| Location: | Louisiana |
|---|---|
| Posted: | Sep 23, 2026 |
| Due: | Sep 29, 2026 |
| Agency: | NOLA Public Schools |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Sheet Group | Sheet | Sheet Name or Description |
|---|---|---|
| ARCHITECTURAL | A4.0 | DOOR LOCATION PLAN |
| ARCHITECTURAL | A4.1 | FRAME & DOOR TYPES |
| ARCHITECTURAL | A3.2 | STEPS PLAN DETAILS |
ADDENDUM NO. 2
ITB 25FAC0017 - Building Improvements @ Dwight D. Eisenhower School
3700 Tall Pines Drive
New Orleans, LA 70131
Architect's Project No. M25001
For Owner: Orleans Parish School Board
Architect: Modus Inc. Architects and Planners
2300 Marengo Street
New Orleans, LA. 70115
TO: All PLAN HOLDERS
Date Issued: September 21, 2026
This addendum modifies the original Solicitation Documents for the Project
dated June 15, 2026 (Specifications/Drawings). The items in this addendum shall
govern the work, taking precedence over previously issued drawings governing the
items mentioned.
Acknowledge receipt of this Addendum in the space provided on the Sealed Bid
Form.
A. CHANGES TO AND CLARIFICATIONS OF DRAWINGS:
The following drawings are revised for the project identified as ITB 25FAC0017 -
Building Improvements @ Dwight D. Eisenhower School, 3700 Tall Pines Drive, New
Orleans, LA 70131:
Sheet Group Sheet Sheet Name or Description
ARCHITECTURAL A4.0 DOOR LOCATION PLAN
ARCHITECTURAL A4.1 FRAME & DOOR TYPES
ARCHITECTURAL A3.2 STEPS PLAN DETAILS
The attached PostBid Document Checklist and applicable postbid forms were
previously distributed at the September 3, 2026 PreBid Conference and are
Page 2 of 2
September 21, 2026
Addendum No. 2
included with this Addendum for reference. The bidopening date was subsequently
revised by Addendum No. 1
Bidders Questions are numbered and in black. The Answers are in red.:
1. Question: What is the budget for this project?
Answer: The construction estimate is $440,000.00.
2. Question: Will this project be completed during the 2026 school year?
Answer: Completion during the 2026 school year remains an
estimate/projection. The decision will be made by the OPSB.
Construction may commence when the NTP has been issued for the
selected bidder. Currently page 6 of the Project Manual establishes the
Completion Time as One Hundred Twenty (120) consecutive calendar
days from the Notice to Proceed. This addendum shall revise the
completion time to (6) six months after Notice to Proceed.
3. Question: Should we exclude any mechanical and/or electrical work
that may be required as a result of the door replacements?
Answer: At this time there is no anticipated mechanical work required
for the completion of the project scope. Yes security systems shall be
adjusted. There is electrical wiring required for the security door, when
the Security Guards at the school buzz visitors in the door from their
desk. This wiring may need to be adjusted.
4. Question: Can you confirm the total length of railing to be installed?
Answer: We did a quick tally, but these numbers are not to be used in
lieu of the bidder's own tally of what we show in the construction
documents. 36" handrailing: 169'0", 42" guard railing:160'4.1/2".
5. Question: Is an Electronic bid submittal permitted?
Answer: No. Electronic bid submissions are not permitted. Pursuant to
Article 5, Section 5.3.4 of the Instructions to Bidders, oral, electronic,
telephonic, or telegraphic bids are invalid and shall not receive
consideration.
