| Location: | Washington |
|---|---|
| Posted: | Mar 11, 2026 |
| Due: | Mar 18, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W50S9E26QA001 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
This is a service contract to install (Energy Management And Control Systems) EMCS at Bldg 140 the ASOG complex at Camp Murray, WA. There will be a site visit on Camp Murray WA on 03 Mar 2026 at 1000.
For base access please complete https://dbids-global-enroll.dmdc.mil/preenrollui/#/landing-page and see https://dbids-global-enroll.dmdc.mil/preenrollui/#/landing-page . Contact 194.wg.fal.msc.contracting@us.af.mil for base access questions. Please note an update is forthcoming to include the HVAC asbuilts for the Bldg.
On 26 Feb 2026 this was modified to include the drawings and the brand name J&A for Siemens parts and service to update the Bldgs. EMCS controls and incorporate the Bldg. into our base Siemens controls.
Ammend 1 - update offers due date from 11 March 2026 to 18 March 2026. Add document "Camp Murray ASOG - Type B-3 - Volume 1 Drawings (Half Sized).
| Feb 23, 2026 | [Combined Synopsis/Solicitation (Original)] ASOG Complex EMCS Camp Murray, WA |
| Mar 2, 2026 | [Combined Synopsis/Solicitation (Updated)] ASOG Complex EMCS Camp Murray, WA |
| Mar 11, 2026 | [Combined Synopsis/Solicitation (Updated)] ASOG Complex EMCS Camp Murray, WA |
| Mar 16, 2026 | [Combined Synopsis/Solicitation (Updated)] ASOG Complex EMCS Camp Murray, WA |

With GovernmentContracts, you can:
...control devices (e.g., signals, roundabouts, crosswalk devices) 7. Installation of multimodal facilities.... Installation ...
Moses Lake city
Bid Due: 11/25/2026
...control, planting, traffic control and other work. Involves 65 items and 60 working ...
State Government of Washington
Bid Due: 11/18/2026
...curbs and gutters, drainage pond and ditches, erosion control, illumination system, permanent signing..., ...
State Government of Washington
Bid Due: 11/18/2026
...Terminal Access Request Form" at the following location: http://www.wsdot.wa.gov/publications... at the terminal, traffic ...
State Government of Washington
Bid Due: 12/02/2026