| Location: | North Carolina |
|---|---|
| Posted: | Apr 23, 2026 |
| Due: | May 13, 2026 |
| Agency: | North Carolina State University |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Institution | UNC - Chapel Hill Academic Affairs | |||||
|
Institution URL for Additional
Information about this Project (Optional) |
https://facilities.unc.edu/ | |||||
| Project Name | Morehead-Cain Foundation Comprehensive Renovation | |||||
| Type of Services | Architectural/Engineering | |||||
| Project Manager | Nathan Harms | |||||
| Phone Number | (919) 452-5420 | |||||
| Contact Email | nathan.harms@fac.unc.edu | |||||
| Closing Date | 05/13/2026 | |||||
| Project Budget |
|
|||||
| Project Description |
One-Two Sentences
The Morehead Planetarium Building consists of the historic 1949 wing, Morehead Building, and an addition, built to the east, in 1974. The building presently houses program, educational and administrative space supporting multiple tenants, primarily Morehead Planetarium & Science Center and the Morehead-Cain Scholars Program This project will fully renovate that portion of the interior of the building occupied by the Morehead-Cain Foundation, repair & improve the exterior building envelope (including the roof), as well as renovate associated utility spaces located in the basements of both the addition and the original building. Improvements to the base building environmental systems are expected, including but not limited to: HVAC, plumbing, electrical, emergency power, Fire Alarm, and Fire Protection. Improvements to the building utilities and entry points will be evaluated for inclusion in the project as part of this design effort. A recent Advance Planning study to validate and refine the requested project program and establish a total project budget, was performed by Gensler Architects in early 2026, and will be made available to the selected firm at time of Award. At this time, it is expected that the construction effort will be performed by a Construction Manager at Risk (CMR), to be selected via public advertisement (SCO) process. UNC is seeking statements of qualifications from Architect led project teams, including engineering disciplines as follows: 1. Site/ Civil 2. Building Envelope Specialist 3. Mechanical, Electrical, Plumbing, Fire Alarm, Fire Suppression 4. Telecommunications 5. Structural 6. Cost Estimation The current project authorization is for advance planning only. The selected firm may be retained through full design and construction at the University's option.
|
|||||
|
Submit Letters of Interest
and Current SF-330 to: |
(Contact Person, Name of Institution & Address)
UNC Facilities Planning & Design Nathan M. Harms, RA LEED-AP Giles Horney Building 103 Airport Dr Chapel Hill, NC 27599
|

With GovernmentContracts, you can:
...Solicitation Number: 580#OCS 26-05-06 Project Title: RFQ for Mechanical Engineering Design...) for Mechanical ...
State Government of North Carolina
Bid Due: 6/03/2026
...: Fire Protection Sprinkler System WC27: Mechanical (HVAC) WC27A: Plumbing WC27D: Test &...
North Carolina State University
Bid Due: 6/18/2026
...flashings and sheet metal down to the steel deck on Roof Sectors A ...
State Government of North Carolina
Bid Due: 6/12/2026
...on Scope of work will include full replacement of mechanical, electrical and plumbing ...
North Carolina State University
Bid Due: 6/12/2026