 2025 @ 10:00 AM ET
Sealed bids will be received by the City of Valdosta at the office of the City Engineer, City Hall Annex Building, 300 N. Lee Street, Valdosta, Georgia, until 10:00 AM, Local Time, on Thursday, April 10th, 2025 for installation of +/- 2,450 LF of 24¿ gravity sewer including related work. The work consists of clearing and grubbing of the easement area as well as supplemental work areas required by the contractor, commissioning of a preconstruction as-built survey of the existing infrastructure to serve as a performance benchmark for new construction, establishment and maintenance of an appropriately sized bypassing arrangement to maintain sustained operation of the sewer system (without overflows) during the work period, demolition of the existing gravity sewer system as necessary, installation of +/- 2,450 LF of 24¿ gravity sewer piping, installation of
six (6) new 60¿ DIA precast concrete sewer manholes, maintenance of erosion control measures during construction, final stabilization of all disturbed areas with permanent grassing, and commissioning of a final as-built survey of the newly constructed infrastructure. The new sewer system may be 24¿ SDR26 PVC gravity sewer installed by way of open cut, 24¿ DR17 HDPE gravity sewer installed by way of pipe bursting, or some combination of the two methodologies. If a blended construction methodology is intended to be utilized, the existing manhole spacing must be maintained and pipe materials must be consistent from manhole to
manhole.
| Code | Description |
| 89030 | Manholes, and Manhole Covers, Frames, Grates, Rings, Yokes, etc. |
| 91219 | Clearing and Grubbing Services |
| 91242 | Drilling and Boring Services, Horizontal Directional (HDD and HDB) |
| 91244 | Excavation Services |
| 91340 | Construction, Pipeline, Including Aerial Crossings |
| 91356 | Construction, Utility and Underground Projects |
| 91362 | Construction, Concrete, Pour-In-Place, Form, Place, Finish |
| 98815 | Fence Installation, Maintenance and Repair |
Chelsea Nevels
cnevels@valdostacity.com
229-259-3530

With GovernmentContracts, you can:
...Description 91356 Construction, Utility and Underground Projects 96185 Utility Services, Water BuyerContact: Eric ...
State Government of Georgia
Bid Due: 6/25/2026
...and Repair, Sewer and Storm Drain, Including Removal 91389 Maintenance and Repair, Utility ...
State Government of Georgia
Bid Due: 6/25/2026
...LOWNDES COUNTY UTILITIES DEPT. - STEVE STALVEY 229-671-2504 LEA PROJECT ENGINEER - CLAYTON ...
Lowndes County
Bid Due: 6/11/2026
...and Underground Projects 91356 Construction, Utility and Underground Projects 91345 Construction, Sewer and ...
State Government of Georgia
Bid Due: 6/16/2026