| Location: | Kansas |
|---|---|
| Posted: | Aug 26, 2026 |
| Due: | Sep 15, 2026 |
| Agency: | Junction County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Title: |
RFP - Municipal Gymnasium Project and Screen System
|
| Category: | Administration |
| Status: | Open |
|
| Request for Proposals / Request for Quotations | |||||||||||||||||||||||||
| Municipal Gymnasium Rear Projection System | |||||||||||||||||||||||||
| Issued by: City of Junction City, Kansas | |||||||||||||||||||||||||
| Department: Information Technology | |||||||||||||||||||||||||
| Project: Municipal Gymnasium Projector and Screen System | |||||||||||||||||||||||||
| Issue Date: August 26, 2026 | |||||||||||||||||||||||||
| Proposal Due Date: September 15, 2026 - 10:00 AM | |||||||||||||||||||||||||
| Submission Method: physical copy mailed to City Hall (address above) | |||||||||||||||||||||||||
| Primary Contact: Andrew Darrow, IT Director | |||||||||||||||||||||||||
| Contact Email: Andrew.darrow@junctioncity-ks.gov | |||||||||||||||||||||||||
| Contact Phone: 785-210-2950 | |||||||||||||||||||||||||
| 1. Purpose | |||||||||||||||||||||||||
| The City of Junction City is requesting proposals and quotations from qualified | |||||||||||||||||||||||||
| audiovisual vendors for the design, procurement, delivery, installation, configuration, | |||||||||||||||||||||||||
| and testing of a rear projection system for use in the City's Municipal Gymnasium. | |||||||||||||||||||||||||
| The proposed system shall include, at minimum: | |||||||||||||||||||||||||
| * | Rear projection screen | ||||||||||||||||||||||||
| * | Commercial-grade laser projector | ||||||||||||||||||||||||
| * | Appropriate projection lens | ||||||||||||||||||||||||
| * | Protective rack, enclosure, or mounting solution for the projector | ||||||||||||||||||||||||
| * | Required signal cabling and infrastructure | ||||||||||||||||||||||||
| * | Integration with the City's existing audio system | ||||||||||||||||||||||||
| * | User controls | ||||||||||||||||||||||||
| * | Training and documentation | ||||||||||||||||||||||||
| * | Warranty and support | ||||||||||||||||||||||||
| The system will be used for municipal events, public presentations, community | |||||||||||||||||||||||||
| programming, meetings, ceremonies, video playback, and other City functions. | |||||||||||||||||||||||||
| 2. Background and Existing Conditions | |||||||||||||||||||||||||
| The Municipal Gymnasium includes a stage area with an existing curtain opening. The | |||||||||||||||||||||||||
| City intends to use the stage area for a rear projection system. |
Andrew Darrow 700 N. Jefferson
Director Junction City, KS 66441
(785) 210-2950
Information Technology
26 August 2026
Request for Proposals / Request for Quotations
Municipal Gymnasium Rear Projection System
Issued by: City of Junction City, Kansas
Department: Information Technology
Project: Municipal Gymnasium Projector and Screen System
Issue Date: August 26, 2026
Proposal Due Date: September 15, 2026 - 10:00 AM
Submission Method: physical copy mailed to City Hall (address above)
Primary Contact: Andrew Darrow, IT Director
Contact Email: Andrew.darrow@junctioncity-ks.gov
Contact Phone: 785-210-2950
1. Purpose
The City of Junction City is requesting proposals and quotations from qualified
audiovisual vendors for the design, procurement, delivery, installation, configuration,
and testing of a rear projection system for use in the City's Municipal Gymnasium.
The proposed system shall include, at minimum:
* Rear projection screen
* Commercial-grade laser projector
* Appropriate projection lens
* Protective rack, enclosure, or mounting solution for the projector
* Required signal cabling and infrastructure
* Integration with the City's existing audio system
* User controls
* Training and documentation
* Warranty and support
The system will be used for municipal events, public presentations, community
programming, meetings, ceremonies, video playback, and other City functions.
2. Background and Existing Conditions
The Municipal Gymnasium includes a stage area with an existing curtain opening. The
City intends to use the stage area for a rear projection system.
