| Location: | Texas |
|---|---|
| Posted: | Aug 3, 2026 |
| Due: | Aug 18, 2026 |
| Agency: | City of Greenville |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: ALUMIUM SULFATE W5 % COPPER SULFATE:
Addenda: 0
Release Date: 8/3/2026
Due Date: 8/18/2026
It is estimated that 100 wet tons of aluminum sulfate with 5% copper sulfate will be required annually in the operation of the City of Greenville Water Production Plant, during the period of October 1, 2026, through September 30, 2027.

With GovernmentContracts, you can:
...for precision fabrication of carbon-steel, stainless-steel, and aluminum research components. The Contractor...
The University of Texas at Austin
Bid Due: 9/24/2026
...and repair flooring in walk-in Coolers and Freezers with Aluminum Diamond. ? Walk- ...
Waco Independent School District
Bid Due: 10/08/2026
...fabrication of carbon-steel, stainless-steel, and aluminum research components. The Contractor shall...
State Government of Texas
Bid Due: 9/24/2026
...Management, Direct Injection and Variable Valve Timing, includes aluminum block construction (355 hp...
JUSTICE, DEPARTMENT OF
Bid Due: 10/14/2026