| Location: | Texas |
|---|---|
| Posted: | May 21, 2026 |
| Due: | Jun 8, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA301626Q0121 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
PLEASE READ CAREFULLY AND FOLLOW ALL INSTRUCTIONS IN THE RFQ ACCORDINGLY!
This requirement is being solicited as a 100% Total Small Business set aside. The NAICS code is 238220 Plumbing, Heating, and Air-Conditioning Contractors, PSC 4120 Air Conditioning Equipment and the SBA size standard is $19M. This requirement is for the purchase and installation of a total replacement of Legacy R22 Split HVAC System for B4983 at JBSA LAK 78236 in accordance with (IAW) the associated Statement of Work (SOW). Refer to salient characteristics and technical criteria listed in the attached RFQ.
PROJECT OVERVIEW. The contractor shall provide all labor, supervision, materials, equipment, tools, transportation, and quality assurance necessary to remove the existing HVAC system and install a new system meeting current Unified Facilities Criteria (UFC), American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE), National Fire Protection Association (NFPA), International Code Council (ICC), OSHA, and Air Force standards.
The contractor shall deliver a complete, operational, commissioned HVAC system.
Existing equipment: Rheem Condenser, RUUD Air Handler unit.
•No front-end control system is installed.
•R22 refrigerant system requiring full replacement.
•Existing Honeywell controller and wiring to be removed
Questions Due Date: All questions must be submitted in writing by email no later than Wednesday, 03 June 2026 at 10:00 AM CDT. Responses to questions will be posted by the Government on the SAM.gov, as received. Questions submitted after this date/time will not be considered.
Site Visit: A site visit is scheduled for Tuesday, 02 June 2026 at 10:00 AM at JBSA Lackland Luke East Gate Visitor Control Center, located at B1196, 2602 Luke Blvd 78236. Departure to the site will be promptly at 10:00 AM CDT.
Please arrive 30 minutes prior to sign in, wait in line, and retrieve your pass at the visitor center. The Government WILL NOT provide transportation to travel between the sites. Interested parties are required to have a copy of a valid REAL ID Driver’s License, vehicle registration and insurance on hand to receive a base pass. If the drivers license has not been updated to the REAL ID, interested parties will need a passport along with a drivers license. If this type of documentation is not provided a base pass will not be issued and attendance will not be granted.
*Requests to attend the Site Visit shall be received NO LATER THAN Tuesday, 26 May 2026 at 10:00 AM CDT and sent to both email addresses detailed below.
Contractors who already have base access are required to notify CO & CS via email of planned attendance and check in at the Visitors Center.
ATTACHMENTS:
| May 26, 2026 | [Combined Synopsis/Solicitation (Updated)] JBSA LAK HVAC Replacement System B4983 |
| Jun 4, 2026 | [Combined Synopsis/Solicitation (Updated)] JBSA LAK HVAC Replacement System B4983 |

With GovernmentContracts, you can:
...Follow NTX Access Control System Installation Active Contract Opportunity Notice ID 36C25726Q0496... requires ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/11/2026
...services for SABCS. At a minimum, required services include: access control and credential...
University of Texas at San Antonio
Bid Due: 6/22/2026
...control measures, earthwork, concrete improvements, accessible routes, parking improvements... including thermoplastic striping, picnic ...
Granbury city
Bid Due: 6/10/2026
...Project Description: BONFIRE REGISTRATION IS REQUIRED TO ACCESS DETAILS / BIDTABLE To access ...
Dallas Area Rapid Transit
Bid Due: 6/19/2026