| Location: | Connecticut |
|---|---|
| Posted: | Jan 13, 2026 |
| Due: | Mar 20, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | BI-CTC-691 |
| Publication URL: | To access bid details, please log in. |
Abatement and demolition of existing finishes, HVAC, electrical, and plumbing fixtures in eight gang restrooms and installation of all new finishes, HVAC, electrical and plumbing fixtures for the eight gang restrooms. The restrooms are in two separate buildings, Wheaton and Snow Hall. Each building has two restrooms per floor, (2 floors) totaling 4 restrooms each. The layouts are identical on both floors and both buildings. The contractor shall begin the work on the second-floor restrooms in both Wheaton and Snow Halls simultaneously. This will leave the first-floor restrooms available for use by faculty and staff that work in the buildings over the summer. Once the second-floor restrooms are complete and Certificate of Occupancy is issued by OSBI, work shall commence on the first-floor restrooms.
Stephen Burke 61 Woodland Street Hartford CT, 06105 United States Tel: 8607230304 Fax: SBurke@commnet.edu

With GovernmentContracts, you can:
...ON-CALL PLUMBING SERVICES The City of Norwich, Connecticut ("City") is soliciting sealed bids ...
State Government of Connecticut
Bid Due: 9/30/2026
...Project: On-call Plumbing Services Ref. #: 27-26 Type: IFB Status: Open Open Date: ...
City of Norwich
Bid Due: 9/30/2026
...WATER METER INSTALLATIONS AT THE WILLIMANTIC CAMP MEETING ASSOCIATION WINDHAM The work consists... ...
State Government of Connecticut
Bid Due: 10/02/2026
...: 238220 - Plumbing, Heating, and Air-Conditioning Contractors Place of Performance: Danbury , ...
JUSTICE, DEPARTMENT OF
Bid Due: 10/01/2026