Attachment 5 – System Performance Requirements
Measurement of Transaction Times
Command transactions times are measured from operator action until visual response or
operation completion. Command transactions include both administrative transactions (e.g.,
logging in/out of the system, transitioning between modules) and operational transactions (e.g.,
entering data, searches, etc.).
Within the System, query transactions perform in the background while the operator continues to
execute other tasks. These types of transactions are measured from the time the operator submits
the query until the time the operator receives query results.
System Response Times
The table below lists the performance requirements for different types of transactions.
Activity
Command transactions
Command transactions with validation
Database queries
Extended queries (e.g., querying a database outside of the
requested solution)
Maximum Response Time
1 second
2 seconds
3 seconds
3 seconds
System Availability
The CAD System will be available 99.999 percent of the time and RMS and FRMS Systems will be
available 99.95 percent of the time. The following specification defines both System availability
and the method by which it is calculated, as it is used in other sections of this RFP:
1. The System will be considered available for use only when each of the following conditions
is met:
a. Installed hardware and software have power applied and are operating correctly
based on manufacturer specifications.
b. All functions necessary for creating, editing or searching for a record maintained by
the Systems are operating correctly.
2. System availability will be expressed as a percentage of the maximum expected availability
over a given period. The System must be available seven days per week, 24 hours per day.
RFP #27-10 | Attachment 5 – System Performance Requirements
City of Lowell, MA
RFP #27-10 CAD/Mobile, LRMS and FRMS
September 21, 2026
Page 2 of 2
3. Scheduled down time for System upgrades will not be construed as Hours System
Unavailable.
4. The percentage availability for any period will be calculated as follows:
(Total Hours in Period – Hours System Unavailable) x 100
Total Hours in Period
Ongoing System Performance
The following specifications describe the performance requirements for the Proposer’s System
following formal acceptance of the System by the City and throughout the life of the Contract
between the City and the Proposer:
1. The hardware and software components of the System must remain operational and
available for use by meeting the required System response times and availability.
2. The initial System hardware and software configuration should provide for all current and
future volumes as described in the RFP.
3. The hardware provided or recommended should meet the capacity expectations stated in
the RFP and continue to meet reliability and performance requirements of this RFP for a
period of five (5) years from Final Acceptance. The software provided should meet the
functionality requirements of this RFP throughout the lifetime of the application, as well as
continually improve on existing functionality.
4. The System must accommodate all volumes and other applicable sizing parameters
specified in the RFP.
5. The System must function effectively from all workstations, both fixed and wireless.
6. All files and tables can be updated online without adversely affecting System Performance.
7. Necessary back-ups can be done online without adversely affecting System operations and
without lockouts for updates.
8. The System can complete queries to interfaced databases without adversely affecting any
System Component and without tying up or locking up the workstations.
In the event that the System fails to meet any requirements of this RFP after Final System
Acceptance during the warranty period as well as over the lifetime of the Contract, the Proposer
must take appropriate steps to correct the problem and bring the System back into compliance
with the performance and reliability requirements at no cost to the City.
RFP #27-10 | Attachment 5 – System Performance Requirements