| Location: | California |
|---|---|
| Posted: | Sep 10, 2025 |
| Due: | Sep 30, 2025 |
| Agency: | UCLA Capital Programs |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 943719.01 |
| Publication URL: | To access bid details, please log in. |
| Project Name | UCLA Westwood Center Suite 300 Reconfiguration |
| Project Number | 943719.01 |
| Project Description |
Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a lump sum contract are invited for the following work:
The scope of work is to reconfigure and renovate Suites 300, 315, 320, and 330, totaling approximately 6,520 gsf (6,264 asf), on the third floor of the UCLA Westwood Center to consolidate them into a single larger suite to be occupied by UCLA Health Planning, Design, and Construction team. The renovated space would provide open-office space, a private office, four restrooms, a breakroom, four booths, three conference rooms, a storage room, a plotter room, and a materials library. The UCLA Westwood Center, located at 924 Westwood Blvd is a 292,867 gsf (121,093 asf) 11-story building, with three basement levels and a mezzanine floor, constructed in 1972. The existing telecommunication room and Suite 350 would remain as-is. The proposed scope of work includes interior demolition; installation of new partitions, ceilings, and flooring; new interior finishes; and modifications to mechanical, electrical, and plumbing systems to support the new program. Asbestos-containing materials is present and would be abated prior to construction. Prime Contractor to select Abatement Contractor. Krieger Environmental to oversee all abatement work by University Representative. All work to be performed after-hours. The estimated construction cost is $2,955,000.00. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (PREQUALIFICATION DOCUMENTS IF ANY; BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS, IF ANY, ETC.), CLICK HERE: UCLA ONLINE PLANROOM |
| Estimated Construction Cost | $2,955,000.00 |
| 7723837 |

With GovernmentContracts, you can:
...Solicitation Number: RFB-IS-26200891 Title: 15757P-BRAND SPECIFIC-SETINA PARTITION,HARDSEAT... SPECIFIC-SETINA PARTITION,HARDSEAT, WINDOW PKG 15757P-BRAND SPECIFIC-SETINA ...
Los Angeles County
Bid Due: 6/04/2026
...RFB-IS-26200891 - 15757P-BRAND SPECIFIC-SETINA PARTITION,HARDSEAT, WINDOW PKG - Closing: 6/4/2026... SPECIFIC-SETINA PARTITION,HARDSEAT, WINDOW ...
City of Los Angeles
Bid Due: 6/04/2026
..., Partition, Shelving, and Locker Manufacturing Place of Performance: Edwards , CA 93524 ...
DEPT OF DEFENSE
Bid Due: 6/05/2026
...includes new finishes, partitions, accessories, and related modifications required to complete a modern...
City of Benicia
Bid Due: 6/30/2026