| Location: | New Jersey |
|---|---|
| Posted: | Jun 27, 2025 |
| Due: | Jul 28, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W15QKN25X18NJ |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Description:
The U.S. Army Contracting Command - New Jersey, on behalf of the Office of the Project Manager, Maneuver Ammunition Systems (PM-MAS), is seeking to establish industrial sources for lightweight and high-strength materials for lethality overmatch. Recently there has been an increase in utilization of composite materials in aerospace, munitions, and other Department of Defense (DoD) applications. The U.S. Army has a need to establish additional composite materials industrial sources to stay ahead of emerging technologies and maintain lethality overmatch with our munitions and weapon systems.
Specifications:
The U.S. Army’s intent is to develop additional composite sources of supply allowing multiple vendors the opportunity to develop composite materials.
Nominal composite component requirements:
There are several specific requirements for 120mm composite sabot in KE ammunition. The sabot is a component within the projectile subassembly of the cartridge. The sabot typically consists of a three-petal design that wraps around the penetrator of the cartridge. During the gun launch of the projectile, the sabot travels down the bore of the gun tube and upon exit of the muzzle, it discards which enables the penetrator to continue flight. The composite sabot must seal gases created during ballistic firing as well as center and support the cartridge projectile during gun launch in the gun tube. The composite sabot is also critical for consistent projectile flight with the transfer of pressure load from ignition gases to the projectile in launch. In Figure 1, a diagram is provided of an 120mm M829A2 with the sabot highlighted with the red arrow. In Figure 2, a photo is provided of a composite sabot segment.
Figure 1. M829A2 Cartridge Diagram
This figure will be included in the attached document 'Market Survey_Lightweight and High-Strength Materials'
Figure 2. Composite Sabot Segment
This figure will be included in the attached document 'Market Survey_Lightweight and High-Strength Materials'
Submission Information:
THIS IS NOT A SOLICITATION AND DOES NOT OBLIGATE THE GOVERNMENT TO ISSUE A SOLICITATION. Please be advised that the Government will not pay for any information submitted under this announcement. Interested companies should submit their qualifications and capabilities electronically within 30 days of this notice to: michael.t.lau3.civ@army.mil or jennifer.m.rustwick.civ@army.mil. Interested companies should respond by providing the Government with the following information:
(1) Name of company and CAGE Code;
(2) Point of Contacts name, telephone number and E-mail address;
(3) Company address;
(4) Business size information;
(5) Identification of whether you are interested in this opportunity as a prime or a subcontractor;
(6) A brief summary of the company’s capabilities as it relates to composite material (to include organizations, description of facilities, equipment, manufacturing process, inspection capability, skills, personnel) and potential subcontractors’ capabilities;
(7) A brief summary of possible partnering/teaming arrangements;
Please identify any proprietary information submitted. A respondent to this survey must have the majority of the skills and facilities that are required to manufacture this item. If a respondent does not have these resources (technical, manufacturing, personnel, etc.) available, then it must demonstrate its ability to obtain them in a reasonable time period. If a respondent chooses to utilize the services of sub-tier vendors or subcontractors, those vendors or subcontractors must also meet the same resource criteria as the prime contractor.
This is a market survey, not a pre-solicitation notice. If a formal solicitation is generated at a later date a solicitation notice will be published. All information is to be submitted at no cost or obligation to the Government.
| Jul 3, 2025 | [Sources Sought (Updated)] Lightweight and High-Strength Materials |

With GovernmentContracts, you can: