| Location: | Virginia |
|---|---|
| Posted: | Aug 27, 2026 |
| Due: | Sep 8, 2026 |
| Agency: | State Government of Virginia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | QQ 127293 |
| Publication URL: | To access bid details, please log in. |
County of Fairfax
Closing On: 9/8/26 4:00 PM
Time Left: 11 days, 21 hours
The Contractor shall provide all labor, supervision, materials, new equipment, permits, inspections, and technical expertisenecessary to remove existing components, including electrical connections where required, and furnish and install new fireprotection equipment. Contractor shall field verify all dimensions, existing conditions, piping arrangements, equipment locations,and system configurations prior to installation. The scope of work includes, but is not limited to, the items described herein. TheContractor shall deliver a complete and fully operational system, including all materials, fittings, couplings, supports, hangers, trim,and accessories required for a complete installation, whether specifically listed or not.
QQ Non-Prof Serv
Â
View Opportunity
Add to Favorites
With GovernmentContracts, you can:
...Project ID: 27012 Title: CSRM Phase 1A Floodwall Construction - Preload & Wick ...
City of Norfolk
Bid Due: 11/05/2026
...testing, hydro jetting and evaluations of the drain, waste and vent system. BACKGROUND: ...
DEPT OF DEFENSE
Bid Due: 11/19/2026