| Known site conditions include: | ||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Item | Existing Condition | |||||||||||||||||||||||||||||||||||||
| Projection type desired | Rear projection | |||||||||||||||||||||||||||||||||||||
| Available stage depth | Approximately 27 feet from curtain line to back wall | |||||||||||||||||||||||||||||||||||||
| Screen format | 16:9 widescreen | |||||||||||||||||||||||||||||||||||||
| Minimum screen size | 382-inch diagonal | |||||||||||||||||||||||||||||||||||||
| Existing audio | Existing gymnasium audio system to be reused/integrated | |||||||||||||||||||||||||||||||||||||
| Intended projector | ||||||||||||||||||||||||||||||||||||||
| Behind the screen on the stage side | ||||||||||||||||||||||||||||||||||||||
| location | ||||||||||||||||||||||||||||||||||||||
| Projector shall be protected by rack, cage, enclosure, shelf, or equivalent | ||||||||||||||||||||||||||||||||||||||
| Desired protection | ||||||||||||||||||||||||||||||||||||||
| secure installation method | ||||||||||||||||||||||||||||||||||||||
| The selected vendor shall verify all field measurements, mounting conditions, power | ||||||||||||||||||||||||||||||||||||||
| availability, structural requirements, signal paths, and existing audio system | ||||||||||||||||||||||||||||||||||||||
| compatibility prior to final equipment ordering. | ||||||||||||||||||||||||||||||||||||||
| 3. Project Objectives | ||||||||||||||||||||||||||||||||||||||
| The City's objectives are to obtain a system that is: | ||||||||||||||||||||||||||||||||||||||
| 1. | Large enough for gymnasium viewing | |||||||||||||||||||||||||||||||||||||
| * | Minimum 382-inch diagonal, 16:9 format. | |||||||||||||||||||||||||||||||||||||
| 2. | Appropriate for rear projection | |||||||||||||||||||||||||||||||||||||
| * | Designed for the available stage depth and sightlines. | |||||||||||||||||||||||||||||||||||||
| 3. | Commercial-grade | |||||||||||||||||||||||||||||||||||||
| * | Suitable for municipal/public facility use, not consumer or classroom-only | |||||||||||||||||||||||||||||||||||||
| equipment. | ||||||||||||||||||||||||||||||||||||||
| 4. | Low maintenance | |||||||||||||||||||||||||||||||||||||
| * | Laser projector preferred/required; no lamp-based projectors. | |||||||||||||||||||||||||||||||||||||
| 5. | Protected from damage | |||||||||||||||||||||||||||||||||||||
| * | Projector shall be mounted or housed in a way that protects it from | |||||||||||||||||||||||||||||||||||||
| accidental impact, tampering, dust, and routine stage activity. | ||||||||||||||||||||||||||||||||||||||
| 6. | Easy for City staff to operate | |||||||||||||||||||||||||||||||||||||
| * | Simple source selection, power on/off, volume routing, and basic | |||||||||||||||||||||||||||||||||||||
| operation. | ||||||||||||||||||||||||||||||||||||||
| 7. | Integrated with existing audio | |||||||||||||||||||||||||||||||||||||
| * | Video/audio sources shall connect to the existing gymnasium audio | |||||||||||||||||||||||||||||||||||||
| system. | ||||||||||||||||||||||||||||||||||||||
| 8. | Supportable by City IT | |||||||||||||||||||||||||||||||||||||
| * | Network-connected devices must meet reasonable municipal | |||||||||||||||||||||||||||||||||||||
| cybersecurity and administrative control requirements. |
Known site conditions include:
Item Existing Condition
Projection type desired Rear projection
Available stage depth Approximately 27 feet from curtain line to back wall
Screen format 16:9 widescreen
Minimum screen size 382-inch diagonal
Existing audio Existing gymnasium audio system to be reused/integrated
Intended projector
Behind the screen on the stage side
location
Projector shall be protected by rack, cage, enclosure, shelf, or equivalent
Desired protection
secure installation method
The selected vendor shall verify all field measurements, mounting conditions, power
availability, structural requirements, signal paths, and existing audio system
compatibility prior to final equipment ordering.
3. Project Objectives
The City's objectives are to obtain a system that is:
1. Large enough for gymnasium viewing
* Minimum 382-inch diagonal, 16:9 format.
2. Appropriate for rear projection
* Designed for the available stage depth and sightlines.
3. Commercial-grade
* Suitable for municipal/public facility use, not consumer or classroom-only
equipment.
4. Low maintenance
* Laser projector preferred/required; no lamp-based projectors.
5. Protected from damage
* Projector shall be mounted or housed in a way that protects it from
accidental impact, tampering, dust, and routine stage activity.
6. Easy for City staff to operate
* Simple source selection, power on/off, volume routing, and basic
operation.
7. Integrated with existing audio
* Video/audio sources shall connect to the existing gymnasium audio
system.
8. Supportable by City IT
* Network-connected devices must meet reasonable municipal
cybersecurity and administrative control requirements.
| 4. Scope of Work | |||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| The selected vendor shall provide a complete turnkey solution including all labor, | |||||||||||||||||||||||||||||||||
| materials, equipment, configuration, programming, testing, and documentation | |||||||||||||||||||||||||||||||||
| necessary for a fully functional rear projection system. | |||||||||||||||||||||||||||||||||
| 4.1 Design and Field Verification | |||||||||||||||||||||||||||||||||
| Vendor shall: | |||||||||||||||||||||||||||||||||
| * | Conduct a site visit prior to final design. | ||||||||||||||||||||||||||||||||
| * | Verify actual stage depth, curtain clearance, screen placement, ceiling height, | ||||||||||||||||||||||||||||||||
| wall construction, power availability, and cable routes. | |||||||||||||||||||||||||||||||||
| * | Confirm final screen size and mounting location. | ||||||||||||||||||||||||||||||||
| * | Confirm final projector placement, lens throw ratio, vertical offset, and horizontal | ||||||||||||||||||||||||||||||||
| alignment. | |||||||||||||||||||||||||||||||||
| * | Use manufacturer projection calculators to verify projector/lens/screen | ||||||||||||||||||||||||||||||||
| compatibility. | |||||||||||||||||||||||||||||||||
