JOSH STEIN
GOVERNOR
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
DANIEL H. JOHNSON
SECRETARY
March 11, 2026
To:
From:
Subject:
Prospective Bidders
Neil Butler, Division Proposals Engineer
Invitation to Bid
Let Date:
Time:
Public Reading
Location:
Bid Bond:
April 1, 2026
2:00 PM
NCDOT Division 6 Conference Room
558 Gillespie Street, Fayetteville, N.C. 28301
No Bid Bond Or Bid Deposit Required
The North Carolina Department of Transportation is requesting bids for the project listed below. The availability date
for this project is May 1, 2026. The completion date for this project is April 30, 2027.
Contract:
TIP No.:
Federal
Aid:
WBS:
D6RS.POC.028
---------
State Funded
TBD
Route:
Location:
County:
Description:
Various Interstate and
Primary Routes
Goal
Type:
MBE/WBE
Various
Amount: NO GOAL
Bladen, Columbus,
Cumberland, Harnett &
Robeson
Roadway Sweeping, Large Debris Removal and Storm Drain
Cleaning
Prequalifying to Bid: All prospective bidders shall be prequalified as a Bidder or PO Prime Contractor with the
Department of Transportation prior to submitting a bid, in conformance with provision SPD 01-410. Contractors who
are not prequalified may obtain information and forms for prequalifying from the Contractual Services Management
Section of the Contract Standards and Development Unit at
https://connect.ncdot.gov/business/Prequal/Pages/default.aspx. All required prequalification statements and
documents shall be filed with the Contractual Services Management Section at least four weeks prior to the date of
opening bids.
The Department of Transportation hereby notifies all bidders that it will affirmatively ensure that in any contract
entered into pursuant to this Invitation to Bid, Minority Business Enterprises will be afforded full opportunity to
submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or
national origin in compensation to this award.
The provisions of Articles 102-10 and 103-7 of the Standard Specifications for Roads and Structures are waived for
this project. No bonds required.
Mailing Address:
NC DEPT. OF TRANSPORTATION
DIVISION SIX
PO BOX 1150
FAYETTEVILLE, NC 28302
Telephone: (910) 364-0603
Website: www.ncdot.org
Location:
NC DEPT. OF TRANSPORTATION
DIVISION SIX
558 GILLESPIE ST.
FAYETTEVILLE, NC 28301
Invitation to Bid
Page |2
Proposals, plans and any other supporting documentation, including addendums if needed, may be downloaded free
of charge from the Division Six web site, located at:
https://connect.ncdot.gov/letting/Pages/Letting-List.aspx?let_type=6&let_status=Advertised.
Electronic bidding is not available for this proposal. The entire, completed Proposal, with the itemized Contract Bid
Form Sheet attached, shall be placed in a sealed envelope, and shall be delivered to, and received in the appropriate
office as stated above. See Instructions To Bidders on page C-4 & C-5 of the proposal for more detail.
Should you have questions, or need additional information, please contact Neil Butler, Division Proposals Engineer
at jnbutler@ncdot.gov or Julio Williams, Assistant Division Proposals Engineer at jbwilliams7@ncdot.gov or either
by phone at 910-364-0603.
cc: Lee Jernigan, P.E.
Rob Stone, P.E.
Kenneth Clark, P.E.
Jason Salisbury, P.E.
Blythe Jordan, PLS
Steve Kendall, P.E.
Christy Huff, P.E.
David Plummer
Invitation to Bid
Page |3
Notice Regarding Upcoming Buy America Changes
On January 14, 2025, the Federal Highway Administration (FHWA) terminated its General Waiver for Manufactured Products
and established specific Buy America requirements for their use on Federal-aid highway projects.
This means that as of the following dates, materials defined as manufactured products permanently incorporated into Federal-
aid highway projects will have to be manufactured in the United States.
Key Implementation Dates
• Phase 1: contracts obligated on or after October 1, 2025
o Final assembly of all manufactured products permanently incorporated into Federal-aid highway projects
must occur in the United States.
• Phase 2: contracts obligated on or after October 1, 2026
o Final assembly of all manufactured products permanently incorporated into Federal-aid highway projects
must occur in the United States.
AND
o The cost of U.S.-produced components in manufactured products must be greater than 55% of the total cost
of all components.
Definition of Manufactured Products
Manufactured Products are defined as articles, materials, or supplies that:
• Have been processed into a specific form and shape, or
• Have been combined with other articles or supplies to create a product with different properties than the individual
articles, materials, or supplies.
This places greater emphasis on using domestically produced materials on these projects and is consistent with the Build
America, Buy America Act (BABA) under the Bipartisan Infrastructure Law (BIL).
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.