6891 Bid CW Drainage Repairs - Phase 1 |
|||||||||||||||||||||
|
|||||||||||||||||||||
Washtenaw Community College 4800 E. Huron River Drive
Purchasing Department - SC Room 326 Ann Arbor, MI 48105-4800
Bid # 6891 CW Drainage Repairs - Phase 1 Phone (734) 677-5231
Bid Issued On: August 7, 2026 Fax (734) 677-5414
Bid Due Date: August 27, 2026 at 2:00 p.m. EDT
INSTRUCTIONS TO BIDDERS
I. General
1.1 Examination and Procurement of Documents
A. Documents may be examined at the following locations Friday, August 7, 2026:
Washtenaw Community College
Office of Facilities Management
Damon Flowers Building
4800 East Huron River Dr.
Ann Arbor, MI 48105
B. Procuring Documents (MAY NOT APPLY)
Electronic documents will be available at the following website:
https://www.wccnet.edu/about/purchasing/bids-rfp.php additional documents may be issued
by the Owner and will posted on the website. Vendor is responsible for ensuring have the
most accurate documents; a site visit is required by Owner.
II. Execution
2.1 Examination of Documents and Site
A. Bidders shall carefully examine the Contract Documents and the construction site to
obtain first-hand knowledge of existing conditions and the demolition and construction
requirements of the documents.
B. Successful bidder will be denied any application for extra payments for conditions which
can be determined by visually examining the site and the Contract Documents.
2.2 Pre-bid Meeting / Site Visit
A. A site visit is required and bids will not be accepted from bidders who have not inspected
the site to obtain first-hand knowledge of existing conditions.
B. A pre-bid meeting will be conducted at the start of the scheduled site visit.
C. Each bidder shall inspect the site and become familiar with existing conditions and
limitations of the site, means of access to the site and to work areas, relationship of
existing and new work, and other conditions which might affect the proper performance
and completion of the work.
D. No allowance will be made after bid opening for cost estimation errors attributable to any
failure to account for existing conditions and/or consider of any and all limitations on or of
this scope of work.
E. Successful bidder will be denied any application for extra payments for conditions which
can be determined by visually examining the site.
F. Bidder's representative shall report to the Owner's Representative and register his name,
phone number, and name of the company, signing in as verification of his site visit.
G. The scheduled site visit is as follows:
Date: August 12, 2026
Time: 9:00 a.m. EDT
Location: Damon Flowers Building, DF120
Washtenaw Community College, Ann Arbor, MI
H. The Owner is not obligated to offer any other times to conduct site visits.
Page 1 of 12
Washtenaw Community College 4800 E. Huron River Drive
Purchasing Department - SC Room 326 Ann Arbor, MI 48105-4800
Bid # 6891 CW Drainage Repairs - Phase 1 Phone (734) 677-5231
Bid Issued On: August 7, 2026 Fax (734) 677-5414
Bid Due Date: August 27, 2026 at 2:00 p.m. EDT
I. Any figured dimensions shown on the Contract Documents are for reference purposes
only. The Contractor is required to verify and confirm all dimension in the field and report
any discrepancies to the Owner's Representative immediately. Contractor's request for
additional payment, additional time, or reconsideration of their bid will be denied if the
claim is based on reliance on the figured dimensions shown on the Contract Documents
only.
2.3 Questions, Interpretations, and Addenda
A. Should any bidder find discrepancies between the site markings and the Construction
Documents, or be in doubt as to their exact meaning, he should notify the Owner at once.
The Owner may then, at his option, issue Addenda clarifying the same to all bidders.
B. The Owner will not be responsible for oral instructions or for the Contractor's
misinterpretations of the Contract Documents.