| * | Identify any required electrical work, structural work, lift access, or City-provided | ||||||||||||||||||||||||||||||||
| preparation. | |||||||||||||||||||||||||||||||||
| 4.2 Rear Projection Screen | |||||||||||||||||||||||||||||||||
| Vendor shall provide and install or supply a rear projection screen meeting the following | |||||||||||||||||||||||||||||||||
| minimum requirements: | |||||||||||||||||||||||||||||||||
| Requirement | Minimum Specification | ||||||||||||||||||||||||||||||||
| Screen type | Rear projection screen | ||||||||||||||||||||||||||||||||
| Forma | t | 16:9 widescreen | |||||||||||||||||||||||||||||||
| Minimum diagonal | 382 inches | ||||||||||||||||||||||||||||||||
| Screen surface | Rear projection material appropriate for gymnasium/public venue use | ||||||||||||||||||||||||||||||||
| Viewing area | Vendor shall state exact viewable width and height | ||||||||||||||||||||||||||||||||
| Frame/system | Heavy-duty frame, fixed frame, fast-fold, motorized, or equivalent as proposed | ||||||||||||||||||||||||||||||||
| Vendor shall specify whether screen is permanent, semi-permanent, portable, or | |||||||||||||||||||||||||||||||||
| Setup | |||||||||||||||||||||||||||||||||
| retractable | |||||||||||||||||||||||||||||||||
| Gain | Vendor shall state screen gain | ||||||||||||||||||||||||||||||||
| Viewing angle | Vendor shall state usable viewing angle | ||||||||||||||||||||||||||||||||
| Storage/protection | Vendor shall describe how the screen is protected when not in use, if applicable | ||||||||||||||||||||||||||||||||
| The City will consider solutions equivalent to a large-format rear projection screen of | |||||||||||||||||||||||||||||||||
| approximately 382-inch diagonal or larger, 16:9 format. | |||||||||||||||||||||||||||||||||
| 4.3 Projector | |||||||||||||||||||||||||||||||||
| Vendor shall provide a commercial/professional laser projector suitable for rear | |||||||||||||||||||||||||||||||||
| projection in a gymnasium environment. | |||||||||||||||||||||||||||||||||
4. Scope of Work
The selected vendor shall provide a complete turnkey solution including all labor,
materials, equipment, configuration, programming, testing, and documentation
necessary for a fully functional rear projection system.
4.1 Design and Field Verification
Vendor shall:
* Conduct a site visit prior to final design.
* Verify actual stage depth, curtain clearance, screen placement, ceiling height,
wall construction, power availability, and cable routes.
* Confirm final screen size and mounting location.
* Confirm final projector placement, lens throw ratio, vertical offset, and horizontal
alignment.
* Use manufacturer projection calculators to verify projector/lens/screen
compatibility.
* Identify any required electrical work, structural work, lift access, or City-provided
preparation.
4.2 Rear Projection Screen
Vendor shall provide and install or supply a rear projection screen meeting the following
minimum requirements:
Requirement Minimum Specification
Screen type Rear projection screen
Format 16:9 widescreen
Minimum diagonal 382 inches
Screen surface Rear projection material appropriate for gymnasium/public venue use
Viewing area Vendor shall state exact viewable width and height
Frame/system Heavy-duty frame, fixed frame, fast-fold, motorized, or equivalent as proposed
Vendor shall specify whether screen is permanent, semi-permanent, portable, or
Setup
retractable
Gain Vendor shall state screen gain
Viewing angle Vendor shall state usable viewing angle
Storage/protection Vendor shall describe how the screen is protected when not in use, if applicable
The City will consider solutions equivalent to a large-format rear projection screen of
approximately 382-inch diagonal or larger, 16:9 format.
4.3 Projector
Vendor shall provide a commercial/professional laser projector suitable for rear
projection in a gymnasium environment.
| Minimum projector requirements: | ||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Requirement | Minimum Specification | |||||||||||||||||||||||||||||||||||||||||||||
| Projector type | Commercial large-venue laser projector | |||||||||||||||||||||||||||||||||||||||||||||
| Light source | Laser or laser/phosphor | |||||||||||||||||||||||||||||||||||||||||||||
| Brightness | Vendor shall recommend brightness; 13,000 lumens minimum preferred | |||||||||||||||||||||||||||||||||||||||||||||
| Resolution | WUXGA minimum; 4K or 4K enhancement preferred | |||||||||||||||||||||||||||||||||||||||||||||
| Aspect support | 16:9 and common computer/video formats | |||||||||||||||||||||||||||||||||||||||||||||
| Lens | Interchangeable or appropriate fixed lens verified for the installation | |||||||||||||||||||||||||||||||||||||||||||||
| Projection mode | Must support rear projection image orientation | |||||||||||||||||||||||||||||||||||||||||||||
| Lens controls | Powered or adjustable zoom/focus/lens shift preferred | |||||||||||||||||||||||||||||||||||||||||||||
| Inputs | HDMI minimum; HDBaseT, SDI, or AV-over-IP preferred where appropriate | |||||||||||||||||||||||||||||||||||||||||||||
| Network management | Ethernet/network control preferred | |||||||||||||||||||||||||||||||||||||||||||||
| Operating environmen | t | Suitable for public facility/stage environment | ||||||||||||||||||||||||||||||||||||||||||||
| Warranty | Vendor shall state manufacturer warranty | |||||||||||||||||||||||||||||||||||||||||||||
| Vendor shall specify: | ||||||||||||||||||||||||||||||||||||||||||||||
| * | Projector make and model | |||||||||||||||||||||||||||||||||||||||||||||
| * | Light output rating and measurement standard | |||||||||||||||||||||||||||||||||||||||||||||
| * | Native resolution | |||||||||||||||||||||||||||||||||||||||||||||
| * | Light source life | |||||||||||||||||||||||||||||||||||||||||||||
| * | Noise level | |||||||||||||||||||||||||||||||||||||||||||||
| * | Lens model | |||||||||||||||||||||||||||||||||||||||||||||
| * | Throw ratio range | |||||||||||||||||||||||||||||||||||||||||||||
| * | Expected image size from proposed mounting location | |||||||||||||||||||||||||||||||||||||||||||||
| * | Expected brightness on screen | |||||||||||||||||||||||||||||||||||||||||||||
| * | Required ventilation clearances | |||||||||||||||||||||||||||||||||||||||||||||
