| Location: | Missouri |
|---|---|
| Posted: | Oct 17, 2024 |
| Due: | Dec 5, 2024 |
| Agency: | State Government of Missouri |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | R2407-01 |
| Publication URL: | To access bid details, please log in. |
The project includes removal of the existing overlay metal roof and hugger system, including hugger system nailer/purlins over existing metal roof. Remove existing gutters, downspouts, flashing, etc. Install all new polyvinyl-chloride (PVC) roofing system over original metal roof, new insulation and coverboard. Install all new flashing systems, gutters, downspouts and splash pads, etc. Work also includes selective interior demolition of the existing PEMB Insulation system at the roof level to be trimmed neatly at girt locations and prepare exposed underside of existing roof panel to be painted. Additional demolition includes selective demolition of existing overhead door tracks that are abandoned and no longer in use at both the south and north hanger bays.
Tunde Howser 31 W High St Room 730 Jefferson City MO, 65101 United States Tel: 573-751-0053 april.howser@oa.mo.gov

With GovernmentContracts, you can:
...Request for Bids for Selective Deconstruction and Demolition Contracting Services - 3509 Page ...
City of St. Louis
Bid Due: 6/19/2026