Project Description: In 2025, the City of Roswell received HMGP funding to install a 1000kW, 480V, three-phase generator at its Water Treatment Plant. The generator has been purchased, and its location was finalized during the pre-application process. The location of the generator cannot be changed. The city seeks professional engineering services to provide construction drawings and specifications and provide limited construction oversight.

With GovernmentContracts, you can:
Follow Cross Over Network Waveguide Assembly Qualification and Production (P/Ns G638416-1) Active Contract
DEPT OF DEFENSE
Bid Due: 11/18/2026
Follow Repair/Overhaul of Flat Panel Up Front Controller (FPUFC) Active Contract Opportunity Notice
DEPT OF DEFENSE
Bid Due: 11/25/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-33658-NONST-2027-000000006
State Government of Georgia
Bid Due: 11/23/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-77035-NONST-2027-000000047
State Government of Georgia
Bid Due: 11/19/2026