| * | Estimated maintenance requirements | |||||||||||||||||||||||||||||||||||||||||||||
| 4.4 Lens and Throw Requirements | ||||||||||||||||||||||||||||||||||||||||||||||
| The City has approximately 27 feet of available depth from the curtain line to the back | ||||||||||||||||||||||||||||||||||||||||||||||
| wall of the stage. Vendor shall verify actual usable throw distance. | ||||||||||||||||||||||||||||||||||||||||||||||
| The projector and lens must be capable of filling a minimum 382-inch diagonal 16:9 rear | ||||||||||||||||||||||||||||||||||||||||||||||
| projection screen from the available rear projection distance. | ||||||||||||||||||||||||||||||||||||||||||||||
| Vendor shall provide calculations showing: | ||||||||||||||||||||||||||||||||||||||||||||||
| Lens-to-Screen Distance Throw Ratio = Image Width | ||||||||||||||||||||||||||||||||||||||||||||||
| Image Width | ||||||||||||||||||||||||||||||||||||||||||||||
| Vendor shall identify: | ||||||||||||||||||||||||||||||||||||||||||||||
| * | Actual lens-to-screen distance used in the design | |||||||||||||||||||||||||||||||||||||||||||||
| * | Required throw ratio | |||||||||||||||||||||||||||||||||||||||||||||
| * | Proposed lens throw ratio range | |||||||||||||||||||||||||||||||||||||||||||||
| * | Vertical and horizontal lens shift requirements | |||||||||||||||||||||||||||||||||||||||||||||
| * | Whether any digital keystone correction is required |
Minimum projector requirements:
Requirement Minimum Specification
Projector type Commercial large-venue laser projector
Light source Laser or laser/phosphor
Brightness Vendor shall recommend brightness; 13,000 lumens minimum preferred
Resolution WUXGA minimum; 4K or 4K enhancement preferred
Aspect support 16:9 and common computer/video formats
Lens Interchangeable or appropriate fixed lens verified for the installation
Projection mode Must support rear projection image orientation
Lens controls Powered or adjustable zoom/focus/lens shift preferred
Inputs HDMI minimum; HDBaseT, SDI, or AV-over-IP preferred where appropriate
Network management Ethernet/network control preferred
Operating environment Suitable for public facility/stage environment
Warranty Vendor shall state manufacturer warranty
Vendor shall specify:
* Projector make and model
* Light output rating and measurement standard
* Native resolution
* Light source life
* Noise level
* Lens model
* Throw ratio range
* Expected image size from proposed mounting location
* Expected brightness on screen
* Required ventilation clearances
* Estimated maintenance requirements
4.4 Lens and Throw Requirements
The City has approximately 27 feet of available depth from the curtain line to the back
wall of the stage. Vendor shall verify actual usable throw distance.
The projector and lens must be capable of filling a minimum 382-inch diagonal 16:9 rear
projection screen from the available rear projection distance.
Vendor shall provide calculations showing:
Lens-to-Screen Distance
Throw Ratio =
Image Width
Vendor shall identify:
* Actual lens-to-screen distance used in the design
* Required throw ratio
* Proposed lens throw ratio range
* Vertical and horizontal lens shift requirements
* Whether any digital keystone correction is required
| The City prefers a design that uses optical lens shift and proper physical | ||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| alignment rather than digital keystone correction. | ||||||||||||||||||||||||||||
| 4.5 Projector Rack, Mount, or Protective Enclosure | ||||||||||||||||||||||||||||
| Vendor shall provide a secure and protective solution for the projector. The proposal | ||||||||||||||||||||||||||||
| shall include one of the following, as appropriate: | ||||||||||||||||||||||||||||
| * | Projector rack | |||||||||||||||||||||||||||
| * | Protective cage | |||||||||||||||||||||||||||
| * | Wall-mounted shelf/platform | |||||||||||||||||||||||||||
| * | Ceiling/pipe mount | |||||||||||||||||||||||||||
| * | Floor-standing rack with protective enclosure | |||||||||||||||||||||||||||
| * | Custom protective mounting solution | |||||||||||||||||||||||||||
| The protective solution shall: | ||||||||||||||||||||||||||||
| * | Prevent accidental movement or misalignment | |||||||||||||||||||||||||||
| * | Protect equipment from impact and tampering | |||||||||||||||||||||||||||
| * | Allow adequate ventilation | |||||||||||||||||||||||||||
| * | Permit service access | |||||||||||||||||||||||||||
| * | Provide cable strain relief | |||||||||||||||||||||||||||
| * | Support lockable access where practical | |||||||||||||||||||||||||||
| * | Be suitable for a municipal/public facility environment | |||||||||||||||||||||||||||
| Vendor shall state the recommended projector lens height above the stage floor and | ||||||||||||||||||||||||||||
| explain why the proposed height is appropriate. | ||||||||||||||||||||||||||||
| The City prefers the projector to be mounted or protected in a manner that avoids floor- | ||||||||||||||||||||||||||||
| level obstruction and reduces the likelihood of damage. | ||||||||||||||||||||||||||||
| 4.6 Audio Integration | ||||||||||||||||||||||||||||
| Vendor shall connect the projection system to the existing gymnasium audio system. | ||||||||||||||||||||||||||||
| Vendor shall: | ||||||||||||||||||||||||||||
| * | Inspect existing audio input options. | |||||||||||||||||||||||||||
| * | Provide all required cabling, adapters, converters, wall plates, interfaces, or | |||||||||||||||||||||||||||
| DSP/audio routing components. | ||||||||||||||||||||||||||||
| * | Support audio from HDMI/video sources to the existing sound system. | |||||||||||||||||||||||||||
| * | Provide a clean, reliable connection to the existing audio system. | |||||||||||||||||||||||||||
| * | Avoid hum, buzz, ground loop issues, and mismatched audio levels. | |||||||||||||||||||||||||||
| * | Clearly document the connection path. | |||||||||||||||||||||||||||
| Vendor shall identify any limitations in the existing audio system and any recommended | ||||||||||||||||||||||||||||
| upgrades as alternates. | ||||||||||||||||||||||||||||
The City prefers a design that uses optical lens shift and proper physical
alignment rather than digital keystone correction.
