| Location: | Washington |
|---|---|
| Posted: | May 20, 2026 |
| Due: | Jun 10, 2026 |
| Agency: | Pierce County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Northwest Landing Pump Station
Addenda: 0
Release Date: 5/20/2026
Due Date: 6/10/2026
The purpose of this solicitation is to secure services to perform a range of construction activities at the Northwest Landing Wastewater Pump Station located in DuPont, Washington. The work includes constructing a below grade reinforced concrete foundation with spill containment walls, installation of a polyethylene storage tank, ferric chloride compatible pump system, steel roof structure, emergency shower/eyewash stations, chain-link fence, gates, stairs, and various electrical conduit, water and chemical piping, cables, wiring, and other appurtenances necessary for a functional system. The chemical pump system includes control and alarm panels with Owner furnished equipment for connection to the existing SCADA system.
The work also includes extending power cables and conduits from the existing motor control center in the pump station to contractor provided electrical panels. The work also includes tapping the existing water service line and extension to the emergency showers. The pump station must remain operational throughout the work.

With GovernmentContracts, you can:
...to procure and install two galvanized steel piles for the Sucia Island Marine ...
Sammamish Plateau Water
Bid Due: 6/16/2026
...inspections, anode inspection, gauge vessel steel, anode renewals, 100% topside washdown, prepare and ...
State Government of Washington
Bid Due: 7/09/2026
...is seeking qualified firms to provide Fiber Reinforced Polymer and Steel BCT durable ...
King County
Bid Due: 6/16/2026
...galvanized steel piles for the Sucia Island Marine State Park Pumpout Station. 2. ...
State Government of Washington
Bid Due: 6/16/2026