END OF ADDENDUM NO. 2
| 1 | ||||||||||||||||||||||
| 1" " 4 / | NO | 1 SI | 3 | /4" NG | 4" | EQ3 | ||||||||||||||||
| " 2 1 | E | Q | ||||||||||||||||||||
| Q | 3 | / | 8" | |||||||||||||||||||
| 3'- | 0 | " | ||||||||||||||||||||
| 3 | ||||||||||||||||||||||
| " 4 | 3 | |||||||||||||||||||||
| 4" | 4" 4 " | 3'-0 | " | 3'-6" | ||||||||||||||||||||||
| 4 " | ||||||||||||||||||||||||||
| " 2 1 | ||
|---|---|---|
| Q3/ |
4'-5" 3'-5"
1
7'-5 "
16
4'-5" 3'-5"
SRESIR
LAUQE
4
LEGEND
CONCRETE + CROSS HATCHED AREAS
FACE OF BUILDING
INDICATE EXISTING SIDE WALK &
FACE OF BUILDING STAIR REMOVAL AND REPLACEMENT
RAIL & STANDARD
6'
REMOVE EXIST RAMP & BOLLARDS
IN PREPARATION FOR NEW RAMP
CONSTRUCTION
NOTE
9'-5"
FOR THE DIMENSIONS OF NEW
RAILINGS,BALUSTERS AND
STANDARDS, SEE 3/3.2
7'
4'-1"
22'-1"
NOTE
EXIST PLAN VIEW OF RAMP @ KITCHEN NEW STAIRS AND SIDEWALKS AT PLAY GROUND
1 NEW GUARD RAILS & HAND 2
A-3.2 SCALE:3/8"=1'-0" RAILS TO WITHSTAND 200 MPH A3.2 SCALE:1/2"=1'-0"
WINDS VERTICALLY AND
HORIZONTALLY PER I.B.C. FFUULLLL H HTT S STTAANNDDAARRDDSS
NEW GUARD RAIL
INTERRMITTANT STANDARDS 12"
SHALL BE RECESSED AND
NEW HANDRAIL
ANCHORED BELOW THE
SURFACES OF THE NEW STEPS, " 2
/
1
THE EXIST SIDEWALK AND THE
1
FULL HT STANDARDS
NEW RAMP
1
1 "
/ "
2 NEW HANDRAIL 2 2
" 1 1 /
3/4"4" 1
3'-6"
EQ3/8"EQ
EXIST COL
1 1" NOSING 12"
1
/
2 "
3'-0"
3/4"4" 12"
EXIST. CONC. SIDEWALK "
3'-6" / 4 TREAD
3 "
3'-0" " 3" " 2
4" 4 3 / 4 1
"
4
EQ3/8"EQ
MIN 3" DIA
4"
COVERAGE BTW
3'-0"
4" 3"
4 NEW CONC. RAMP FULL HT STANDARDS
"
& NOSING
NEW STAIRS 1
4 2
" 4
" 3
12" 4
5
NEW HANDRAILING STANDARD
SEE CIVIL DRAWINGS STEPS PLAN DETAILS
FOR MORE INFORMATION
REGARDING STAIR & RAILING CONSTRUCTION
PART ELEV DTL @ STAIR & RAMP @ ENTRY STEPS AT PLAY GROUND A-3.2
3 4
A-3.2 SCALE:1"=1'-0" A-3.2 SCALE:1/2"=1'-0"
TSEV
TSIXE/SRIATS
WEN
ELUBITSEV
TSIXE/SRIATS
WEN
NEW 3' X 7' METAL
DOORS, KEYING
PER OWNER.
REMOVE EXIST
REMOVALS AS INDICATED
MASONRY WALL
AS REQUIRED
REMOVE EXIST DOORS
INFILL : BRICK MASONRY TO MATCH
EXIST ADJ, SHEATHING, NEW WOOD
FRAMING, INSULATION, GYP BD.