4.5 Projector Rack, Mount, or Protective Enclosure
Vendor shall provide a secure and protective solution for the projector. The proposal
shall include one of the following, as appropriate:
* Projector rack
* Protective cage
* Wall-mounted shelf/platform
* Ceiling/pipe mount
* Floor-standing rack with protective enclosure
* Custom protective mounting solution
The protective solution shall:
* Prevent accidental movement or misalignment
* Protect equipment from impact and tampering
* Allow adequate ventilation
* Permit service access
* Provide cable strain relief
* Support lockable access where practical
* Be suitable for a municipal/public facility environment
Vendor shall state the recommended projector lens height above the stage floor and
explain why the proposed height is appropriate.
The City prefers the projector to be mounted or protected in a manner that avoids floor-
level obstruction and reduces the likelihood of damage.
4.6 Audio Integration
Vendor shall connect the projection system to the existing gymnasium audio system.
Vendor shall:
* Inspect existing audio input options.
* Provide all required cabling, adapters, converters, wall plates, interfaces, or
DSP/audio routing components.
* Support audio from HDMI/video sources to the existing sound system.
* Provide a clean, reliable connection to the existing audio system.
* Avoid hum, buzz, ground loop issues, and mismatched audio levels.
* Clearly document the connection path.
Vendor shall identify any limitations in the existing audio system and any recommended
upgrades as alternates.
| 4.7 Video and Signal Connectivity | |||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Vendor shall provide a complete signal path from user input locations to the projector | |||||||||||||||||||||||||||
| and audio system | . | ||||||||||||||||||||||||||
| At minimum, the system should support: | |||||||||||||||||||||||||||
| * | HDMI input for laptops and media devices | ||||||||||||||||||||||||||
| * | Audio routing to existing gym sound system | ||||||||||||||||||||||||||
| * | A practical user connection point at or near the stage, control area, or other City- | ||||||||||||||||||||||||||
| approved location | |||||||||||||||||||||||||||
| * | Cabling rated for the installed distance and environment | ||||||||||||||||||||||||||
| Acceptable signal transport may include: | |||||||||||||||||||||||||||
| * | HDMI with active/fiber cabling | ||||||||||||||||||||||||||
| * | HDBaseT | ||||||||||||||||||||||||||
| * | AV-over-IP | ||||||||||||||||||||||||||
| * | SDI where appropriate | ||||||||||||||||||||||||||
| * | Other professional AV transport proposed by vendor | ||||||||||||||||||||||||||
| Vendor shall include all necessary | : | ||||||||||||||||||||||||||
| * | Cables | ||||||||||||||||||||||||||
| * | Transmitters/receivers | ||||||||||||||||||||||||||
| * | Wall plates | ||||||||||||||||||||||||||
| * | Adapters | ||||||||||||||||||||||||||
| * | Power supplies | ||||||||||||||||||||||||||
| * | Mounting hardware | ||||||||||||||||||||||||||
| * | Control cabling | ||||||||||||||||||||||||||
| * | Network cabling, if required | ||||||||||||||||||||||||||
| Consumer-grade wireless screen mirroring shall not be the only supported input | |||||||||||||||||||||||||||
| method. | |||||||||||||||||||||||||||
| 4.8 Control System | |||||||||||||||||||||||||||
| Vendor shall provide an easy-to-use control method for City staff. | |||||||||||||||||||||||||||
| Acceptable options include: | |||||||||||||||||||||||||||
| * | Wall-mounted control panel | ||||||||||||||||||||||||||
| * | Button panel | ||||||||||||||||||||||||||
| * | Touch panel | ||||||||||||||||||||||||||
| * | Web interface | ||||||||||||||||||||||||||
| * | Projector remote plus documented startup/shutdown procedure | ||||||||||||||||||||||||||
| * | Integrated AV control processor, if proposed | ||||||||||||||||||||||||||
4.7 Video and Signal Connectivity
Vendor shall provide a complete signal path from user input locations to the projector
and audio system.
At minimum, the system should support:
* HDMI input for laptops and media devices
* Audio routing to existing gym sound system
* A practical user connection point at or near the stage, control area, or other City-
approved location
* Cabling rated for the installed distance and environment
Acceptable signal transport may include:
* HDMI with active/fiber cabling
* HDBaseT
* AV-over-IP
* SDI where appropriate
* Other professional AV transport proposed by vendor
Vendor shall include all necessary:
* Cables
* Transmitters/receivers
* Wall plates
* Adapters
* Power supplies
* Mounting hardware
* Control cabling
* Network cabling, if required
Consumer-grade wireless screen mirroring shall not be the only supported input
method.
4.8 Control System
Vendor shall provide an easy-to-use control method for City staff.
Acceptable options include:
* Wall-mounted control panel
* Button panel
* Touch panel
* Web interface
* Projector remote plus documented startup/shutdown procedure
* Integrated AV control processor, if proposed
| Controls should include, at minimum: | |||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| * | Projector power on/off | ||||||||||||||||||||||||
| * | Source selection | ||||||||||||||||||||||||
| * | Audio routing/volume handoff where applicable | ||||||||||||||||||||||||
| * | Screen operation if motorized | ||||||||||||||||||||||||
| * | System status indicators where available | ||||||||||||||||||||||||
| Vendor shall explain the proposed user workflow. | |||||||||||||||||||||||||
| 4.9 Electrical Requirements | |||||||||||||||||||||||||
| Vendor shall identify all electrical requirements, including: | |||||||||||||||||||||||||
| * | Projector power requirements | ||||||||||||||||||||||||
| * | Rack/enclosure power requirements | ||||||||||||||||||||||||
| * | Control equipment power requirements | ||||||||||||||||||||||||
| * | Screen power requirements, if motorized | ||||||||||||||||||||||||
| * | Location and quantity of outlets needed | ||||||||||||||||||||||||
| * | Surge protection or power conditioning recommendations | ||||||||||||||||||||||||
| Unless otherwise stated, electrical work may be performed by the City or a City- | |||||||||||||||||||||||||
| approved electrician. Vendor shall clearly identify any electrical work excluded from the | |||||||||||||||||||||||||
| proposal. | |||||||||||||||||||||||||
| 4.10 Cybersecurity and Network Requirements | |||||||||||||||||||||||||
| If any proposed equipment connects to the City network, the following requirements | |||||||||||||||||||||||||
| apply: | |||||||||||||||||||||||||
| * | Device must support changing default usernames and passwords. | ||||||||||||||||||||||||
| * | Default credentials must be changed before acceptance. | ||||||||||||||||||||||||
| * | Device firmware shall be updated to current stable release before handoff. | ||||||||||||||||||||||||
| * | Unused services shall be disabled where possible. | ||||||||||||||||||||||||
| * | Wireless features shall be disabled unless specifically approved by the City. | ||||||||||||||||||||||||
| * | Cloud-based remote access shall not be enabled without written City approval. | ||||||||||||||||||||||||
| * | Vendor remote access shall not be persistent unless separately approved. | ||||||||||||||||||||||||
| * | Network settings shall be documented. | ||||||||||||||||||||||||
| * | Device shall support static IP or DHCP reservation | . | |||||||||||||||||||||||
| * | Vendor shall provide MAC addresses and management port requirements. | ||||||||||||||||||||||||
| The City reserves the right to place AV equipment on a segmented network or VLAN. | |||||||||||||||||||||||||
Controls should include, at minimum:
* Projector power on/off
* Source selection
* Audio routing/volume handoff where applicable
* Screen operation if motorized
* System status indicators where available
Vendor shall explain the proposed user workflow.
4.9 Electrical Requirements
Vendor shall identify all electrical requirements, including:
* Projector power requirements
* Rack/enclosure power requirements
* Control equipment power requirements
* Screen power requirements, if motorized
* Location and quantity of outlets needed
* Surge protection or power conditioning recommendations
Unless otherwise stated, electrical work may be performed by the City or a City-
approved electrician. Vendor shall clearly identify any electrical work excluded from the
proposal.
4.10 Cybersecurity and Network Requirements
If any proposed equipment connects to the City network, the following requirements
apply:
* Device must support changing default usernames and passwords.
* Default credentials must be changed before acceptance.
* Device firmware shall be updated to current stable release before handoff.
* Unused services shall be disabled where possible.
* Wireless features shall be disabled unless specifically approved by the City.
* Cloud-based remote access shall not be enabled without written City approval.
* Vendor remote access shall not be persistent unless separately approved.
* Network settings shall be documented.
* Device shall support static IP or DHCP reservation.
* Vendor shall provide MAC addresses and management port requirements.
The City reserves the right to place AV equipment on a segmented network or VLAN.
