HARNETT COUNTY SCHOOLS
LILLINGTON, NC 27546
REQUEST FOR QUALIFICATIONS
FOR SITE ASSESSMENT SERVICES
CTE High School
RFQ-2025-18
QUALIFICATION PROPOSALS DUE January 7, 2026, NO LATER THAN 2:00 P.M.
SUBMIT VIA EMAIL, DELIVERY SERVICE, OR HAND DELIVER TO:
HARNETT COUNTY SCHOOLS PURCHASING DEPARTMENT
ATTN: GARLAND MCDOWELL
DIRECTOR OF PURCHASING
125 ALEXANDER DR.
LILLINGTON, NC 27546
Introduction
Harnett County Schools (HCS) is soliciting Statements of Qualifications (SOQs) from qualified Site
Assessment firms to provide Site Assessment Services for a new CTE High School facility. HCS intends to
use the Construction Manager at Risk (CMAR) delivery method. This solicitation is for Site Assessment-
only services; the selected firm will not participate in the construction execution plan.
This solicitation is being conducted in accordance with the Mini‑Brooks Act (N.C.G.S. §143‑64.31), which
requires that contracting for architectural, engineering, and other professional design services be based on
demonstrated competence and qualification without regard to fee.
Project Description
Harnett County Schools plans to design and construct a new CTE High School in Harnett County (Location
TBD). The new facility will accommodate approximately 500 students and will include classrooms,
administrative offices, media center, cafeteria, gymnasium, athletic fields, and associated site work.
The project must be designed in accordance with applicable North Carolina Department of Public
Instruction (DPI) guidelines, North Carolina Building Code, and all other applicable federal, state, and local
requirements.
Scope of Services
The selected Site Assessment Consultant will provide comprehensive site assessment services to support the
planning, design, and construction of the new CTE High School facility. These services shall include, but
are not limited to, the following:
• Perform detailed boundary and topographic surveys of the proposed site, including
property lines, easements, right-of-way, existing features, and elevation data necessary
for design development.
• Conduct Phase I Environmental Site Assessments (ESA) in accordance with ASTM
standards. If recommended, perform Phase II assessments including soil and groundwater
sampling and analysis to identify any potential environmental concerns.
• Analyze existing and proposed stormwater drainage conditions, including watershed
delineation, runoff calculations, preliminary design recommendations, and regulatory
compliance guidance related to stormwater permitting.
• Identify, locate, and map all existing public and private utilities on or near the site.
Coordinate with applicable utility providers to verify capacity, connection points, and
service availability for water, sewer, electric, gas, and telecommunications.
• Perform traffic engineering studies, including current and projected traffic volumes,
intersection analysis, queue length modeling, and recommendations for improvements to
support safe and efficient site access and circulation.
• Conduct geotechnical borings and soil testing to determine subsurface conditions.
Provide a comprehensive geotechnical report outlining soil classifications, groundwater
conditions, bearing capacity, and recommendations for foundations, pavements, and other
site features.
• The selected site assessment consultant shall coordinate closely with the Owner’s
selected Design Consultant and Construction Manager at Risk (CMAR) throughout all
RFQ-2025-18 Site Assessment Services CTE High School
2
phases of the assessment process. Collaboration shall include, but is not limited to, data
sharing, participation in design and planning meetings, aligning site evaluations with
design intent, and providing timely input to support cost estimating, value engineering,
and construction logistics.
Additional services may be required as necessary to meet the permitting and design needs of the
project. The consultant will work in close coordination with the Owner and the full project team to
ensure timely and accurate delivery of all required assessment data.
RFQ Response Timeline
Issue RFQ
Deadline for Questions
Addenda Answering Questions
Deadline for Qualification Submission
Review of Proposals and Create Shortlist
Evaluates of Select Qualified Firms
Approval of firms and Begins Negotiations
December 15, 2025
December 29, 2025 by 2:00 PM
December 30, 2025
January 7, 2026 by 2:00 PM
January 8, 2026
January 9, 2026
January 2026 (TBD)
I. QUALIFICATIONS
Relevant Experience
• Minimum experience of five (5) years in the successful study, design, permitting,
construction documentation, bidding, and construction oversight of school buildings and
any other applicable project type of a similar size, scale, and scope as the proposed project
outlined in this RFQ.
• Extensive experience with Town, County, and State permitting processes, requirements, and timelines.
Knowledge of Relevant Codes
• Knowledge of, and experience in, the legal and administrative requirements, procedures, and practices
related to the study, design, funding, permitting, and construction of public facilities, including all
state and local codes, ordinances, statutes, and regulations.
