| Location: | Puerto Rico |
|---|---|
| Posted: | Oct 30, 2025 |
| Due: | Nov 20, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912QR-26-FtBuchananMicrogrid |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Description:
A market survey is being conducted to determine if there are a reasonable number of interested small business concerns to set this future project aside for them. If your firm is a Small Business, certified HUBZone, 8A, Woman-Owned Small Business or Service-Disabled Veteran Owned Small Business, and you are interested in this project please respond appropriately.
Project Location: Fort Buchanan, Puerto Rico
Project Description:
Develop an installation-level microgrid at Fort Buchanan, comprising four continuous-duty 2 MW diesel generators and a 5 MWh battery energy storage system (BESS). This project is Design/Bid/Build and will integrate a comprehensive microgrid control system, encompassing paralleling switchgear, transformers, transfer switches, circuit breakers, protective relaying, and fiber optic communication connections. To ensure continuous operation of critical systems for 14 days, twelve 12,000-gallon above-ground, ballistic-resistant diesel fuel tanks with a fuel polishing system will be installed. The microgrid will integrate existing large-scale onsite renewable energy generation: a 4.65 MW solar photovoltaic (PV) array and two 275 kW wind turbines. The project scope includes all necessary site work, start-up commissioning, interconnection agreement completion, security assessment & authorization, and all associated costs.
Contract duration is estimated at 1,141 calendar days. The estimated cost range is between $25,000,000 and $100,000,000. NAICS code is 237130. All interested contractors should respond to this survey by email on 20 November 2025 by 2:00 PM Eastern Time.
Responses should include:
a. Projects similar in scope shall include construction of a microgrid demonstrating at least three (3) of the following scope elements:
b. Projects similar in size to this project include:
Construction of projects for new construction diesel generation systems which meets or exceeds the following size elements:
c. Based on the information above, for each project submitted, include:
d. Cybersecurity Maturity Model Certification (CMMC)
5. Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting; they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm’s own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished.
NOTE: Total submittal package shall be no longer than 8 pages. Please only include a narrative of the requested information; additional information will not be reviewed.
Email responses and any questions to henry.c.caldera@usace.army.mil
Please note this is NOT a Request for Proposal and does not constitute any commitment by the Government.
Responses to this sources sought notice will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately from responses to this market survey.
All contractors must be registered in the System for Award Management (www.SAM.gov) prior to award of a contract. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from http://www.SAM.gov. Refer to www.SAM.gov for information formerly found in CCR, EPLS, ORCA and FedReg.
Please begin the registration process immediately in order to avoid delay of the contract award should your firm be selected.
ALERT: You must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated. This requirement now applies to both new and existing entities. Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required before the GSA Federal Service Desk (FSD) will activate the entity's registration.
Effective 29 June 2018, vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation, or the vendor risks no longer being active in SAM.
Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier (known as DUNS). The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM.
To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.SAM.gov).
| Oct 31, 2025 | [Sources Sought (Updated)] Ft. Buchanan Microgrid |
| Nov 17, 2025 | [Sources Sought (Updated)] Ft. Buchanan Microgrid |
| Nov 21, 2025 | [Sources Sought (Updated)] Ft. Buchanan Microgrid |
| Nov 24, 2025 | [Sources Sought (Updated)] Ft. Buchanan Microgrid |
| Nov 25, 2025 | [Sources Sought (Updated)] Ft. Buchanan Microgrid |
| Dec 2, 2025 | [Sources Sought (Updated)] Ft. Buchanan Microgrid |

With GovernmentContracts, you can:
Follow HUBZone vendors for Puerto Rico and USVI Security Systems Maintenance Active Contract
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 6/10/2026
Follow USBR Patillas Dam Seismic Retrofit Design Update and Industry Outreach Active Contract
DEPT OF DEFENSE
Bid Due: 6/11/2026
Follow Sources Sought Notice - Morovis National Cemetery, Phase 1B Active Contract Opportunity
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/10/2026
Follow Pilot Locker Restroom Renovation Active Contract Opportunity Notice ID 31171-25201 Related Notice
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 8/08/2026