| Location: | California |
|---|---|
| Posted: | Mar 5, 2026 |
| Due: | Mar 31, 2026 |
| Agency: | UCLA Capital Programs |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 943719.01 |
| Publication URL: | To access bid details, please log in. |
| Project Name | UCLA Westwood Center Suite 300 Reconfiguration - Low Voltage Cabling |
| Project Number | 943719.01 |
| Project Description |
Subject to conditions prescribed by the University of California, Los Angeles, sealed bids for a lump sum contract are invited for the following work:
Contractor shall provide the following: Remove existing data cabling and provide new cabling utilizing the existing network switch in Telecommunication Room 318x (TR-318x). Provide upgraded CAT6A ethernet cabling coordinating with the furniture installation schedule. Provide EZ-Path fire sleeves into TR-318x. Reference drawings and specifications for the detailed scope of work. The estimated construction cost is $125,000. TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (PREQUALIFICATION DOCUMENTS IF ANY; BIDDING DOCUMENTS; ADDENDA IF ANY; CONFERENCE/JOB WALK SIGN-IN SHEET; PLANHOLDERS LIST; PREQUALIFIED BIDDERS, IF ANY, ETC.), CLICK HERE: UCLA ONLINE PLANROOM |
| Estimated Construction Cost | $125,000.00 |
| 7828454 |

With GovernmentContracts, you can:
...furniture supply, spatial layout validation, delivery, staging, and certified installation services... Follow 149 ...
DEPT OF DEFENSE
Bid Due: 8/04/2026
...of work: repairs, retrofits, and/or replacement of the furniture, fixtures, and equipment located... ...
Marin County
Bid Due: 8/06/2026
...from the Corps of Engineers, Huntsville Center, Furniture Team. Please find the attached ...
DEPT OF DEFENSE
Bid Due: 7/29/2026
..., to procure and install recreational furniture for multiple Marine Corps Installations - ...
DEPT OF DEFENSE
Bid Due: 7/24/2026