| Location: | California |
|---|---|
| Posted: | Sep 10, 2025 |
| Due: | Sep 19, 2025 |
| Agency: | UCLA Capital Programs |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 907511.01 |
| Publication URL: | To access bid details, please log in. |
| Project Name | MP200 2nd Floor Oncology Improvements (BP 4 – Struct and Mis Steel) PREQUALIFICATION |
| Project Number | 907511.01 |
| Project Description | Suffolk Construction Company., Inc. dba Suffolk-Roel, the CM at Risk Contractor on this UCLA project, seeks prequalification submittals from Structural and Miscellaneous Steel subcontractor bidders. Refer to the attached PDF Advertisement and follow the instructions therein. |
| Estimated Construction Cost | $560,644.00 |
| 907511.01 |

With GovernmentContracts, you can:
...MISCELLANEOUS ELECTRONIC EQUIPMENT (NOT FOR TESTING OR ANALYZING -SEE 730) NIGP 29500 ELEVATORS ...
San Diego County Water Authority
Bid Due: 10/01/2026
..., and Repair (Metal) NIGP 99255 Miscellaneous Testing and Calibration Services NIGP 91023 ...
San Diego County Water Authority
Bid Due: 9/30/2026
...Installation, Maintenance, and Repair (Metal) NIGP 99255 Miscellaneous Testing and Calibration Services NIGP..., ...
San Diego County Water Authority
Bid Due: 9/29/2026
...MISCELLANEOUS ELECTRONIC EQUIPMENT (NOT FOR TESTING OR ANALYZING -SEE 730) NIGP 29500 ELEVATORS ...
San Diego County Water Authority
Bid Due: 9/29/2026