| Location: | Colorado |
|---|---|
| Posted: | Jun 14, 2026 |
| Due: | Jun 24, 2026 |
| Agency: | City of pueblo |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-029 |
| Publication URL: | To access bid details, please log in. |
Project ID: 26-029
Title: Stormwater Improvements - Pikes Peak Park
Addenda: 1
Release Date: 5/26/2026
Due Date: 6/24/2026
In general, this stormwater improvement project will consist of installation of storm sewer pipe, headwall and wingwalls, fine grading of a detention/water quality pond, installation of riprap trickle channels, and native vegetation establishment of the detention/water quality pond. Sun Mountain Blvd development requires that the detention facility improvements of Pikes Peak Park Subdivision be completed before Sun Mountain Boulevard can be built.
These improvements were designed back in 2023 with the Pikes Peak Park Subdivision that currently has not been developed. With the construction of Sun Mountain Blvd from 24th St to 31st St scheduled for this year these improvements are necessary to safely convey stormwater flows and serve the road for flood control and water quality per the City of Pueblo Stormwater Criteria and MS4 permit requirements.

With GovernmentContracts, you can:
...Program Requirements Prequalification: Each bidder must be prequalified in category 1E(2) Sewer... Description ...
City of Denver
Bid Due: 8/11/2026
...Contract No. 202684690 Status Open Summary Phase 1 rehabilitates the Tower Road Sanitary ...
City of Denver
Bid Due: 8/04/2026
...FACILITIES NAICS Code: 237110 - Water and Sewer Line and Related Structures Construction ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 8/07/2026
...racks, etc...), and sewer (storm and sanitary conduits) components including, but not limited...
City of Denver
Bid Due: 8/27/2026