The Proposals shall be for furnishing all labour, equipment, material, software, and on-site services for the supply, assistance in installation, and commissioning of .1 all controls, MCC's, breakers, motor starters VFD's, load transfer equipment and associated appurtenances necessary for complete and functional operation. Services will include design, manufacturing, testing, supply, delivery, commissioning, and operator training. Installation of the equipment will be by others.
The Proposals shall be for furnishing all labour, equipment, material, software, and on-site services for the supply, assistance in installation, and commissioning of .1 all vertical turbine pumps, electric motors, appurtenances and tools required for the intended use of the pumps. Services will include design, manufacturing, testing, supply, delivery, commissioning, and operator training. Installation of the equipment will be by others.
The Proposals shall be for furnishing all labour, equipment, material, software, and on-site services for the supply, assistance in installation, and commissioning of .1 standby diesel electric generator,
appurtenances and tools required for complete and functional operation. Services will include design, manufacturing, testing, supply, delivery, commissioning, and operator training. Installation of the equipment will be by others.
Show more description
Show less description
Contract duration
The estimated contract period will be 13 month(s), with a proposed start date of 2024/11/22.
Partner with another business
The functionality to add your company name to the list of interested businesses is temporarily unavailable.
This list does not replace or affect the tendering procedures for this procurement process. Businesses are still required to respond to bid solicitations, and to compete based on the set criteria.
For more information please read the Terms of use
.