C. Questions must be directed to Don Harrison, Purchasing Agent at
dharriso1@wccnet.edu. All communication should be directed to the Purchasing
Department. Vendor should NOT contact any department directly with questions. All
questions must be submitted by August 20, 2026 at 2:00 p.m. EDT. All emails must
reference the bid number and title. All questions received by the deadline date will be
answered and posted to the WCC Budget & Purchasing website
https://www.wccnet.edu/about/purchasing/bids-rfp.php by August 25, 2026 at 2:00 p.m.
EDT.
2.4 Bid Security, Bonds, and Insurance
A. A Bid Bond is required in the amount of five percent (5%) of the total bid, minimum, and
shall be enclosed with the Bid Proposal, for all base bids categories in excess of
$50,000.00.
B. Performance Bond and Payment Bond requirements are described in the General and/or
Supplementary Conditions and are one hundred percent (100%) of the total bid,
minimum, for all bids in excess of $50,000.00.
C. Insurance requirements are described in the General and Supplementary Conditions.
2.5 Modification and Withdrawal
A. Proposals may be withdrawn and/or changed any time prior to the bid opening.
B. Proposals may not be withdrawn or changed after the bid opening time and shall be
deemed a firm offer continuing for a minimum of ninety (90) calendar days.
C. Bids received after the time and date of the bid opening will not be considered for
Contract award.
2.6 Receipt of Bids
A. All bids must be received by the WCC Purchasing Department via email pur@wccnet.edu
on or before the date and time as specified. Late bids will not be considered. Telephone
bids will not be accepted. If you have any questions concerning this bid, please do not
hesitate to contact the WCC Purchasing Department. It is the responsibility of the
Contractor to ensure that bids are received at the location stated below on or before the
due date and time.
Page 2 of 12
Washtenaw Community College 4800 E. Huron River Drive
Purchasing Department - SC Room 326 Ann Arbor, MI 48105-4800
Bid # 6891 CW Drainage Repairs - Phase 1 Phone (734) 677-5231
Bid Issued On: August 7, 2026 Fax (734) 677-5414
Bid Due Date: August 27, 2026 at 2:00 p.m. EDT
B. Bids will be received by the Purchasing Department of Washtenaw Community College
until 2:00 p.m. EDT, August 27, 2026. The public opening for Bid 6891 CW Drainage
Repairs will be held electronically via the link below:
Public Opening - Bid 6891 CW Drainage Repairs - Phase 1
08/27/2026 at 2:30 p.m. EDT
Join Zoom Meeting
https://wccnet-
edu.zoom.us/j/84204219922?pwd=tm5m3r6h9puWExqkwz1ysTlJiPjRRH.1
Meeting chat link
https://wccnet-edu.zoom.us/launch/jc/84204219922
Meeting ID: 842 0421 9922
Passcode: 136566
C. Contractor shall complete, sign, and submit the Bid Proposal Form and Washtenaw
Community College Contractor Responsibility Form as a condition of Contract award.
2.7 Codes, Ordinances, Regulations, Etc.
A. All labor and materials shall be furnished and installed in strict accordance with the latest
to-bid-date applicable codes, ordinances, and regulations of any and all governing bodies
that have jurisdiction over this project.
B. If the quality of the labor and materials required by the Drawings and Project Manual
exceeds the requirements of the applicable codes, ordinances, and regulations, the
Drawings and Project Manual shall take precedence.
C. If the quality of the labor and materials required by the applicable codes, ordinances, and
regulations exceed the requirements of the Drawings and Project Manual, then the
applicable codes, ordinances, regulations, etc. shall take precedence.
2.8 Subcontractors and Material Suppliers
A. The successful bidder shall submit to the Owner within 24 hours after Notice of Award, a
complete and final list of all sub-contractors, all material suppliers, and all
superintendents (general construction and principal sub-contractors) he proposes to
engage on the work. Subcontracts and material contracts shall not be awarded unless
and until they have been approved by the Owner. Superintendents (primary contractors
and principal sub-contractors) shall not be changed during the construction on this project
without the Owner's prior approval in writing.
