| Location: | Michigan |
|---|---|
| Posted: | Jun 26, 2025 |
| Due: | Jul 10, 2025 |
| Agency: | City of Kalamazoo |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Closing date
July 10, 2025, 04:30 PM
92567-007.0-bid document (PDF, 334KB)
215 W Stockbridge Central Pump Station Office HVAC System Specifications:
Office Room
• Provide and install a 3-Ton P-Series Mitsubishi Cooling Only System for the server room.
• Provide and install a 3-Ton P-Series Wall mount evaporator serving the server room.
• Provide and install a 3-Ton P-Series Mitsubishi Outdoor unit on the wall outside in the fenced area.
• Provide and install a wired remote for control of the server room.
• Provide and install a condensate pump below the wall mount unit to pump condensate to the existing condensate drain line above ceiling.
• Provide and install a wall mount bracket for the new outdoor unit.
• Provide and install line hide to hide the new line set down the outside wall.
• Provide and install line volt electrical for units and condensate removal systems .
• Perform start-up and checkout of all elements.
• Warranty all elements provided for one year after installation.
IT Server Room
• Provide and install a 3-Ton P- Series Mitsubishi Heat Pump System for the control room.
• Provide and install a 3-Ton P-Series Mitsubishi ceiling cassette evaporator.
• Provide and install a 3-Ton P-Series Mitsubishi Heat Pump Outdoor unit on the wall outside in the fenced area.
• Provide and install a wired remote for control of the control room.
• Provide and install condensate pump as needed for condensate removal to the existing condensate drain.
• Provide and install line hide to hide the new line set down the outside wall.
• Provide and install line volt electrical for units and condensate removal systems.
• Perform start-up and checkout of all elements.
• Warranty all elements provided for one year after installation.

With GovernmentContracts, you can: