Truck Bed Upgrade on Oconee Ranger District, Georgia

Location: Georgia
Posted: Jul 9, 2026
Due: Jul 19, 2026
Agency: AGRICULTURE, DEPARTMENT OF
Type of Government: Federal
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
Solicitation No: 12444026Q0126
Publication URL: To access bid details, please log in.
Follow
Truck Bed Upgrade on Oconee Ranger District, Georgia
Active
Contract Opportunity
Notice ID
12444026Q0126
Related Notice
Department/Ind. Agency
AGRICULTURE, DEPARTMENT OF
Sub-tier
FOREST SERVICE
Office
USDA-FS, CSA EAST 2
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
  • Original Published Date: Jul 09, 2026 01:50 pm EDT
  • Original Date Offers Due: Jul 19, 2026 09:00 am EDT
  • Inactive Policy: 15 days after date offers due
  • Original Inactive Date: Aug 03, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: J023 - MAINT/REPAIR/REBUILD OF EQUIPMENT- GROUND EFFECT VEHICLES, MOTOR VEHICLES, TRAILERS, AND CYCLES
  • NAICS Code:
    • 811121 - Automotive Body, Paint, and Interior Repair and Maintenance
  • Place of Performance:
    GA 31024
    USA
Description

*see attachments



Statement of Work (SOW)

2026 Chevrolet 3500 HD (Single Rear Wheel)

OEM Bed Removal and Installation of CM Truck Bed – Model 8'6/84/54/42



1. Vehicle Information

• Make/Model: 2026 Chevrolet 3500 HD

• Configuration: Single Rear Wheel

• Current Condition: Equipped with factory‑installed OEM pickup bed and back up camera on factory installed bed

• VIN: 1GC4KSEY1TF291258



2. Contractor Responsibilities

The contractor shall perform the following:



A. Removal of Factory Bed

• Safely disconnect all electrical, back up camera, sensors, fuel filler, and auxiliary connections tied to the OEM pickup bed.

• Remove factory bed without damage to the truck frame, chassis wiring, or components.

• Inspect and clean mounting points on the frame after bed removal.



B. Preparation for Upfit

• Verify chassis measurements and mounting compatibility for CM model 8'6/84/54/42.

• Ensure all wiring harnesses, lighting connectors, and fuel filler components are positioned for proper integration with the new bed.

• Provide any necessary mounting hardware if not included by the manufacturer.



C. Installation of CM Truck Bed (Model 8'6/84/54/42)

• Properly mount and secure the CM bed to manufacturer specifications and torque requirements.

• Align and install fuel filler neck, rear lighting, license plate lighting, and reverse sensors (if applicable).

• Connect and test all electrical systems including brake lights, turn signals, reverse lights, and marker lights.

• Ensure the bed sits level, securely fastened, and free of vibration or interference with vehicle components.



D. Quality Check and Testing

• Perform full inspection confirming structural security, proper alignment, and correct electrical function.

• Test vehicle lighting and safety systems to ensure compliance with DOT requirements.

• Verify proper clearance between bed, tires, frame, and suspension components.



3. Deliverables

• Completed removal of OEM bed

• Fully installed CM Truck Bed (Model 8'6/84/54/42)

• Documentation of all work performed

4. Schedule

• Work to begin on: 8/1/26

• Estimated completion: 8-12 weeks



5. Acceptance Criteria

The installation will be considered complete when:

• CM bed is mounted to manufacturer specifications

• All electrical and safety systems function correctly

• No fault codes or warning indicators are present

• Vehicle passes final inspection by the government/agency representative



6. Additional Requirements

• Contractor must follow all safety protocols and industry standards.

• Any changes, unexpected issues, or additional parts required must be approved before proceeding.


Attachments/Links
Contact Information
Contracting Office Address
  • 1720 Peachtree ST NW STE 876S
  • Atlanta , GA 303092449
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • Jul 09, 2026 01:50 pm EDTCombined Synopsis/Solicitation (Original)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Posted Docs Due Date Status July 2, 2026 27-001 Purchase and Installation of ...

Muscogee County School District (MCSD)

Bid Due: 8/04/2026

...Posted Docs Due Date Status July 2, 2026 27-001 Purchase and Installation of ...

Muscogee County School District (MCSD)

Bid Due: 8/04/2026

...of Work. NIGP Codes Code Description 99050 Installation of Security and Alarm Equipment ...

State Government of Georgia

Bid Due: 8/04/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.