B. Names of proposed principal sub-contractors must be listed on the Bid Proposal Form.
2.9 Award of Contract
A. Material proposals to be used for the completion of work, the competency, solvency,
reputation, and responsibility of the bidders, start/completion/duration times, and other
issues deemed relevant by the Owner and the Engineer will be considered. All
responsible bidders will receive due consideration before the awarding of this contract.
B. In the reception of proposals for the Work, the Owner incurs no obligation to accept the
lowest priced proposal.
C. The right to accept or reject any and all bids is reserved by the Owner.
Page 3 of 12
Washtenaw Community College 4800 E. Huron River Drive
Purchasing Department - SC Room 326 Ann Arbor, MI 48105-4800
Bid # 6891 CW Drainage Repairs - Phase 1 Phone (734) 677-5231
Bid Issued On: August 7, 2026 Fax (734) 677-5414
Bid Due Date: August 27, 2026 at 2:00 p.m. EDT
D. The Owner reserves the right to require testimony or legal documents pertaining to the
qualifications of a Contractor.
E. If applicable, the Owner may award to multiple vendors if it is the best interest of the
College.
III. Requirements
3.1 Proof of Insurance - Vendor shall refer to Attachment B - General Conditions Article 11:
Insurance for requirements.
3.2 Contract Terms and Conditions - The awarded vendor will be required to sign a standard
contract for the work to be performed per this bid. Sample contract is included as a substantive
part of the 6887 Bid documents (Attachment A - Small Project Construction Contract).
IV. Bid Scope
4.1 All work shall adhere to all specifications as outlined in the Contract Documents and Bid
Drawings. This project is scheduled to begin September 15, 2026 with a date of final
completion on or before November 15, 2026.
4.2 The work of this bid category includes but is not limited to providing all labor, equipment,
materials, scaffolding, hoisting and incidentals to complete the Campus Wide Drainage Repairs
Part 1 in accordance with the specifications, drawings and applicable codes. All work is to be
performed as shown on the plans and specified herein.
THE SCOPE OF WORK IS TO INCLUDE, but is not limited to, the following items:
A. Contractor to manage and coordinate with all trades necessary to complete the work per
Drawings and Specifications.
B. Coordinate all work for proper fit, location and clearance of piping, ductwork, equipment
and accessories to ensure timely completion of work.
C. The construction schedule for this contract will be phased based on the following timelines:
Construction start 9/15/26. Project Completion will be 11/15/26.
D. Secure and pay for all required permits, licenses, inspections, approvals, and fees for the
work.
E. Contractor to provide its own equipment and tools necessary to complete this contract.
F. Contractor to field verifies all dimensions and verifies quantity's need for this project.
G. Furnish and install all supports for this contractor's equipment, piping, and duct work.
H. Furnishing and installation of all pipe identification markers, tags, schedules, nameplates
to identify ducts, pipes and mechanical equipment.
I. Contractor to coordinate with WCC on timing and impacts to building. Contractor to include
any premium time or off shift work required to complete system shutdowns and isolations.
J. Restrooms in adjacent facilities will be available.
Page 4 of 12
Washtenaw Community College 4800 E. Huron River Drive
Purchasing Department - SC Room 326 Ann Arbor, MI 48105-4800
Bid # 6891 CW Drainage Repairs - Phase 1 Phone (734) 677-5231
Bid Issued On: August 7, 2026 Fax (734) 677-5414
Bid Due Date: August 27, 2026 at 2:00 p.m. EDT
K. Seal all wall penetrations as needed, firestopping as required.
L. Contractor is responsible for total removal and disposal of all waste generated from
construction activities. WCC expectation is that contractor will attempt to separate and
recycle as much as possible. Contractor to provide dumpster for project; Do not use
WCC Dumpster near jobsite.
M. Coordinate any disconnects required with all other trades and College for demolition.
N. Contractor to provide protection and daily cleanup of work space and routes in and out of
the work zones.
O. Contractor to provide startup support, testing and assistance for any new equipment.
P. Contractor will be responsible for ensuring work is completed per drawings and
specifications.
SPECIAL CONSIDERATIONS:
A. Contractor shall be aware of the milestone schedule durations for this project. The
contractor shall provide a schedule/workplan on obtaining the necessary permits,
materials, and procurement of long-lead items, to begin work and complete the work as
scheduled for review by the Owner.
B. WCC requests that this bid includes a mandatory Contingency Allowance. This amount
will be used for potential changes or added scope and will be dictated for use by WCC.
Remaining amounts will be returned at job close-out. See Project Designer's
Specifications/Project manual document section 01 2100.
C. Contractor shall maintain free access for traffic around project site on campus drive;
including bus route traffic and access to adjacent building service drives and loading docks.
D. Provide barricades, fencing required and signage to maintain required safety regulations
as defined by OSHA.
E. Coordinate and adhere to all state and local building codes relative to this contractor's
work. This contractor is to obtain and pay for all special permits associated with the work.
F. All identifiable trash or debris is to be cleaned up by the trade contractor who created it on
a daily basis.
G. This contractor MUST comply with MI-OSHA requirements for this work. This will be closely
monitored.
H. Contractor and all its sub-contractors are to observe the College's no smoking policy.
7. Vehicles to be parked in parking lots Lot # 4. Unloading areas for tools and materials will
be available at the building on a temporary basis.
Page 5 of 12
Washtenaw Community College 4800 E. Huron River Drive
Purchasing Department - SC Room 326 Ann Arbor, MI 48105-4800
Bid # 6891 CW Drainage Repairs - Phase 1 Phone (734) 677-5231
Bid Issued On: August 7, 2026 Fax (734) 677-5414
Bid Due Date: August 27, 2026 at 2:00 p.m. EDT
V. Bid Specifications
Vendor shall comply with bid documents including Construction Contract, General Conditions, Bid
Drawings, Instructions to Bidders, and all Addenda issued prior to bid opening.
List of attachments:
Bid 6891 - Attachment A - Sample Small Project Construction Contract
Bid 6891 - Attachment B - General Conditions
Bid 6891 - Attachment C - Drawings
Bid 6891 - Attachment D - Specifications
Bid 6891 - Attachment E - Prevailing Wage Rate Schedule
Page 6 of 12
Washtenaw Community College 4800 E. Huron River Drive
Purchasing Department - SC Room 326 Ann Arbor, MI 48105-4800
Bid # 6891 CW Drainage Repairs - Phase 1 Phone (734) 677-5231
Bid Issued On: August 7, 2026 Fax (734) 677-5414
Bid Due Date: August 27, 2026 at 2:00 p.m. EDT
BID PROPOSAL FORM
To the Owner:
The Undersigned has received and examined the Contract Documents and all conditions regarding the
project, and having visited and inspected the site of the project, hereby proposes:
1. To hold my bid open for a minimum period of ninety (90) calendar days.
2. To enter into and execute a contract, if awarded to me on the basis of this proposal.
3. To accomplish the work in accordance with all the Contract Documents.
4. To complete the work by the time stipulated in this Bid Proposal Form and under the
conditions as outlined in the Construction Documents.
5. To accept the provisions of the Instructions to Bidders regarding disposition of Bid Security.
A. ADDENDA:Receipt of the following Addenda are acknowledged and incorporated into this Bid
Proposal. (If none were issued, mark "N/A" for "not applicable." If additional space is needed, list
at the end of the Bid Proposal Form.)