| 5. Minimum Technical Specifications | |||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| The proposed solution shall meet or exceed the following minimum specifications. | |||||||||||||||||||||||||||||||||||||||||
| Component | Minimum Requirement | ||||||||||||||||||||||||||||||||||||||||
| Projection type | Rear projection | ||||||||||||||||||||||||||||||||||||||||
| Stage depth | Must work within approximately 27 feet curtain-to-back-wall depth | ||||||||||||||||||||||||||||||||||||||||
| Screen format | 16:9 | ||||||||||||||||||||||||||||||||||||||||
| Screen diagonal | Minimum 382 inches | ||||||||||||||||||||||||||||||||||||||||
| Screen surface | Rear projection surface | ||||||||||||||||||||||||||||||||||||||||
| Projector light source | Laser | ||||||||||||||||||||||||||||||||||||||||
| Projector brightness | Vendor-recommended; 13,000 lumens minimum preferred | ||||||||||||||||||||||||||||||||||||||||
| Projector resolution | WUXGA minimum; 4K/4K enhancement preferred | ||||||||||||||||||||||||||||||||||||||||
| Lens | Verified for actual throw distance and screen size | ||||||||||||||||||||||||||||||||||||||||
| Mount/protection | Protective rack, cage, shelf, enclosure, or mount required | ||||||||||||||||||||||||||||||||||||||||
| Audio | Must connect to existing gym audio system | ||||||||||||||||||||||||||||||||||||||||
| Cabling | All required cabling included | ||||||||||||||||||||||||||||||||||||||||
| Controls | Staff-friendly control method required | ||||||||||||||||||||||||||||||||||||||||
| Documentation | As-built documentation and user guide required | ||||||||||||||||||||||||||||||||||||||||
| Training | Staff training required | ||||||||||||||||||||||||||||||||||||||||
| Warranty | Manufacturer and labor warranty required | ||||||||||||||||||||||||||||||||||||||||
| 6. Preferred Projector Characteristics | |||||||||||||||||||||||||||||||||||||||||
| The City prefers, but does not strictly require, the following: | |||||||||||||||||||||||||||||||||||||||||
| * | Minimum 13,000 ISO/ANSI lumens | ||||||||||||||||||||||||||||||||||||||||
| * | 4K enhancement or native 4K | ||||||||||||||||||||||||||||||||||||||||
| * | Interchangeable lens system | ||||||||||||||||||||||||||||||||||||||||
| * | Lens throw ratio suitable for approximately 24-27 feet lens-to-screen distance | ||||||||||||||||||||||||||||||||||||||||
| * | Rear projection image mode | ||||||||||||||||||||||||||||||||||||||||
| * | Powered lens shift, zoom, and focus | ||||||||||||||||||||||||||||||||||||||||
| * | HDBaseT input | ||||||||||||||||||||||||||||||||||||||||
| * | Ethernet control/monitoring | ||||||||||||||||||||||||||||||||||||||||
| * | Low maintenance laser light source | ||||||||||||||||||||||||||||||||||||||||
| * | Quiet operation suitable for stage use | ||||||||||||||||||||||||||||||||||||||||
| * | Black chassis or low-visibility installation, where practical | ||||||||||||||||||||||||||||||||||||||||
| * | Lockable or physically protected installation |
5. Minimum Technical Specifications
The proposed solution shall meet or exceed the following minimum specifications.
Component Minimum Requirement
Projection type Rear projection
Stage depth Must work within approximately 27 feet curtain-to-back-wall depth
Screen format 16:9
Screen diagonal Minimum 382 inches
Screen surface Rear projection surface
Projector light source Laser
Projector brightness Vendor-recommended; 13,000 lumens minimum preferred
Projector resolution WUXGA minimum; 4K/4K enhancement preferred
Lens Verified for actual throw distance and screen size
Mount/protection Protective rack, cage, shelf, enclosure, or mount required
Audio Must connect to existing gym audio system
Cabling All required cabling included
Controls Staff-friendly control method required
Documentation As-built documentation and user guide required
Training Staff training required
Warranty Manufacturer and labor warranty required
6. Preferred Projector Characteristics
The City prefers, but does not strictly require, the following:
* Minimum 13,000 ISO/ANSI lumens
* 4K enhancement or native 4K
* Interchangeable lens system
* Lens throw ratio suitable for approximately 24-27 feet lens-to-screen distance
* Rear projection image mode
* Powered lens shift, zoom, and focus
* HDBaseT input
* Ethernet control/monitoring
* Low maintenance laser light source
* Quiet operation suitable for stage use
* Black chassis or low-visibility installation, where practical
* Lockable or physically protected installation
| 7. Alternates Requested | ||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Vendors should provide the following pricing alternates if available. | ||||||||||||||
| Alternate | Description | |||||||||||||
| Alternate 1 | Higher-brightness projector option | |||||||||||||
| Alternate 2 | 4K/native 4K projector option | |||||||||||||
| Alternate 3 | Motorized or retractable rear projection screen option | |||||||||||||
| Alternate 4 | Permanent fixed-frame screen option | |||||||||||||
| Alternate 5 | Portable/fast-fold screen option | |||||||||||||
| Alternate 6 | Enhanced control system with wall panel or touch panel | |||||||||||||
| Alternate 7 | Additional input locations | |||||||||||||
| Alternate 8 | Audio system improvements if existing system limitations are identified | |||||||||||||
| Alternate 9 | Extended warranty / maintenance agreement |
| 8. Vendor Responsibilities | ||||||||||||||||||||||
| The selected vendor shall be responsible for: | ||||||||||||||||||||||
| * | Site verification | |||||||||||||||||||||
| * | Final system design | |||||||||||||||||||||
| * | Equipment procurement | |||||||||||||||||||||
| * | Delivery | |||||||||||||||||||||
| * | Installation | |||||||||||||||||||||
| * | Mounting and alignment | |||||||||||||||||||||
| * | Cabling | |||||||||||||||||||||
| * | Audio integration | |||||||||||||||||||||
| * | Projector configuration | |||||||||||||||||||||
| * | Control configuration | |||||||||||||||||||||
| * | Testing | |||||||||||||||||||||
| * | Staff training | |||||||||||||||||||||
| * | Documentation | |||||||||||||||||||||
| * | Warranty support | |||||||||||||||||||||
| The vendor shall provide a complete working system. Any required component not | ||||||||||||||||||||||
| specifically listed but necessary for normal operation shall be included in the proposal. | ||||||||||||||||||||||
| 9. City Responsibilities | ||||||||||||||||||||||
| The City anticipates providing: | ||||||||||||||||||||||
| * | Access to the Municipal Gymnasium for site visits and installation | |||||||||||||||||||||
| * | Coordination with City staff for scheduling | |||||||||||||||||||||
| * | Access to existing audio system | |||||||||||||||||||||
| * | Available electrical circuits, if existing and adequate | |||||||||||||||||||||
| * | Network information, if network connection is approved |
7. Alternates Requested
Vendors should provide the following pricing alternates if available.
