St. Charles County, St. Charles County Regional Airport, Installation and Removal of Silt Fence, Erosion Control Blanket, Mobilization, etc.

Location: Missouri
Posted: Apr 23, 2026
Due: May 21, 2026
Agency: Missouri Department of Transportation(MDOT)
Type of Government: State & Local
Category:
  • 58 - Communications, Detection and Coherent Radiation Equipment
  • J - Maintenance, Repair, and Rebuilding of Equipment
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.
Status Bid Advertisement Post Date Revision Date Letting Date
NEW St. Charles County, St. Charles County Regional Airport, Installation and Removal of Silt Fence, Erosion Control Blanket, Mobilization, etc. 4/23/26 5/21/26

Attachment Preview

St. Charles County Regional Airport
Airport Flooding Resiliency Improvements
St. Charles County IFB 26-074
MoDOT Project No. 25-111A-1
NOTICE TO BIDDERS
ST. CHARLES COUNTY, MO
ST. CHARLES COUNTY REGIONAL AIRPORT – SMARTT FIELD
St. Charles County IFB 26-074
MoDOT Project No. 25-111A-1
Sealed bids will be received until 2:00 PM Prevailing Central Time, May 21, 2026 and then publicly opened and
read at the St. Charles County Finance Department, 201 North Second Street, Room 116, St. Charles, MO 63301for
furnishing all labor, materials and equipment and performing all work necessary for Airport Flooding Resiliency
Improvements.
Copies of the bid documents, including project drawings and technical specifications, are on file and may be inspected
at:
St. Charles County Website, https://www.sccmo.org/Bids.aspx
The Builders’ Association, 3632 W. Truman Blvd., Jefferson City, MO 65109
ConstructConnect, 3825 Edwards Rd., Suite 800, Cincinnati, OH 45209, www.ConstructConnect.com
ePlan Online Plan Room, 1400 Forum Blvd, Suite 7B, Columbia, MO 65203, www.eplanbidding.com
Crawford, Murphy & Tilly, Inc.; One Memorial Drive, Suite 500; St. Louis, MO 63102
A complete set of bid documents may be downloaded free of charge from the St. Charles County website at
https://www.sccmo.org/Bids.aspx. No official printed set of bidding documents will be provided. All potential bidders,
both prime and sub, shall provide company contact information to bcraig@cmtengr.com for inclusion on the plan
holder list and shall check the website for any addenda. Questions regarding bids shall be directed in writing to Kurt
Mandernach, Purchasing Manager, St. Charles County Government by e-mail at kmandernach@sccmo.org. The last
day to submit questions shall be May 18, 2026 at 5:00 PM.
A recommended pre-bid conference for this project will be held at 2:00 PM Prevailing Central Time, May 14,
2026 at St. Charles County Regional Airport Terminal Building, 6390 Grafton Ferry Road, Portage Des Sioux, MO
63373. A site walkthrough will immediately follow this meeting for those interested.
Contract Work Items. This project will involve the following work items and estimated quantities. Prospective
bidders are hereby advised that the quantities indicated herein are approximate and are subject to change.
BASE BID
No.
ITEM #
DESCRIPTION
1
C-102-5.1 Installation and Removal of Silt Fence
2
C-102-5.2 Installation and Removal of Inlet Protection
3
C-102-5.3 Erosion Control Blanket
4
C-105-6.1 Mobilization (10% Limit)
5
P-101-5.1 Full-Depth Pavement Removal
6
P-152-4.1 Embankment In Place
7 SCC 304-6.1 Type 5 Aggregate Base Course
8 SCC 401-14.1 BP-1 Asphaltic Concrete
9 SCC 407-6.1 Tack Coat
10 SCC 408-6.1 Prime Coat
11
P-620-5.1 Roadway Runway Markings, With Reflective Media
12
D-701-5.2 18” RCP
13
D-701-5.3 24” RCP
14
D-701-5.4 30” RCP
15
D-701-5.6 36” RCP
UNIT
LF
EA
SY
LS
SY
CY
TON
TON
GAL
GAL
SF
LF
LF
LF
LF
QUANTITY
3,000
10
4,300
1
960
316
700
350
120
400
100
500
930
1,050
1,750
iii
24007138.00
St. Charles County Regional Airport
Airport Flooding Resiliency Improvements
St. Charles County IFB 26-074
MoDOT Project No. 25-111A-1
16
D-701-5.7 42” RCP
LF
17
D-701-5.8 42” RCP FES
EA
18
D-701-5.9 3’ x 5’ Box Culvert
LF
19 D-701-5.10 3’ x 5Double Box Culvert Flared Wing Wall End Section EA
20
D-701-5.11 3’ x 5Triple Box Culvert Flared Wing Wall End Section
EA
21 D-701-5.14 Cast-In-Place Pipe Collar End Wall
EA
22 D-701-5.15 Remove Pipe
LF
23
D-751-5.1 3’ x 4’ Inlet
EA
24
D-751-5.2 4’ x 5’ Inlet
EA
25
D-751-5.3 Remove Inlet
EA
26 SCC 609-60.5.1 Concrete Ditch Liner
SY
27
T-901-5.1 Airport Seeding
AC
28
T-908-5.1 Hydraulically Applied Mulching
AC
29
SP-2-5.1
Traffic Control Base Bid
LS
770
1
378
2
6
1
620
6
4
3
1,470
4.5
4.5
1
ADDITIVE ALTERNATE NO. 1
No.
ITEM #
DESCRIPTION
1A
P-101-5.1 Full-Depth Pavement Removal
2A SCC 304-6.1 Type 5 Aggregate Base Course
3A SCC 401-14.1 BP-1 Asphaltic Concrete
4A SCC 407-6.1 Tack Coat
5A SCC 408-6.1 Prime Coat
6A
P-620-5.1 Roadway Markings, with Reflective Media
7A D-701-5.11 6’ x 6’ Box Culvert
8A D-701-5.12 6’ x 6’ Double Box Culvert Flared Wing Wall End Section
9A D-701-5.13 Remove Pipe
10A
SP-2-5.2
Traffic Control – Additive Alternate No. 1
UNIT
SY
TON
TON
GAL
GAL
SF
LF
EA
LF
LS
QUANTITY
100
40
35
15
40
10
72
2
72
1
ADDITIVE ALTERNATE NO. 2
No.
ITEM #
DESCRIPTION
1B
P-101-5.1 Full-Depth Pavement Removal
2B SCC 304-6.1 Type 5 Aggregate Base Course
3B SCC 401-14.1 BP-1 Asphaltic Concrete
4B SCC 407-6.1 Tack Coat
5B SCC 408-6.1 Prime Coat
6B
P-620-5.1 Roadway Markings, with Reflective Media
7B
D-701-5.1 15” RCP
8B
D-701-5.5 30” DIP
9B
D-751-5.4 Storm Sewer Junction Box
10B
SP-1-5.1
Eccentric Plug Valve with Post Indicator
11B
SP-2-5.3
Traffic Control – Additive Alternate No. 2
UNIT
SY
TON
TON
GAL
GAL
SF
LF
LF
EA
EA
LS
QUANTITY
70
15
25
10
30
25
200
11
1
1
1
iv
24007138.00
St. Charles County Regional Airport
Airport Flooding Resiliency Improvements
St. Charles County IFB 26-074
MoDOT Project No. 25-111A-1
Contract Time. The owner has established a contract performance time of eight-three (83) calendar days from the
commencement date specified in the Notice to Proceed for the Base Bid, ninety-seven (97) calendar days from the
commencement date specified in the Notice to Proceed for the Base Bid with Additive Alternate No. 1, eighty-six
(86) calendar days from the commencement date specified in the Notice to Proceed for the Base Bid with Additive
Alternate No. 2, and one hundred (100) calendar days from the commencement date specified in the Notice to
Proceed for the Base Bid with Additive Alternate No. 1 and Additive Alternate No. 2. All project work shall be
substantially completed within the stated timeframe. This project is subject to liquidated damages as prescribed in the
project manual. The time between the Notice of Award and the Notice to Proceed will be used for contract execution,
submittal review and procurement of materials.
Bid Security. No bid will be considered unless accompanied by a certified check or cashier’s check on any bank or
trust company insured by the Federal Deposit Insurance Corporation, payable to St. Charles County, MO for not less
than five (5) percent of the total amount of the bid, or by a bid bond secured by an approved surety or sureties, payable
to the owner, for not less than five (5) percent of the total amount of the bid.
Bonding Requirements. The successful bidder will be required to furnish separate performance and payment bonds
each in an amount equal to 100% of the contract price at the time of contract execution.
Award of Contract. All proposals submitted in accordance with the instructions presented herein will be subject to
evaluation. Bids may be held by St. Charles County, MO for a period not to exceed one hundred twenty (120) days
from the date of the bid opening for the purpose of conducting the bid evaluation.
Award of contract will be based on the lowest aggregate sum proposal submitted from those bidders that are confirmed
as being responsive and responsible. The right is reserved, as St. Charles County, MO may require, to reject any bid
and all bids.
Award of contract is contingent upon the owner receiving Federal-funding assistance under the State Block Grant
Program.
Federal Provisions. This project is subject to the following Federal provisions, statutes and regulations:
Equal Employment Opportunity - Executive Order 11246 and 41 CFR Part 60: The Bidder’s attention is called
to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Opportunity Construction Contract
Specifications" set forth within the supplementary provisions. The successful Bidder shall not discriminate against
any employee or applicant for employment because of race, color, religion, sex, or national origin. The Contractor
will take affirmative action to ensure that applicants are employed, and that employees are treated during employment
without regard to their race, color, religion, sex, or national origin.
Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity:
1. The Bidder’s attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment
Opportunity Construction Contract Specifications" set forth within the supplementary provisions.
2. The goals and timetables for minority and female participation, expressed in percentage terms for the contractor's
aggregate workforce in each trade on all construction work in the covered area, are as follows:
Timetables
Goals for minority participation for each trade:
Goals for female participation in each trade:
14.7%.
6.9%.
These goals are applicable to all of the contractor's construction work (whether or not it is Federal or federally-assisted)
performed in the covered area. If the contractor performs construction work in a geographical area located outside of
the covered area, it shall apply the goals established for such geographical area where the work is actually performed.
With regard to this second area, the contractor is also subject to the goals for both its federally involved and non-
federally involved construction.
v
24007138.00
St. Charles County Regional Airport
Airport Flooding Resiliency Improvements
St. Charles County IFB 26-074
MoDOT Project No. 25-111A-1
The contractor’s compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be based on its
implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications
set forth in 41 CFR 60-4.3(a), and its efforts to meet the goals. The hours of minority and female employment and
training must be substantially uniform throughout the length of the contract, and in each trade, and the contractor shall
make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or
female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting
the Contractor’s goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60-
4. Compliance with the goals will be measured against the total work hours performed.
3. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance
Programs (OFCCP) within 10 working days of award of any construction subcontract in excess of $10,000 at any tier
for construction work under the contract resulting from this solicitation. The notification shall list the name, address,
and telephone number of the subcontractor; employer identification number of the subcontractor; estimated dollar
amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in
which the subcontract is to be performed.
4. As used in this notice and in the contract resulting from this solicitation, the "covered area" is City of Portage Des
Sioux, St. Charles County, State of Missouri.
Certification of Nonsegregated Facilities – 41 CFR Part 60: A certification of Nonsegregated Facilities must be
submitted prior to the award of a federally-assisted construction contract exceeding $10,000 which is not exempt from
the provisions of the Equal Opportunity Clause.
Contractors receiving federally assisted construction contract awards exceeding $10,000 which are not exempt from
the provisions of the Equal Opportunity Clause will be required to provide for the forwarding of the notice to
prospective subcontractors for supplies and construction contracts where the subcontracts exceed $10,000 and are not
exempt from the provisions of the Equal Opportunity Clause. The penalty for making false statements in offers is
prescribed in 18 U.S.C. 1001.
Disadvantaged Business Enterprise – 49 CFR Part 26: The requirements of 49 CFR Part 26, Regulations of the
U.S. Department of Transportation, apply to this contract. It is the policy of MoDOT and St. Charles County to
practice nondiscrimination based on race, color, sex or national origin in the award or performance of this contract.
All firms qualifying under this solicitation are encouraged to submit bids/proposals regardless of their business size
or ownership. Awards of this contract will be conditioned upon satisfying the requirements of this section. These
requirements apply to all bidders, including those who qualify as a DBE. The owner’s award of this contract is
condition upon the bidder satisfying the good faith effort requirements of 49 CFR §26.53. A DBE contract goal of six
percent (6%) has been established for this contract. The non-DBE bidder shall subcontract zero percent (0%) of the
dollar value of the base bid(s), excluding any additive alternates, to disadvantaged business enterprises (DBE) or make
good faith efforts to meet the DBE contract goal. The bidder and any subcontractor who qualifies as a DBE who
subcontracts work to another non-DBE firm must subtract the amount of the non-DBE contract from the total DBE
work counted toward the goal, as defined in 49 CFR Part 26.55.
The apparent successful competitor will be required to submit the following information as a condition of bid
responsiveness: (1) the names and addresses of DBE firms that will participate in the contract; (2) a description of the
work that each DBE firm will perform; (3) the dollar amount of the participation of each DBE firm participating; (4)
written statement from bidder that attests their commitment to use the DBE firm(s) listed under (1) above to meet the
owner’s project goal; and (5) if the contract goal is not met, evidence of good faith efforts undertaken by the bidder,
as described in Appendix A to 49 CFR Part 26.
The apparent successful competitor must provide written confirmation of participation from each of the DBE firms
listed in their commitment with the proposal documents as a condition of bid responsiveness.
vi
24007138.00
St. Charles County Regional Airport
Airport Flooding Resiliency Improvements
St. Charles County IFB 26-074
MoDOT Project No. 25-111A-1
Davis-Bacon Act, as amended – 29 CFR Part 5: The Contractor is required to comply with wage and labor
provisions and to pay minimum wages in accordance with the current schedule of wage rates established by the United
States Department of Labor included in the supplementary provisions.
In addition, the contractor will also be required to comply with the wage and labor requirements and pay minimum
wages in accordance with the schedule of wage rates established by the Missouri Division of Labor Standards included
in the Supplementary Provisions.
The highest rate between the two (Federal and State) for each job classification shall be considered the prevailing
wage.
Debarment, Suspension, Ineligibility and Voluntary Exclusion – 49 CFR Part 29: The bidder certifies, by
submission of a proposal or acceptance of a contract, that neither it nor its principals are presently debarred, suspended,
proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any
Federal department or agency. Furthermore, the Bidder or Offeror shall sign the Certification Regarding Debarment and
Suspension form and submit with the bid proposal.
Foreign Trade Restriction – 49 CFR Part 30: The Bidder and Bidder’s subcontractors, by submission of an offer
and/or execution of a contract, is required to certify that it:
a. is not owned or controlled by one or more citizens of a foreign country included in the list of countries that
discriminate against U.S. firms published by the Office of the United States Trade Representative (USTR);
b. has not knowingly entered into any contract or subcontract for this project with a person that is a citizen or
national of a foreign country on said list, or is owned or controlled directly or indirectly by one or more citizens
or nationals of a foreign country on said list; or
c. has not procured any product nor subcontracted for the supply of any product for use on the project that is
produced in a foreign country on said list.
Buy American Certificate – Aviation Safety and Capacity Act of 1990: This contract is subject to the “Buy
American Preferences” of the Aviation Safety and Capacity Act of 1990. Prospective Bidders are required to certify
that steel and manufactured products have been produced in the United States and to clearly identify those items
produced or manufactured outside of the United States.
Additional Provisions:
Modification to the project documents may only be made by written addendum by the Owner or Owner’s authorized
Representative.
Proposal Forms:
The proposal must be made on the forms provided within the project manual. Bidders must supply all required
information prior to the time of the bid opening.
vii
24007138.00
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.