| Location: | Texas |
|---|---|
| Posted: | Aug 3, 2026 |
| Due: | Aug 18, 2026 |
| Agency: | City of Greenville |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: ALUMIUM SULFATE W5 % COPPER SULFATE:
Addenda: 0
Release Date: 8/3/2026
Due Date: 8/18/2026
It is estimated that 100 wet tons of aluminum sulfate with 5% copper sulfate will be required annually in the operation of the City of Greenville Water Production Plant, during the period of October 1, 2026, through September 30, 2027.

With GovernmentContracts, you can:
...; 90694-Water Supply, Treatment And Distribution - Architectural; 91356-Construction, Utility... Engineering; 92567-Mechanical Engineering; ...
State Government of Texas
Bid Due: 10/01/2026
...-acre wetland water reuse project augmenting water supplies for the area. TRWD also ...
Tarrant Regional Water District
Bid Due: 11/05/2026
..., multiple pump stations and a two-thousand-acre wetland water reuse project augmenting water ...
Tarrant Regional Water District
Bid Due: 10/20/2026
...RFP 2026-009 - Water Line Replacement (Parts Only) on E. Neches St. (PDF) ...
City of Palestine
Bid Due: 9/29/2026