Alternate Description
Alternate 1 Higher-brightness projector option
Alternate 2 4K/native 4K projector option
Alternate 3 Motorized or retractable rear projection screen option
Alternate 4 Permanent fixed-frame screen option
Alternate 5 Portable/fast-fold screen option
Alternate 6 Enhanced control system with wall panel or touch panel
Alternate 7 Additional input locations
Alternate 8 Audio system improvements if existing system limitations are identified
Alternate 9 Extended warranty / maintenance agreement
8. Vendor Responsibilities
The selected vendor shall be responsible for:
* Site verification
* Final system design
* Equipment procurement
* Delivery
* Installation
* Mounting and alignment
* Cabling
* Audio integration
* Projector configuration
* Control configuration
* Testing
* Staff training
* Documentation
* Warranty support
The vendor shall provide a complete working system. Any required component not
specifically listed but necessary for normal operation shall be included in the proposal.
9. City Responsibilities
The City anticipates providing:
* Access to the Municipal Gymnasium for site visits and installation
* Coordination with City staff for scheduling
* Access to existing audio system
* Available electrical circuits, if existing and adequate
* Network information, if network connection is approved
| * | Review and approval of final mounting locations | ||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| The City may provide electrical work separately if required. Vendors shall clearly identify | |||||||||||||||||||||||||
| any electrical work needed. | |||||||||||||||||||||||||
| 10. Site Visit | |||||||||||||||||||||||||
| A site visit is Strongly Recommended. | |||||||||||||||||||||||||
| Site visit date and time can be scheduled with the IT Director via phone or email. | |||||||||||||||||||||||||
| Vendors are responsible for taking their own measurements and verifying installation | |||||||||||||||||||||||||
| conditions. Failure to attend the site visit does not relieve the vendor from providing a | |||||||||||||||||||||||||
| complete and functional system if awarded. | |||||||||||||||||||||||||
| 11. Proposal Submission Requirements | |||||||||||||||||||||||||
| Vendor proposals shall include the following: | |||||||||||||||||||||||||
| 11.1 Company Information | |||||||||||||||||||||||||
| * | Company name | ||||||||||||||||||||||||
| * | Address | ||||||||||||||||||||||||
| * | Primary contact | ||||||||||||||||||||||||
| * | Phone number | ||||||||||||||||||||||||
| * | Email address | ||||||||||||||||||||||||
| * | Years in business | ||||||||||||||||||||||||
| * | Relevant public-sector or gymnasium/auditorium AV experience | ||||||||||||||||||||||||
| 11.2 Technical Proposal | |||||||||||||||||||||||||
| Include: | |||||||||||||||||||||||||
| * | Proposed system narrative | ||||||||||||||||||||||||
| * | Screen make/model and specifications | ||||||||||||||||||||||||
| * | Projector make/model and specifications | ||||||||||||||||||||||||
| * | Lens make/model and throw calculations | ||||||||||||||||||||||||
| * | Proposed projector mounting/protection method | ||||||||||||||||||||||||
| * | Proposed screen mounting/setup method | ||||||||||||||||||||||||
| * | Audio integration method | ||||||||||||||||||||||||
| * | Signal path diagram | ||||||||||||||||||||||||
| * | Control method | ||||||||||||||||||||||||
| * | Electrical requirements | ||||||||||||||||||||||||
| * | Network requirements, if any | ||||||||||||||||||||||||
| * | Assumptions and exclusions | ||||||||||||||||||||||||
* Review and approval of final mounting locations
The City may provide electrical work separately if required. Vendors shall clearly identify
any electrical work needed.
10. Site Visit
A site visit is Strongly Recommended.
Site visit date and time can be scheduled with the IT Director via phone or email.
Vendors are responsible for taking their own measurements and verifying installation
conditions. Failure to attend the site visit does not relieve the vendor from providing a
complete and functional system if awarded.
11. Proposal Submission Requirements
Vendor proposals shall include the following:
11.1 Company Information
* Company name
* Address
* Primary contact
* Phone number
* Email address
* Years in business
* Relevant public-sector or gymnasium/auditorium AV experience
11.2 Technical Proposal
Include:
* Proposed system narrative
* Screen make/model and specifications
* Projector make/model and specifications
* Lens make/model and throw calculations
* Proposed projector mounting/protection method
* Proposed screen mounting/setup method
* Audio integration method
* Signal path diagram
* Control method
* Electrical requirements
* Network requirements, if any
* Assumptions and exclusions

With GovernmentContracts, you can:
Event Name Cherryvale Rest Area Flooring Repair Business Unit Department of Transportation Event
State Government of Kansas
Bid Due: 9/29/2026
Bid Date Status Type Project Title Stage City State 09/24/2026 Bidding Building *
Kansas Department of Administration
Bid Due: 9/24/2026
Bid Date Status Type Project Title Stage City State 09/24/2026 Bidding Building *
Kansas Department of Administration
Bid Due: 9/24/2026
Bid Information Type Request for Proposal Status Issued Number 3121530 (On-Call Telecommunication Installation
University of Kansas
Bid Due: 10/02/2026