| Location: | Missouri |
|---|---|
| Posted: | Aug 27, 2026 |
| Due: | Oct 15, 2026 |
| Agency: | Drexel Technologies |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Prebid Date | 9/8/26 10:00am |
| Bid Date | 10/15/26 2:00pm |
St. Charles County, MO
Date Issued: 8/25/2026
Sealed bids for the Western Transmission Main Phase 3C (hereinafter “Project”) will be received by the Public Water Supply District No. 2 of St. Charles County, Missouri (“Owner”), until 2:00 pm CST, on Thursday, October 15th, 2026 at the Owner’s office, 100 Water Drive, O’Fallon, MO 63368. There will be a pre-bid meeting at 10:00 am CST, on Tuesday September 8th, 2026 at the Owner’s office.
The Scope of Work for the Project includes the construction of approximately 14,741 linear feet of 30-inch Class 250 ductile iron water main, 337 linear feet of 30-inch restrained joint ductile iron pipe, approximately 50 linear feet of 42-inch steel casing installed by jack-and-bore methods, and connection to the existing water transmission system. The project also includes all associated appurtenances, including butterfly valves, fire hydrants, air release valves, fittings, testing, disinfection, restoration, and all incidental work necessary to provide a complete and operational water transmission main.
Bidding Documents may be downloaded from Drexel Technologies Plan room. www: Planroom.drexeltech.com .
Bid security in the amount of Five percent (5%) of the bid amount must accompany each bid, in accordance with the Instruction to Bidders.
Wages shall be paid to each employee engaged in the work at a rate not less than the prevailing rate of wages for the particular trade or occupation, as issued by the Missouri Department of Labor and Industrial Relations. The Contractor shall be responsible for complying with the prevailing rate of wages for St. Charles County, Missouri. The Contractor shall be responsible for complying with Missouri Immigration Laws, and must submit the Work Authorization Affidavit with Bid. Contractor shall provide a ten hour Occupational Safety and Health Administration (OSHA) construction safety program for its employees working onsite on the project, as described in Section 800.
THE OWNER INTENDS TO AWARD THE CONTRACT TO THE MOST RESPONSIVE, RESPONSIBLE BIDDER SUBMITTING THE LOWEST BID. THE OWNER RESERVES THE RIGHT TO REJECT ANY AND ALL BIDS, AND TO WAIVE ANY INFORMALITIES NOT INVOLVING PRICE, TIME OR CHANGES IN THE WORK IN THE BEST INTEREST OF THE OWNER.

With GovernmentContracts, you can:
.../ Prospect Road Water Transmission Main) Issue Date & Time 10/6/2026 05:00:03 PM ...
City of Wentzville
Bid Due: 10/27/2026
...water main, including approximately 160 linear feet of 48-inch steel casing installed by ...
Drexel Technologies
Bid Due: 11/19/2026
...water main, including approximately 160 linear feet of 48-inch steel casing installed by ...
Drexel Technologies
Bid Due: 11/19/2026
...water main, including approximately 160 linear feet of 48-inch steel casing installed by ...
Drexel Technologies
Bid Due: 11/19/2026