______ _____________________________
No. Name of Addendum
______ _____________________________
No. Name of Addendum
B. BASE BID: Proposal to furnish all labor, material, equipment and services necessary to complete
the work, including all addenda, for the amount as follows:
Labor....................................................................................... $___________ ___
Materials.................................................................................. $
Grand Total............................................................................... $________ __________
(Total dollar amount written in words)
C. VOLUNTARY ALTERNATE (If none, mark "N/A," no applicable. If additional alternates are
proposed, bidder is to use this format and list them at the end of the Proposal Form.):
Alternate No. { }:
(dollar amount (+ or - to Base Bid) written in words)
$
(dollar amount (+ or - to Base Bid) written in figures)
Page 7 of 12
| 1 | SAW CUT HMA | LFT | |
|---|---|---|---|
| 2 | SAW CUT CONCRETE CURB & GUTTER | LFT | |
| 3 | REMOVE HMA PAVEMENT | SFT | |
| 4 | REMOVE CONCRETE CURB & GUTTER | LFT | |
| 5 | REMOVE & REINSTALL BOLLARD | EA | |
| 6 | CONCRETE APRON | SFT | |
| 7 | 6" SDR26 SEWER | LFT | |
| 8 | 4" SDR26 SEWER LINE | LFT | |
| 9 | SPILL OUT CURB & GUTTER | LFT | |
| 10 | 5" HMA PAVEMENT SECTION | CYD | |
| 11 | DRAINAGE CURB CUT | EA | |
| 12 | 4' DRAINAGE SWALE | SYD | |
| 13 | CLEAN AND TV 8" SEWER LINE | LS | |
| 14 | TUCK POINT & WATER PROOF EXISTING STRUCTURE | EA | |
| 15 | EROSION CONTROL | LS | |
| 16 | FINAL CLEANUP | LS | |
| 17 | TRAFFIC CONTROL | LS |
Washtenaw Community College 4800 E. Huron River Drive
Purchasing Department - SC Room 326 Ann Arbor, MI 48105-4800
Bid # 6891 CW Drainage Repairs - Phase 1 Phone (734) 677-5231
Bid Issued On: August 7, 2026 Fax (734) 677-5414
Bid Due Date: August 27, 2026 at 2:00 p.m. EDT
D. UNIT PRICES (If requested, this section must be completed and prices are as installed):
ITEM ITEM DESCRIPTION UNIT UNIT COST
1 SAW CUT HMA LFT
2 SAW CUT CONCRETE CURB & GUTTER LFT
3 REMOVE HMA PAVEMENT SFT
4 REMOVE CONCRETE CURB & GUTTER LFT
5 REMOVE & REINSTALL BOLLARD EA
6 CONCRETE APRON SFT
7 6" SDR26 SEWER LFT
8 4" SDR26 SEWER LINE LFT
9 SPILL OUT CURB & GUTTER LFT
10 5" HMA PAVEMENT SECTION CYD
11 DRAINAGE CURB CUT EA
12 4' DRAINAGE SWALE SYD
13 CLEAN AND TV 8" SEWER LINE LS
TUCK POINT & WATER PROOF EXISTING
14 STRUCTURE EA
15 EROSION CONTROL LS
16 FINAL CLEANUP LS
17 TRAFFIC CONTROL LS
E. OBLIGATIONS: Upon notification of the acceptance of the Bid Proposal, the Undersigned
agrees to execute a contract for the above work, for the above-stated compensation.
F. CONTRACTOR QUALIFICATIONS: The Owner will consider the qualification and experience
of the Contractor, the amount of the bid, the completion date, and other factors deemed relevant
in determining the award of the contract.
G. PRINCIPAL SUB-CONTRACTORS: I propose to use the following sub-contractors in the
performance of the Work which is the subject of this Bid: (If there are none, mark "N/A," Not
Applicable. If more space is needed, continue listing at the end of the Bid Form.)
