| Location: | Michigan |
|---|---|
| Posted: | Aug 25, 2025 |
| Due: | Sep 10, 2025 |
| Agency: | City of Jackson |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Wastewater Treatment Plant Steam Boiler Replacement
Addenda: 0
Release Date: 8/25/2025
Due Date: 9/10/2025
The City of Jackson is accepting bids from qualified contractors for the removal and replacement of the existing boiler located in the maintenance garage of the Wastewater Treatment Plant. Bids shall include the removal and replacement of the existing boiler, 100-gallon condensate receiver tank with alternating pumps and low-water shut-off, chemical feed pump taps, boiler vent piping, and lengths of steam piping.

With GovernmentContracts, you can:
..., and others) over the last five years that have the ability to ...
Great Lakes Water Authority
Bid Due: 8/27/2026
..., and others) over the last five years that have the ability to ...
Great Lakes Water Authority
Bid Due: 8/27/2026
...a.m. at the Wastewater Treatment Plant located at 100 Merchant Street, Port Huron, ...
City of Port Huron
Bid Due: 8/27/2026