| Location: | California |
|---|---|
| Posted: | Jul 24, 2025 |
| Due: | Aug 12, 2025 |
| Agency: | City of Monterey |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: 2400 BLOCK OF NORTH FREMONT STREET PAVEMENT REHABILITATION PROJECT (35C1553)
Addenda: 0
Release Date: 7/24/2025
Due Date: 8/12/2025
In general, the work consists of, but is not limited to, pavement rehabilitation by way of Full Depth Reclamation (FDR) of approximately 1,656 square yards, excess material off haul and placement of HMA, adjustments of utilities boxes, and installation of traffic markings and striping, including all necessary storm water protection and traffic control measures. The FDR work shall include, but not be limited to, Full Depth Reclamation (17-inch depth) of existing roadway, removal of existing pulverized roadway (5-inch depth), installation of new Hot Mix Asphalt (HMA) Type A (6 inch depth).

With GovernmentContracts, you can:
...grading, followed by implementation and maintenance of all Storm Water Pollution Prevention Plan... ...
Sutter County
Bid Due: 7/09/2026
...grading, followed by implementation and maintenance of all Storm Water Pollution Prevention Plan... ...
Sutter County
Bid Due: 7/09/2026
...Site Storm Water Quality Management Guidelines 5. Worksite Posting - Compliance Monitoring Unit ...
Fresno Metropolitan Flood Control District
Bid Due: 6/17/2026
..., excavation, traffic control, storm water pollution prevention measures, construction of a reinforced...
Sutter County
Bid Due: 6/25/2026