| Location: | Ohio |
|---|---|
| Posted: | Dec 9, 2024 |
| Due: | Dec 18, 2024 |
| Agency: | State Government of Ohio |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | SRC0000026592 |
| Publication URL: | To access bid details, please log in. |
| Solicitation ID: | SRC0000026592 |
| Solicitation Name: | PWC SW L John Bryan HVAC Park Office |
| Original Begin Date: | 12/6/2024 1:44:01 PM |
| Begin Date: | 12/9/2024 12:00:00 AM |
| End Date: | 12/18/2024 2:00:00 PM |
| Inquiry End Date: | 12/11/2024 2:00:00 PM |
| Commodity: | HVAC heating system construction service |
| MBE Set Aside: | MBE Set Aside |
| Agency: | DNR353218 John Bryan State Park DNRGRE |
| Solicitation Status: | Open for Bidding |
| Solicitation Type: | Quick Quote |
|
In an MBE set-aside solicitation, only those bidders/suppliers with an active MBE certification at the time the solicitation closes can submit a response
|
|||
|
Solicitation ID
SRC0000026592
|
|||
|
Solicitation Name
PWC SW L John Bryan HVAC Park Office
|
RFx Type
Quick Quote
|
||
|
Lot #
1
|
Solicitation Status
Open for Bidding
|
||
|
Round #
2
|
MBE Set Aside
|
||
|
Begin Date
12/9/2024 12:00:00 AM (EST)
|
Amendment?
|
||
|
End Date
12/18/2024 2:00:00 PM (EST)
|
Inquiry End Date
12/11/2024 2:00:00 PM
|
||
|
Summary
Photographic Information in File Quote Specification RFQ PWC SW L John Bryan HVAC Park Office
Needed Service or Supply: Replace Furnace in Park Office Ordering Location and Address: John Bryan State Park 3790 State Route 370 Yellow Springs, Ohio, 45387 Project Background: The heat exchanger is worn out and thus the furnace needs to be replaced. The furnace is from 1997 and is outdated. The repairs would be costly and only putting off the replacement for a short time. The replacement is needed to avoid frozen pipes and to make the office comfortable for staff and park patrons. Specifications/Scope of Work: The new furnace needs to be replaced with a 60K BTU Gas Furnace, 3.5 Ton Blower, 17inch. 96% Efficient energy start certified. New furnace is required to have a manufacturer’s warranty and one year labor warranty. The furnace should work with the existing thermostat and does not need to be cover under warranty. The new furnace should be installed with 16x25x1 filter rack. Remove all necessary parts from existing gas valve and install a conversion kit for furnace equipment to be operated of liquid propane. Proper venting should be check and fixed to make sure the furnace runs the most efficient. All operations should be tested for good operation. Product specifications include items such as: Delivery : John Bryan State Park 3790 State Route 370 Yellow Springs, Ohio, 45387 Daniel.Kuebler@dnr.ohio.gov Office 937-767-1274 or Cell 937-284-3435 Completion/Delivery Date: December 31, 2024 Site Visit & Point of Contact Prior to submitting a bid response, offerors are encouraged to visit. Site can be visited Mon-Fri 8am-4:30pm or by appointment to ensure staff is available call 937-767-1274 to schedule. Once a contract is awarded, failure of the bidder to have requested a site visit to become familiar with the facility and requirements of the bid will be insufficient reason to support any request to be released from the contract. Project Award For bids involving service projects on DNR property, the lowest apparent bidder will be required to provide 2 examples of similar completed projects including photos. Provide the person’s name, organization name, phone number and email address for each project example. In addition, the bidder must complete a pre-award meeting with appropriate DNR staff to ensure that the materials and scope are mutually understood. Evaluation. The contract will be awarded to the lowest responsive and responsible bidder as determined by the State. Contract Award. The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive. |
|||
|
Process
Lowest Responsive and Responsible Bidder |
|||
|
Ship To
|
|||
1 Record(s)
|
0 Record(s)
|
6 Record(s)
|

With GovernmentContracts, you can: