| Location: | Hawaii |
|---|---|
| Posted: | Feb 13, 2026 |
| Due: | Feb 25, 2026 |
| Agency: | General Contractors Association |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project Description: The work required to be performed by the Contractor consists of removal and replacement work of the mechanical, electrical, control, and structural systems at the Central Chiller Plant building at the University of Hawaii Hilo at Hilo, Hawaii. Work includes replacement of the existing Chiller No.1 with an energy efficient water-cooled chiller, complete with associated pipes, valves, and accessories. Work also includes revision and expansion of the existing DDC control for the new chiller equipment, new refrigerant exhaust fan, new refrigerant gas sensors and updated refrigerant gas monitoring system, hazardous material remediation, electrical power to all new chiller equipment and associated accessories, and providing a third-party commissioning agent to test all newly installed equipment.
| Download |
|
Plans
Specifications
|
Addendums/Amendments
B2026000030 - Addendum No. 1.pdf
|

With GovernmentContracts, you can:
...; APPURTENANCES AND VARIOUS DRINKING WATER PIPE REPAIR AND MAINTENANCE FITTINGS details view ...
General Contractors Association
Bid Due: 12/07/2026
...Water Pipe Repair and Maintenance Fittings Category: Goods Jurisdiction: Kauai Board of Water ...
State Government of Hawaii
Bid Due: 12/07/2026
...from the pipe flange connected to the topo of the fuel tank. Attachments ...
State Government of Hawaii
Bid Due: 11/29/2026
...infrastructure. Fire Protection: A complete fire alarm-mass notification system and wet-pipe sprinkler...
DEPT OF DEFENSE
Bid Due: 11/24/2026