25031R0298/Purchase Installation of Generac Generators in Gr
| Location: |
Alabama |
| Posted: |
Feb 24, 2025 |
| Due: |
Feb 27, 2025 |
| Agency: |
State Government of Alabama |
| Type of Government: |
State & Local |
| Category: |
- 61 - Electric Wire, and Power and Distribution Equipment
- 71 - Furniture
- N - Installation of Equipment
|
| Solicitation No: |
SRC0000027316 |
| Publication URL: |
To access bid details, please log in. |
|
Sourcing Project Number:
|
SRC0000027316
|
|
Solicitation Label:
|
25031R0298/Purchase Installation of Generac Generators in Gr
|
|
Status:
|
Open for Bidding
|
|
Due / Close Date:
|
2/27/2025
|
|
Main Commodity:
|
Generators, Stationary Type, Not Automotive
|
|
Solicitation Type:
|
Quick Quote
|
|
Buying Agency:
|
Information Technology General
|
|
Sourcing Responsible First Name:
|
Tina
|
|
Sourcing Responsible Last Name:
|
Short
|
Solicitation General Information
|
|
|
Solicitation Name
25031R0298/Purchase Installation of Generac Generators in Gr
|
|
Round #
Rounds are used to issue amendments and could be used to continue a solicitation with a “short-listed” set of suppliers.
1
|
|
Begin
2/25/2025 1:22:42 AM (UTC+9)
|
Award Status
|
End
2/28/2025 8:00:00 AM (UTC+9)
|
|
Public Bid Opening Date
(M/d/yyyy)
|
|
Summary
Alabama Emergency Management Agency Project Title: Purchase Installation of Generac Generators in Greenville, Alabama to support Emergency Alert System.
Project Scope:
This specification outlines the installation of two Generac generators at two different locations in Greenville, Alabama. The project will include the installation of a 20kW 3-Phase Generac Generator with a 200A Transfer Switch at the station on Commerce Street and a 22kW Single-Phase Generac Generator with a Transfer Switch at the tower site on Airport Road.
1. Location:
• Commerce Street Station – 205 West Commerce St. Greenville, Alabama 36037
• Tower Site – 5047 Airport Road Greenville, Alabama 36037
2. Equipment Specifications:
2.1 20kW 3-Phase Generac Generator with 200A Transfer Switch (Commerce Street Station)
• Unit Description: The 20kW 3-phase Generac generator is designed to provide reliable backup power to the station on Commerce Street. The unit will operate on natural gas
• Key Features:
o Generator Power: 20kW, 3-phase
o Transfer Switch: 200A Automatic Transfer Switch
• Quantity: 1 unit
• Materials:
o Generac 20kW 3-phase Generator
o 200A Transfer Switch
o Necessary piping and wiring components for natural gas installation
2.2 22kW Single-Phase Generac Generator with Transfer Switch (Airport Road Tower Site)
• Unit Description: The 22kW single-phase Generac generator will be installed at the tower site on Airport
Road. It will provide reliable backup power for the tower site, including a dedicated Transfer Switch to manage the electrical load. • Installation Details:
o The generator will be installed at the opposite end of the building from the main service.
o Conduit will run down the back wall to protect the generator power and control wires.
o The Transfer Switch will be mounted next to the meter can and piped into the existing panel inside the building.
• Key Features:
o Generator Power: 22kW, Single-phase
o Transfer Switch: Compatible with the 22kW generator
o Mounting Pad: To be provided as part of the installation
• Quantity: 1 unit
• Materials:
o Generac 22kW Single-Phase Generator
o Transfer Switch
o Mounting pad for generator installation
o Conduit and wiring for proper installation
o Piping for integration with the existing panel
3. Installation Requirements: The winning bidder is to provide all parts, materials, and labor for installation. The winning bidder to deliver both generators to the provided addresses
3.1 Main Street Station (20kW 3-Phase Generator)
• Site Preparation: Prepare the location at the Main Street station for the placement and installation of the generator, ensuring proper clearance and safety measures.
• Electrical Installation:
o Install and connect the 200A Transfer Switch to the Main Service panel.
o Ensure that proper wiring and conduit are installed to meet safety codes.
• Gas Line Connection:
o Install a dedicated natural gas line to supply the generator.
• Testing and Commissioning: Perform system tests to verify proper operation of the generator, Transfer Switch, and all related electrical systems.
3.2 Airport Road Tower Site (22kW Single-Phase Generator)
• Site Preparation: Prepare the tower site for generator installation, ensuring appropriate clearance and a solid foundation for the mounting pad.
• Electrical Installation:
o Run conduit down the back wall from the generator to the Transfer Switch.
o Mount the Transfer Switch next to the meter can and wire it into the existing electrical panel.
• Testing and Commissioning: Perform system tests to verify proper operation of the generator, Transfer Switch, and electrical integration.
4. Compliance and Standards:
All work will be performed in accordance with the National Electrical Code (NEC), local regulations, and manufacturer guidelines. Proper permits and inspections will be coordinated with the appropriate local authorities.
Any questions please contact Jeff Green at 205-415-7288 or e-mail him @ jeff.green@ema.alabama.gov
|
|
|
Additional Information
|
|
|
Documentation
|
Type
|
Att.
|
Validity End Date
|
Version
|
|
Quick Quote Standard Boilerplate updated 12-18-24
|
RFx Commercial Document (Approved)
|
|
|
|
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.