Professional Registration
• Possession of all necessary current licenses and registrations, either within the firm or through
independent consultants, to qualify under North Carolina law to perform the services as outlined in
the previous sections of this RFQ
Resumes and statements of qualifications for supplemental service consultants are not required as part of this
proposal, however, providing a list of firms the Consultant would engage to perform supplemental services is
recommended. Harnett County Schools reserves the right to reject any firm listed or proposed to be engaged with
during the project.
RFQ-2025-18 Site Assessment Services CTE High School
3
Statement of Qualifications will be evaluated based on the collective experience and qualifications of the
Consultant and their subconsultants. Submitting a project team composition that differs from the suggested
list above will not be considered grounds for disqualification. Harnett County Schools is relying on the
Consultant’s knowledge and expertise to assemble an experienced and effective consultant team to execute
the scope of work and deliver the project to a high quality.
II. FORMAT REQUIREMENTS
Succinct Statements are advised. The following information must be included in all applications. Information
should be grouped into three sections, in the order listed below:
Section 1: Project Understanding (5 Pages Maximum)
Provide a narrative describing the proposed project and any necessary or pertinent background information.
Discuss the Consultant’s understanding of the project and approach to the successful completion of the scope
of services outlined in this RFQ and provide a proposed work schedule to accomplish all tasks. If applicable,
identify the staff roles that would be assigned to each major task, including subconsultants.
As necessary, please include any photographs, renderings, sample projects, or other visual images that will
clarify your approach or provide contextual background. Provide captions as needed to demonstrate
applicability to this project.
Section 2: Qualifications and Experience
This section should include the following information:
a. Description of the Consultant, including a statement of the Consultant's qualifications for providing
the scope of services. This project requires successful prior experience in stakeholder engagement,
public or private school design, universally accessible/inclusive design, construction methods and
detailing, construction observation, and knowledge of local codes, ordinances, and permitting
requirements.
b. Current one-page resumes for each team member, including qualifications and experience, length of
time and role with the company.
c. Five to ten images of relevant past projects. Images should be clearly labeled. A brief narrative
describing each project must include: project title, date completed, consultant role in the project,
location and size, cost, and client contact information.
d. Qualifications/experience of each intended sub-consultant or sub-contractor.
Section 3: Firm Availability and References
This section should include the following information:
a. List of current ongoing projects. Include: Project start date; expected completion date, total project
cost, your ability to devote staff resources to complete this project.
b. Three professional project references, with complete business address, phone numbers, and email
addresses.
"All sections combined, Submissions must not exceed 25 pages, excluding the cover letter."
RFQ-2025-18 Site Assessment Services CTE High School
4
III. SELECTION PROCESS
Responsive submittals will be reviewed and screened by the Harnett County Schools Evaluation Committee.
Statements will be evaluated according to the criteria listed below. If deemed necessary by the Evaluation
Team, Consultants submitting the highest rated proposals may be invited for interviews. However, Harnett
County Schools reserves the right to award the contract without performing formal interviews.
Evaluation Criteria
All submittals will be evaluated using the following scoring criteria. The scoring system is intended to assist
Harnett County Schools in organizing and ranking the Statements received for consideration. However,
Harnett County Schools is under no obligation to select the highest-ranking proposal or any other proposal
not deemed to be, in the opinion of Harnett County Schools, the most advantageous to successfully
completing the project.
1. Project Approach (40 points)
Statements will be scored based on the Consultants’ ability to demonstrate an understanding of the project
goals, complexities, opportunities, challenges, constraints, and schedule. Successful proposals will outline
an approach that responds directly to these project factors and provides a high likelihood of project
success.
2. Qualifications, Experience, and Performance History (35 points)
Statements will be scored based on the relevant experience, background, and project history. Successful
proposals will demonstrate a breadth of experience in designing public school construction projects.
3. Availability and References (25 points)
Statements will be scored based on the availability of firm to meet proposed schedule and references of
the individual or team members, including subconsultants.
Submission Deadlines & Delivery
Responses must be received no later than:
2:00 PM (EST) on Wednesday, January 7, 2026
Submit via:
Email Garland McDowell to: gmcdowell@harnett.k12.nc.us
OR hard copy (1 original + 2 copies) including one digital copy on a labeled flash drive to:
Garland McDowell
Director of Purchasing
RFQ-2025-18 Site Assessment Services CTE High School
Harnett County Schools
125 Alexander Dr.
Lillington, NC 27546
RFQ-2025-18 Site Assessment Services CTE High School
5
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.