RE: Chilled Water Utility Upgrade
South Dakota State University
Brookings, SD 57006
OSE# R0326—24X/DEL
South Dakota State University is soliciting Statements of Interest from firms capable of
providing professional engineering design services for the project referenced above. The design
services for this project encompass full design, construction documentation, bidding, and
construction administration services. The project will include converting existing 8” to 12”
chilled water piping to be bid in the spring of 2026 with construction starting in May of 2026.
Firms interested in providing professional services for this project should send a Statement of
Interest that outlines their qualifications and experience demonstrating expertise related to this
project. Statements of Interest should include at a minimum:
Specialized expertise, capabilities, and experience in this type of work or similar facilities;
technical competence as demonstrated by the team's capabilities, and the proposed approach and
methodology. (40%)
Resources available to perform the work, including any specialized services. (30%)
Proposed project management techniques. (30%)
A technical review committee will score and select based on the criteria shown. The committee
respectfully requests that Statements of Interest be limited to twenty pages or less. This is not a
requirement, merely a request.
Copies of the Statement of Interest must be submitted by 3:00PM on February 27th, 2026. Please
submit an electronic copy or e-transfer link to the following contact:
Cory Coners
Project Manager
South Dakota State University
Phone: (605)688-4136
Email: cory.coners@sdstate.edu