| Location: | Utah |
|---|---|
| Posted: | Aug 3, 2026 |
| Due: | Aug 25, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CR27008 |
| Publication URL: | To access bid details, please log in. |
Project Description: Stage II Invitation to Bid
Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid on this project.
The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the referenced project:
Project Description: This project includes removing and replacement of a direct buried condensate line between two concrete vaults with insulated piping. The contractor shall be responsible to provide the correct slope of the condensate line between the two vaults. Contractor shall provide new asphalt paving of the removed parking lot and road. Provide new curbing, gutter and sod repair where applicable.
Construction Cost Estimate: $490,000.00

With GovernmentContracts, you can:
...Project: DFCM Construction - Prequalified Mechanical Stage II - Department of Health and ...
State Government of Utah
Bid Due: 10/06/2026
...are eligible to bid on these services. "The State of Utah - Division ...
State Government of Utah
Bid Due: 10/12/2026
...of the trunk line, including odor control, tributary and sewer service lateral connections.... ...
State Government of Utah
Bid Due: 9/30/2026
...Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS NAICS ...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 9/23/2026