Contractor/Company Name Type of Business
Contractor/Company Name Type of Business
H. EXCEPTIONS: Please list and exceptions to the bid, including time frame, contract language,
specifications. (Note exceptions will be reviewed and excepted at the Owners discretion)
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
Page 8 of 12
Washtenaw Community College 4800 E. Huron River Drive
Purchasing Department - SC Room 326 Ann Arbor, MI 48105-4800
Bid # 6891 CW Drainage Repairs - Phase 1 Phone (734) 677-5231
Bid Issued On: August 7, 2026 Fax (734) 677-5414
Bid Due Date: August 27, 2026 at 2:00 p.m. EDT
The Undersigned hereby agrees:
1. That all the Work and improvements as specified in the Contract Documents will begin on
September 15, 2026 and shall be completed on or before November 15, 2026.
2. That the time of completion is an essential part of this Bid and will be made a part of the Contract of
the successful Bidder.
Submitted by:
Name of Bidder
Address of Bidding Company
Address of Bidding Company
Phone No.
Fax No.
By:
Its:
(SEAL)
(if bid is by a corporation not in
the State of Michigan)
Page 9 of 12
Washtenaw Community College 4800 E. Huron River Drive
Purchasing Department - SC Room 326 Ann Arbor, MI 48105-4800
Bid # 6891 CW Drainage Repairs - Phase 1 Phone (734) 677-5231
Bid Issued On: August 7, 2026 Fax (734) 677-5414
Bid Due Date: August 27, 2026 at 2:00 p.m. EDT
Washtenaw Community College Contractor Responsibility Form
Firm: ______________________________
______________________________
______________________________
______________________________
(Insert name, address and telephone number of firm submitting certification)
Project Name: CW Drainage Repairs - Phase 1
Type of Work/Project: Small construction project
Bid/RFQ/RFP Number: Bid 6891
As a condition of performing work on a contract for Washtenaw Community College, a
contractor submitting a bid shall complete this form with the responsible contractor qualification
standards set forth below. Bids will not be accepted unless they are accompanied by a completed
copy of this form. The form is required for all bona fide solicited contracts greater than or equal to
$20,000. Washtenaw Community College will use this form and the items noted below in
consideration of awarding the bid for the project identified above.
This form must be completed by an employee or other person representing the submitting
firm who has the authority to execute this form and has adequate knowledge to address all matters
specified herein. The person completing this form shall answer each question and execute the
signature requirement at the end of this form in the presence of a notary. If this form has already
been completed and submitted by a responding contractor for a previous bid or contract, it shall
be valid for a period of no longer than two years from the date of receipt.
Contractor Qualification Standards
(1) Does the firm meet the bonding requirements for the contract, as required by applicable law
or contract specifications and any insurance requirements, as required by applicable law or
contract specifications, including general liability insurance, workers compensation
insurance and unemployment insurance?
YES_____ NO_______
(2) Has the firm been debarred or suspended by any federal, state or local government agency
or authority in the past three years?
YES_____ NO_______
(3) Has the firm defaulted on any contract in the past three years?
YES_____ NO_______
(4) Has the firm had any type of business, contracting or trade license, registration, or other
certification revoked or suspended in the past three years?
YES_____ NO_______
Page 10 of 12

With GovernmentContracts, you can:
Follow Solicitation: W912CH-26-B-0006 Nozzle, Fuel, Oil; NSN: 4930-01-440-1085 - AMENDED Active Contract Opportunity
Federal Agency
Bid Due: 6/29/2029
Follow BROAD AGENCY ANNOUNCEMENT U.S. ARMY COMBAT CAPABILITIES DEVELOPMENT COMMAND GROUND VEHICLE SYSTEM
DEPT OF DEFENSE
Bid Due: 12/31/2026
Follow Tetrate Istio Software Licenses Active Contract Opportunity Notice ID SP470126Q0211 Related Notice
DEPT OF DEFENSE
Bid Due: 9/10/2026
Follow LLRC, Engine ASSY, M Active Contract Opportunity Notice ID SPRDL1-26-R-0121 Related Notice
DEPT OF DEFENSE
Bid Due: 9/21/2026