Project: The Gate House HVAC and Electrical Upgrades Project – Re-Bid
Owner: The Gate House
Engineer: Peters Consultants, Inc.
?? 2701 Columbia Boulevard, Bloomsburg, PA 17815
Deadline: October 23, 2025, at 11:00 AM (local time)
Submission Options:
Online via PennBid
Hard copy sealed bids delivered to Peters Consultants, Inc.
Mark envelope: “Sealed Bid for The Gate House HVAC and Electrical Upgrades Project – Re-Bid”
Bid Opening: October 23, 2025, at Engineer’s office
Review & Award: Bids reviewed by The Gate House; contract award contingent upon SEDA-COG approval for CDBG compliance
Date: October 15, 2025
Time: 2:00 PM
Location: On site at The Gate House, 21 Gatehouse Drive, Danville, PA 17821
Attendance: Optional
Install a new HVAC system and complete electrical upgrades throughout the building
Mechanical Work:
12 wall-mounted units with wireless thermostats (all major rooms)
Retain existing heating system for backup/supplemental use
3 outdoor condenser inverters (1 per floor) with underground piping/electrical connections through basement
Concealed infrastructure routed near existing radiator pipes
Conceal lines with crown molding around room perimeter; use boxed corners for vertical runs
No additional exterior-mounted components
Electrical Work:
Miscellaneous upgrades as specified in Part III, Section 04060 of Contract Documents
Contracts:
Mechanical Construction
Electrical Construction
If separate contractors are selected, coordination is required
Completion Timeline:
Substantial completion within 45 calendar days of Notice to Proceed
Final completion by end of December 2025
Online: http://PennBid.Bonfirehub.com
Hard Copy: Available from Peters Consultants, Inc. for $45 (+$25 shipping if needed)
In-Person Review: Free at Engineer’s office, weekdays 8:00 AM – 4:30 PM
Bid Bond: 10% of total bid required
Upon Award: Contractor must provide required bonds, insurance, and submittals
Davis-Bacon wage rates apply
Equal Employment (EO 11246):
Female participation goal: 6.9%
Minority participation goal: 1% (on-site construction; contracts > $10,000)
MBE/WBE & Section 3 Requirements:
MBE goal: 5%
WBE goal: 3% (contracts ≥ $25,000)
Section 3 goals (if HUD/CDBG funding > $200,000):
25% of labor hours = Section 3 workers
5% of labor hours = Targeted Section 3 workers
Documentation of solicitations/commitments must be submitted with bid
Section 3 businesses may receive preference
The Gate House may:
Hold bids up to 60 days (or as allowed by law)
Reject any or all bids
Waive irregularities
Negotiate contract amounts
Non-Discrimination Statement: The Gate House does not discriminate on the basis of race, color, national origin, sex, religion, age, disability, or familial status.
Issued by:
SEDA-Council of Governments
Contact: Ms. Leslie Hosterman, Project Coordinator
| Attachment | Size |
| Newspaper Ad - Re-Bid.pdf | 209.84 KB |

With GovernmentContracts, you can: