Sources Sought YOSE Water & Sewer piping
| Location: |
Federal |
| Posted: |
May 21, 2026 |
| Due: |
Jun 1, 2026 |
| Agency: |
INTERIOR, DEPARTMENT OF THE |
| Type of Government: |
Federal |
| Category: |
- Y - Construction of Structures and Facilities
|
| Solicitation No: |
140P2026R0083 |
| Publication URL: |
To access bid details, please log in. |
Y--Sources Sought YOSE Water & Sewer piping
Active
Contract Opportunity
Department/Ind. Agency
INTERIOR, DEPARTMENT OF THE
Sub-tier
NATIONAL PARK SERVICE
Office
DSC CONTRACTING SERVICES DIVISION
General Information
-
Contract Opportunity Type: Special Notice (Original)
-
Original Published Date: May 21, 2026 01:13 pm MDT
-
Original Response Date: Jun 01, 2026 03:00 pm MDT
-
Inactive Policy: 15 days after response date
-
Original Inactive Date:
Jun 16, 2026
-
Initiative:
Classification
-
Original Set Aside:
-
Product Service Code: Y1ND - CONSTRUCTION OF SEWAGE AND WASTE FACILITIES
-
NAICS Code:
-
237110 - Water and Sewer Line and Related Structures Construction
-
Place of Performance:
Description
Hodgdon Meadow Water Distribution System (PMIS 228661) Extend Hodgdon Meadow Campground Sewer (PMIS 196755)This project is located in Yosemite National Park, CA in the vicinity of the Big Oak Flat Entrance (Information) Station and Hodgdon Meadow Campground following along Tuolumne Grove Road and is to replace the existing water source, supply, and distribution system. The scope of the construction contract includes construction of 1,200 LF raw water line, 7,900 LF water supply, and 8,100 LF water distribution system and related appurtenances serving the Big Oak Flat Welcome Center, Hodgdon Meadow Campground, and staff housing areas; demolition of the existing 100,000-gallon welded steel water storage tank and construction of a new 210,000-gallon steel water storage tank and access road; construction of a new water source well and pump; construction of a new water treatment and control building; construction of 3,200 LF of electrical distribution and service; and construction of 3,800 LF of communications service. Existing asbestos cement water main will be abandoned in place.
This project is located in Yosemite National Park, CA in the vicinity of the Big Oak Flat Entrance (Information) Station and Hodgdon Meadow Campground following along Tuolumne Grove Road. The scope of the construction contract is for connection of the Big Oak Flat sanitary sewer to the Hodgdon Meadow Campground wastewater system and includes construction of approximately 3,500 LF of 6¿ sanitary sewer line, 20 sanitary sewer manholes, and 3 service laterals.
Attachments/Links
Contact Information
Contracting Office Address
-
1 Denver Federal Center, Building 50 P.O. Box 25287
-
Denver , CO 80225
-
USA
Secondary Point of Contact
History
-
May 21, 2026 01:13 pm MDTSpecial Notice (Original)
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
...construction services to replace wastewater tank at Padre Island National Seashore. Attachments/Links...
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/22/2026
...) wastewater treatment plants SAWS owns and operates, and is located at 3495 ...
San Antonio Water System
Bid Due: 7/01/2026
...will include the rehabilitation and replacement of small and large diameter water and/or ...
San Antonio Water System
Bid Due: 6/11/2026
...foundation construction, site utilities work (gas, electric, communications), water & wastewater...
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/05/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.