5
| 2 RM 150 01 156 02 66 153 154 160 150 RM 150.1 100 152 164 7 RM 100 159 13 155 7 RM 101 161 151 12 142 143 CAFETERIA 144 101 141 165 145 1 Entry 2 03 1 ENTRY 1 11 137 04 55 2RM 162 RRMM 114488 136 140 2 10 Stair 1 05 135 130 134 127 126 125 132 124 129 128 131 166 102 09 14 108 4 4 CRT 1 5 COURTYARD PAVED PLAYGROUND 103 109 104 107 113 110 105 106 112 111 122 114 MARK 06 3 YARD RM 114 01 2RM 120 02 2 RM 115 03 04 07 08 05 121 115 120 06 118 07 116 08 119 118.A 09 10 117 11 12 | ||||||
|---|---|---|---|---|---|---|
| MARK | SIZE | DESCRIPTION | DOOR TYPE | FRAME TYPE | ||
| 01 | 3-0x7-0x1 3/4 | NEW HM DOOR & FRAME | I | I | ||
| 02 | 5-0x7-0x1 3/4 | NEW HM FRAME & DOORS | D | D | ||
| 03 | 5-0x7-0x1 3/4 | NEW HM DOOR & FRAME | D | D | ||
| 04 05 | 5-8x7-0x1 3/4 3-6x7-0x1 3/4 | NEW HM FRAME & DOORS NEW HM DOOR & FRAME | A H | A H | ||
| 06 07 | 3-0x7-0x1 3/4 2-8x7-0x1 3/4 | NEW HM DOOR & FRAME NEW HM DOOR & FRAME | F I | F I | ||
| 08 | 4-6x7-0x1 3/4 | NEW HM DOORS & FRAME | B | B | ||
| 09 | 3-0x7-0x1 3/4 | NEW HM DOOR & FRAME | G | G | ||
| 10 | 3-0x7-0x1 3/4 | NEW HM DOOR & FRAME | C | C | ||
| 11 | 5-8x7-0x1 3/4 | NEW HM FRAME & DOORS | A | A | ||
| 12 | 3-0x7-0x1 3/4 | NEW HM FRAME & DOOR | J | E | ||
| 13 | 3-0x7-0x1 3/4 | NEW HM FRAME & DOOR | E | E | ||
| 14 | 3-0x7-0x1 3/4 | NEW HM DOOR & FRAME | G | G |
2
RM 150
156
66 153 154
160 150 RM 150.1
100 152
164
7 RM 100
159
155
7 RM 101
161
101
141 165
1 Entry 2
1
ENTRY 1
55
2RM 162
RRMM 114488
2
Stair 1
4 4
CRT 1
3
RM 114
2RM 120
2
RM 115
A-4.0
151
1
142 143
144
145
137
136
140
135
130
134
127
126
125 132
124 129 128 131 166
102 108
COURTYARD
103 109
104
107 113 110
105 106 112 111
122 114
121 115
120
118
116
119 118.A
117
DOOR LOCATION
PLAN
FIRST FL. DOORS AND ROOMS LOCATION KEY
1
A-4.0
SCALE: 3/64"=1'-0"
_
NEW STOREFRONT SYSTEM FRAME, DOORS AND HARDWARE.
2
_
NEW HM DOOR
(
S
)
AND FRAME
(
S
)
.
3
_
NEW HM FRAME ONLY.
4
_
NEW HM STOREFRONT STYLE DOOR/MATCH EXISTING.
5
_
NEW HM DOOR AND FRAME
(
LOUVERED AS REQUIRED PER CODE
)
6 _ NEW HM FRAME AND HM DOORS, LOUVER NOT REQD.
7
_
DOORS/FRAMES NARATIVE DESCRIPTION
01
02
NEW HM DOOR AND FRAME.
REPLACE ALL EXTERIOR DOOR CORES SO THEY MATCH OR MATCH EXISTING
KEYWAY. COORDINATE WITH THE OWNERS REGARDING PREFERRED KEYING.
13
12
CAFETERIA
03
11 04
10
05
09 14
5
PAVED PLAYGROUND
NOTE
THE BUILDING DEPICTED IN THIS PLAN
IS THE SCHOOL BLDG. SEE EXISTING
AND PROPOSED SITE PLANS FOR CONTEXT.
DOOR SCHEDULE
MARK SIZE DESCRIPTION DOOR TYPE FRAME TYPE REMARKS
06
YARD
01 3-0x7-0x1 3/4 NEW HM DOOR & FRAME I I TRANSOM PANEL
02 5-0x7-0x1 3/4 NEW HM FRAME & DOORS D D TRANSOM PANELS TO REMAIN
03 5-0x7-0x1 3/4 NEW HM DOOR & FRAME D D TRANSOM PANELS, LOWER DOOR
07 04 5-8x7-0x1 3/4 NEW HM FRAME & DOORS A A
08
05 3-6x7-0x1 3/4 NEW HM DOOR & FRAME H H
06 3-0x7-0x1 3/4 NEW HM DOOR & FRAME F F FURRING REQU'D ON RIGHT HAND SIDE
07 2-8x7-0x1 3/4 NEW HM DOOR & FRAME I I
08 4-6x7-0x1 3/4 NEW HM DOORS & FRAME B B
09 3-0x7-0x1 3/4 NEW HM DOOR & FRAME G G 1
2
10 3-0x7-0x1 3/4 NEW HM DOOR & FRAME C C
3
11 5-8x7-0x1 3/4 NEW HM FRAME & DOORS A A 4
12 3-0x7-0x1 3/4 NEW HM FRAME & DOOR J E GLAZED TRANSOM 5
13 3-0x7-0x1 3/4 NEW HM FRAME & DOOR E E GLAZED TRANSOM
14 3-0x7-0x1 3/4 NEW HM DOOR & FRAME G G
5
| DOOR SCHEDULE LOCATION FRAME TYPE DOOR TYPE NOTES DETAIL LOCATION | ||||
|---|---|---|---|---|
| DOOR SCHEDULE LOCATION FRAME TYPE DOOR TYPE NOTES DETAIL LOCATION | ||||
| LOCATION | FRAME TYPE | NOTES | ||
| ENTRY DOOR1 | A | A | 1 | A-5.0 |
| ENTRY DOOR2 | A | A | 1 | A-5.0 |
| ROOM 120 | B | B | 2 | A-5.0 |
| ROOM 162 | C | C | 2 | A-5.0 |
| ROOM 150.1 | D | D | 6 | A-5.0, TRANSOM PANELS TO REMAIN |
| ROOM 148 | D | D | 5 | A-5.0 5 |
| ROOM 100 | E | E | 7 | A-5.0 |
| ROOM 114 | F | F | 2 | A-5.0 |
| CRT 1 | G | G | 4 | A-5.0 |
| STAIR1 | H | H | 2 | A-5.0 |
| ROOM 150 | I | I | 2 | A-5.0 |
| ROOM 115 | I | I | 2 | A-5.0 |
| ROOM 101 | E | J | 7 | A-5.0 |
| 2' 2'-5" |
|---|
| 2' |
|---|
| CAFETERIA | |
|---|---|
5'-4"
3'-4"
12' 5'-4"
2'
2'-5"
3'-8"
9'-4" 9'-3"
5'
9'-4" 9'-4"
1
7'-0" 6'-11" 6'-11"
1 2
7' 6'-11"
4
4'
3'
A B C D E
1 2'
4' 2'-11" 4'
2
1 1 1 7'-1" 3'-6" 7'
2 2 9'-4"
1
5 6'-11" 7'-2" 3'
3" 8
8
3'-4"
F G H I
2
RM 150
66
RM 150.1
7 RM 100
7 RM 101
6' 5' 5' 3' 1 Entry 2
1
ENTRY 1
55
2RM 162
RRMM 114488
2
Stair 1
1 1
7' 6'-11" 6'-11" 1 6'-10"
4 6'-11" 2
2
3'-8" 4 4
CRT 1
A B C D E
1 3'
2'-11" 3'-8" 3' 3'-8" 2
1 1 1
7' 6'-11" 7'-0" 7' 6'-10"
8 2 2
3
RM 114
2RM 120
2
RM 115
F G H I J
A-4.1
_ NEW STOREFRONT SYSTEM FRAME, DOORS AND HARDWARE.
2 _ NEW HM DOOR ( S ) AND FRAME ( S ) .
3
_
NEW HM FRAME ONLY.
4
_
NEW HM STOREFRONT STYLE DOOR/MATCH EXISTING.
5
_
NEW HM DOOR AND FRAME
(
LOUVERED AS REQUIRED PER CODE
)
6
_
NEW HM FRAME AND SOLID HM DOORS, LOUVER NOT REQD.
7
_
DOOR SCHEDULE
LOCATION FRAME TYPE DOOR TYPE NOTES DETAIL LOCATION
ENTRY DOOR1 A A 1 A-5.0
ENTRY DOOR2 A A 1 A-5.0
ROOM 120 B B 2 A-5.0
SIM
ROOM 162 C C 2 A-5.0
SIM
SIM
ROOM 150.1 D D 6 A-5.0, TRANSOM PANELS TO REMAIN
ROOM 148 D D 5 A-5.0
5
ROOM 100 E E 7 A-5.0
ROOM 114 F F 2 A-5.0
SIM SIM SIM CRT 1 G G 4 A-5.0
STAIR1 H H 2 A-5.0
ROOM 150 I I 2 A-5.0
ROOM 115 I I 2 A-5.0
ROOM 101 E J 7 A-5.0
SIM
NEW HM DOOR AND FRAME.
REPLACE ALL EXTERIOR DOOR CORES SO THEY MATCH OR MATCH EXISTING
KEYWAY. COORDINATE WITH THE OWNERS REGARDING PREFERRED KEYING.
SIM SIM SIM SIM
FRAME TYPES
1
A-4.1 SCALE:1/4"=1'-0"
CAFETERIA
5
COURTYARD PAVED PLAYGROUND
NOTE
THE BUILDING DEPICTED IN THIS PLAN
IS THE SCHOOL BLDG. SEE EXISTING
AND PROPOSED SITE PLANS FOR CONTEXT.
1
2
3
YARD 4
5
FRAME & DOOR
TYPES
DOOR TYPES FIRST FL. DOORS/FRAMES LOCATION KEY
2 3
A-4.1 A-4.1 SCALE:1/32"=1'-0"
SCALE:1/4"=1'-0"
NOLA Public Schools
Post-Bid Document Checklist
Project Information
Project: ITB No. 25-FAC-0017 - Building Improvements @ Dwight D. Eisenhower School
Bid Opening Date: Thursday, September 17, 2026 @ 2:00 PM CDT
Pre-Bid Conference Date: Thursday, September 3, 2026, 10:00 AM CDT, at Dwight D.
Eisenhower School located at 3700 Tall Pines Drive, New Orleans, LA 70131
All documents are due within 10 calendar days after Notice of Intent to Award.
Submission Rules
* Post-Bid Documents cannot be emailed.
* Hand delivery, U.S. Mail, or Express Mail only.
* NOLA-PS is not responsible for delivery delays or lost mail; late submissions will be
deemed non-responsive.
Required Post-Bid Documents
Non-Collusion Affidavit
Attestation Clause
DBE Responsiveness Form 1
DBE Responsiveness Form 2
DBE Certification Checklist (Notarized)
Verification of DBE Certification (Provide a completed Verification of DBE Certification
Form for any DBE firms being claimed.)
EDGAR Form
Delivery Address (Hand Delivery or Mail)
Mr. Jonathan Temple
Office of Business Partnerships
NOLA Public Schools
2401 Westbend Parkway, Suite 5055
New Orleans, LA 70114

With GovernmentContracts, you can:
Follow Port Fourchon Navigation Channel, Maintenance Dredging FY26, Lafourche Parish, LA Active Contract
DEPT OF DEFENSE
Bid Due: 4/07/2028
Follow Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No.
DEPT OF DEFENSE
Bid Due: 4/30/2028
Follow Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No.
DEPT OF DEFENSE
Bid Due: 4/30/2028
Follow Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No.
DEPT OF DEFENSE
Bid Due: 4/30/2028