| Location: | Utah |
|---|---|
| Posted: | Aug 3, 2026 |
| Due: | Aug 27, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | SLCDA-DCM-542703, 542704, 542705 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project consists of three different phases of work that include:
a. Security Checkpoint Demo & Expansion: This project expands the TSA queue lanes eastward requiring demolition of existing restroom and baggage storage offices (BSO). Work includes the following new work items: drywall, ceiling, fire alarm and suppressions, terrazzo, doors, MEP, cameras, PA system, and signage.
b. Baggage Storage Office (BSO) Expansion: This project includes construction of 5 new baggage storage offices (BSO) located at the southwest corner of the terminal building. Each office includes a reception area and storage area and would be built to closely match the BSO offices at the southeast corner.
c. Escalator & Stairs Terminal Level 1 to Level 2: This project will install a second 32” escalator from the Level 1 checkpoint up to Level 2. This new escalator will be installed where the existing stairs are, adjacent to the existing escalator. The existing stairs will be relocated to be above the existing Sally Port, which will also be modified. Work includes demo and new construction for flooring, ceiling, walls, MEP, fire system, and lighting. The work also requires relocation of a major cable tray.

With GovernmentContracts, you can: