| Location: | Illinois |
|---|---|
| Posted: | Jan 9, 2025 |
| Due: | Jan 28, 2025 |
| Agency: | Gurnee village |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
PUBLIC NOTICE
RFP NOTICE
VILLAGE OF GURNEE
LIFT STATION CONTROL PANELS REPLACEMENT PROJECT
The Village of Gurnee will accept sealed proposals for the installation of lift station control panels at four locations in Gurnee. Proposals will be accepted until 10:30 AM on January 28, 2025, and at that time, will be publicly opened and read. Proposals are to be sealed and marked “LIFT STATION CONTROL PANELS REPLACEMENT PROJECT - SEALED BID” and delivered to the Public Works Department at 1151 Kilbourne Road, Gurnee, IL 60031.
The project includes the installation of the following: Stainless steel control panel, pump controller and associated electrical components, manual transfer switch and associated generator receptacle, communication equipment for SCADA controls and monitoring.
Beginning January 7, 2025, detailed specifications for the LIFT STATION CONTROL PANELS REPLACEMENT PROJECT can be obtained online at:
https://www.gurnee.il.us/government/transparency-portal/bids-rfps.
A mandatory pre-proposal meeting will be held on Tuesday, January 14, 2025, at 10:00 AM at 1151 Kilbourne Rd, Gurnee, IL. Contact Water Utility Manager, Brett Fritzler, for information at (847) 599-6800.
The Village Board of Trustees reserves the right to reject any proposal for failure to comply with all of the requirements of this notice or any proposal documents; however, it may waive any minor defects or informalities at its discretion.
The Village Board of Trustees reserves the right to reject any and all proposals and to award a contract which, in its judgment, is in the best interest of the Village of Gurnee.
Download the Request for Proposal for bid information and instructions.

With GovernmentContracts, you can: